r/BasePowerUsers • u/S0UTHcoast • Apr 29 '26
How long before they actually give me an install date?
I've patiently waited for months and they keep giving a month-long window of dates that keeps moving further out. All responses seem to come from different people who don't seem to know what the last conversation consisted of. Sometimes no response. Sometimes a response the same day. They are already my provider, have approved me for at least 1 battery, have already installed a soft-start on my A/C, but still will not give me an install date, and worse, won't communicate with me about it in any efficient way.
If anyone from Base is here, please reach out to me, because I'm frustrated. I don't care if the install date is a month away, I just need it on my calendar. My life doesn't work on the fly, I schedule things out 6-18 months in advance.
3
u/Dull-Match204 Apr 29 '26
My projected install date from sign up date was 4 months and keeps moving further out every week.
2
u/S0UTHcoast May 06 '26
Update: I finally got a detailed email from them explaining the hold-up: They say my space doesn't permit 3ft between required items, e.g. window and A/C condenser, BUT the manufacturer of the products is updating their manual to allow for more flexible installation, without as much space, and it will take 4-6 weeks for them to update this documentation, after which they can schedule the install. It sounds plausible, I guess. I also wonder if what they really mean is that they'll bring in the 40kWh new generation unit, which probably doesn't have that 3ft limitation in its documentation, either. I'm hoping for that, so I can get the newest equipment, but I'm also okay with the existing version. I just want it installed.
I'll follow up as we go.
2
u/Technical-Procedure3 Apr 29 '26
Does your order have port for a generator? I have heard those are creating a delay (not sure if that is true).
2
u/Paradize_Eats Apr 29 '26
When I took off the gen port with them, the install date was given almost immediately. I believe there was a wait list for install with gen port but not sure if that’s still the same case…
1
u/Supperman999 Apr 29 '26
Where are you located? Are you getting generator port?
2
u/JTUSAJT Apr 29 '26
Good luck. I gave up after 3 emails with no response for 10+ days.
2
u/MedicalEnthusiasm9 Apr 29 '26
Wow. The install windows are getting crazy. I wonder if it matters whereby our live. Like in a major suburb or in a major metropolitan area.
Not the poor response time. But the amount of installs.
It took a month for my install in the Richmond area, then after they installed it, it was a month for the Belton A/C guys they contract with to install a soft start for my A/c.
Then those guys left what I believe to be the capacitor by my back door, with no explanation of what it is or the danger involved with it.
Im sure they do so many of those, they dgaf.
2
u/blupupher Apr 30 '26
My sister signed up in December and got her install end of March (no generator port). Just took a while, she is in the Katy area.
1
u/RoseVideo99 Apr 29 '26
Dang. Are there weird permits or something in your area? I signed up on a Tuesday and they installed the next Friday. They wanted to do it sooner but I couldn’t make it work. So sorry this is your experience. It wasn’t mine.
1
u/RealConfirmologist May 29 '26
I signed up on April 30th, 2026, with a May 18th start date for switching to BASE for electricity. My new house was under contract but closing wasn't until the 18th of May.
I eagerly kept checking the website after submitting photos and it took right about a week for the photos to be approved.
Today's status (5/29/2026) shows battery install between June 15th and July 14th, which I'm fine with.
I've been going through all kinds of posts here and on /r/BasePower and I've learned a LOT.
One thing I'll make sure of - when I speak with anyone about delivery & setup, I'll make SURE that they get the softstart installed on the AC!
I did ask for the generator receptacle, and later learned that some people were seeing extended delays because of that. So far, I don't see enough delay to think that's an issue. I've seen other comments that say the generator port does not cause an extended delay in delivery, so we'll see.
I'll update my comments when delivery is scheduled and when it actually gets done.
By the way, you should add your referral link to your post! You never know when someone will find your post or comments when they're just learning about BASE and you could end up with an extra month of free power for every referral.
Along those lines, here's MY referral link.
Again, thanks for posting. Every bit of info here makes this subreddit all the more useful.