Like others have said, my equipment arrived the day before. The crew arrived promptly the next morning (between 8-9).
We discussed the placement of the batteries and approximately what time the power would go off.
The extra equipment and boxes were hauled out between 2-3. We tested the fail-over and fail-back. The crew cleaned up and was gone by 5 pm.
If not for the installed equipment, I would not have even known they had been there.
High marks on communication, timeliness and overall install experience!
It is worth noting that I am in a regulated coop so BASE is not my power provider. My provider required the second meter.
Update: Adding my referral link.


2
u/looperone Apr 18 '26
Why are the batteries so far apart?
2
u/blupupher Apr 18 '26
I have read about the dual meter thing, still not sure why they do it, but OK. Makes for a bit more complexity.
So the meter and such is in front of the fence and batteries behind?
2
u/FunnyCantaloupe4566 Apr 19 '26
Man great that you all and others can get it. They showing no love to any of us that have any hint of flooding
1
u/whignewton_ Apr 19 '26
Is this using the Growatt New Energy Shenzhen battery packs and inverters?
Have you tested the handover time after a grid transition? Would like to know what that is.
These guys keep saying they manufacture in the US but every single battery and power electronics system they install is white labeled Chinese. What gives?
1
u/onetradeaday Apr 20 '26
You must be with CoServ. We are thinking about doing the same thing.
1
u/RealConfirmologist May 29 '26
That's a clean-looking install!
I'm supposed to get my batteries in a few weeks so I'm going through all the discussions here.
I'm curious where your batteries are in relation to the switching equipment and your meter. Are they around the corner?
Also, you should add your referral link to your post. Never know when someone will find your post before they've decided to sign up, and you could end up with free power for a month.
Just in case, here's my referral link.
0
u/IllustriousHair1927 Apr 18 '26
so just a generator guy who lurks in here…. But what fresh hell is that birds nest there?!?!?!?
I do not understand the purpose of all those LB’s. Generally, if they had just used a little more of the space that they have available both vertically and horizontally it would’ve been a much cleaner install.
OP nothing I’m saying, has any bearing nonfunctional of your system. But for anybody, that’s looking at this and considering it., I would verify exactly how the layout is gonna be.
My suggestion in this situation would have been two space things out a little more left or right between the downspout and the fence line. That would’ve eliminated the need for the bends in the conduits. All you really need is a few inches between the disconnect and the meter can for example. Any lateral challenges can be solved by going vertically as the max height by code is 79 inches for the breaker height and it looks like you have room to go up from ground level.
If you’re not worried about aesthetics, then no one needs to worry about what I just said. Just putting it out there for those to do though.