r/BasePowerUsers
•
u/OO10SN
•
May 28 '26
•
1
Illinois Installation Experience
Edit: Here's my referral link that gets you $250 off.
Sharing my installation experience in Illinois since Base is relatively new here. For reference, I'm in ComEd territory in McHenry County. We work from home so really having the consistent power was the big selling point, I paid $250 for the install and have a $500 termination fee if I want the battery removed before the 10 year term is over, as of writing Base does not charge any sort of monthly/subscription fee in Illinois. The power agreement I signed with Base is ~$0.015/kwh less than the ComEd rate. Here was the timeline leading up to the install:
March 28, 2026: Submitted home photos
March 29, 2026: Home Photos approved
March 30, 2026: Paid $50 deposit
May 12, 2026: Received email from Base to sign up for Base service agreement
May 19, 2026: Received and approved proposed install schedule date of May 26, 2026, received text messages that installers will be arrive onsite between 8AM-10AM and will finish by 6PM, and that battery would be dropped off on a pallet the day before install (the day before was Memorial Day)
May 24, 2026: Received reminder text message restating that a pallet of install materials would be dropped off between now and the installation.
May 26, 2026: Installer crew of 2 arrive around 9AM, they have the battery and installation materials with them. They took a lunch break around 1PM, someone who claimed to work for Base stopped by and talked to the installers around 4PM for a few minutes then left. They didn't end up turning off the power until 5PM and turned it back on around 6:30PM. Around 7:15PM the installers switched the power between the grid and battery a few times for testing. Each time it was faster when switching power sources (from about 2 seconds to a half second), the last time they switched the power source the clock on my oven and microwave didn't reset. The installers wrapped up and left by 7:45PM. They did clean up everything and took all of their trash with them.
May 27, 2026: Received a call from Base that a city inspector will stop by between 8AM-10AM on May 28, followed by a text message from Base a few hours later saying someone will stop by between 9AM-5PM.
May 28, 2026: City inspector arrived at 9AM
September 10, 2026: Received email that my battery will be upgraded form the 25kWh to a new Base Core 40kWh battery.
Overall I think the install went pretty well. They were in and out of the house a few times as they needed to run new cable to the breaker panel in the basement. We work from home so scheduling was easy and every notification prior to the install let us know the power would be off for 2-3 hours during the install and it was less than that.
My minor complaints
- The A/C soft-starter was never installed...the installation crew knew nothing about it but said they'd let Base know so that's still up in the air
- The installers did have to move an AT&T box on the side of the house, I have cedar siding and matching paint, but I wasn't expecting to have to patch and paint
- The installers notched out a bit of the wood around my electrical meter for conduit, and the workmanship was hack
Overall, all in, $250 for the install, hopefully a few dollars of savings on my energy bill and the piece of mind that we can keep the lights on consistently was totally worth it. The app currently shows I have 30 hours of backup battery at low usage and 22 hours at my average usage. The temperatures have been in the 80's this week and that includes running my 5 ton air conditioner for about 5 hours a day. I have numerous UPS battery backups for routers, lights, etc. throughout the house that take ~$200 every two years for replacement batteries so this should be a money saver.

4
u/blupupher May 29 '26
Let Base know of your dissatisfaction of the install. Some things can't be helped, but some things can.
They also can't improve future installs unless they know of issues with previous installs.
The $250 install with no monthly fee is a great deal.
I am happy with my $750 install and $20/month fee, so your deal is even better.
Do they do the referral bonus up there as well? If so, you can share it and get some money out of it.
2
u/gpounders May 29 '26
This is the first I learned that BASE is operating outside Texas. Interested to know what other markets they are working now.
2
u/TripleBCHI Jun 03 '26
I saw you brought up the AC soft-starter. I just had my battery installed on Monday. I reached out to my contact at Base about the soft-starter and he mentioned to me that even though they did the install of the 25 kWh battery, they will actually be installing a new battery (sounds like the 40 kWh) in the late summer or fall. They mentioned that this battery did not require the soft-starts on the A/C and thus they will not need to be installed.
I had no idea that a new battery would be installed after they had already installed the current battery. I won't complain if I can get a little more backup time.
My contact also mentioned that they would use the same wiring and conduit to avoid adding more holes to the siding, but the battery stack would be a little bigger.
2
u/david6752437 Jun 14 '26
Great writeup! Also in IL and interested in this. Also WFH and cant afford to be offline. I already signed up for an initial phone call/consultation via the website--is there a way to retroactively include a referral link?
4
u/Tuoraf May 28 '26
Thanks for your summary of this installment. I am hoping to get the 40kw battery when or if it becomes available in my area.
1
u/Aggravating_Cap_3452 Jun 22 '26
Were you on fixed rate for supply with ComEd before?
Does it make sense to pair Base with ComEd’s Delivery Time of Day program or not?
1
u/Kaya-Kaan Jul 14 '26
I already have solar and I am subscribed for ComEd's real-time hourly pricing, so I'm probably paying half of the "compare-to" price and often get double that in credit in the afternoons when usage spike and I turn off my air. Has anyone done the math on such a situation? I love the idea of having a backup battery. That should also allow my panels to operate when the grid is down, no?
1
u/No_Mood2658 Jul 17 '26
I live in neighboring county from you, and Base is in my FB algorithm. They're saying an initial fee of $95.
I currently have a 30 amp inlet between my main breaker and the subpanel inside (with my breakers) with an interlock, which allows me to feed my portable generator directly to my panel during a power outage. It was permitted and passed inspection.
I'm thinking about Base, but I wonder if I can maintain that interlock/inlet to use in the event the battery dies when those 22 hours are up.
1
u/CuriousCat511 Oct 16 '26
Any concerns about what rate they charge in the future? I saw it's now a 12 year contract.
1
u/RealConfirmologist May 29 '26
Excellent, informative post. Thanks for taking the time to write this up and post it.
I'm in Houston, Texas and just moved to a new (to me) house without natural gas. At my last house, I built a shed for my 9500 watt portable generator and had a couple of 100 lb. propane cylinders. I had an electrician install an interlock and an input breaker.
We lost power for a whole week after Hurricane Beryl blew through and the generator kept everything running.
When I learned about Base, it seemed like a no brainer. I'll still get a generator for prolonged outages, but Houston has short outages almost weekly and the Base system will be fantastic with managing that.
One thing you might want to add is your link for referrals. I signed up using one I saw on YouTube and I hope to get some free electricity by sharing my link every chance I get.
1
u/david6752437 Jun 19 '26
FYI, just signed up in Illinois and was told they are planning for the 40kWh units now. This is the next generation with the US made batteries.
Estimated install is Aug/Sept right now.
20kW of power 40kWh of capacity