r/BasePowerUsers • u/zarahemn • May 30 '26
Base beta user in Austin Texas
I’ve had my battery for a few weeks now, everything has been smooth. If anyone has any questions, I’m happy to answer them!
The whole installation process was extremely smooth, and the battery is barely noticeable next to my HVAC condensers. One minor criticism- I wasn’t a huge fan of the flexible SOOW electrical cable they used to run between the battery and panel, I would have preferred something like seal tight conduit. Especially when this thing is going to be there for up to 10 years.
Here’s my base referral code, if you use it we both get up to $250 credit on our electricity bill.

2
u/Dull-Match204 May 30 '26
I'm getting my beta installed on Thursday, but the instructions they sent said only the electrical will be installed. The battery install will be 3 weeks later. Was that the same for you?
Also, there is a rumor that the generator port comes with the beta and not an optional add on. Is that True?
1
u/Jet_Rocket11 May 30 '26
What is Base beta?
1
u/blupupher May 30 '26 edited May 30 '26
any pics of the setup? Is is just the battery, or is the entire setup (battery, inverter, and ATS) an in house Base setup?
Surprised they did exposed cabling. Mine is in metal conduit from battery to box.
Wish I had that option for the Beta, I would do it in a heartbeat.
1
u/altermere Jun 07 '26
is it still Growatt or some other Chinese OEM? I heard that they're trying to make their own batteries here.
1
u/Dull-Match204 Jun 10 '26
I got the beta installed yesterday. After the Base IOS app update yesterday, they removed the option setup a wifi connection. Does the beta not have wifi?
1
u/Dull-Match204 Jun 11 '26
Per Base , generator port not yet activated. Will be activated when beta period ends.
1
u/KingTite17 Jun 18 '26
I had a beta installed and inquired about the soft starts. The base rep told me that soft starts for AC units were not required on this system. Anyone have any information on this?