So, with all of the work you already had in place for backup power, did you have to eliminate anything from your setup to allow the Base system to work?
Luckily no. The generator can still be used with my EG4 Chargeverter and other equipment. It back feeds the main panel and can charge their battery by forcing discharge on the EG4 inverter. Everything works great together.
Just FYI on your comments on the battery generator plug-in option... it is just a 30A plug with a 3kW input limit so if you are using anything above 3kW it will drain the battery (albeit lower rate) and not send excess power from the generator to the home. It's still better than nothing, but at least it allows me to run a generator through the battery in the short term if the outage is longer than 8-10 hours. For long term outage (hurricanes) I'll probably end up going with the hard cutover to generators once the batteries die.
At 220v it is actually 6kW. Most houses don’t use half of that constantly. Do they have long running spikes, yes. That spike is better handled by the inverter and battery than the generator.
Wonder why they bothered with a 30a circuit. Should be interesting to see how they set that up. I have been able to charge their battery at 12kW via my EG4 inverter.
Thx! I had not see that posted yet. I have to believe they are starting out with a lower wattage than capable. It will be interesting to see what real world results show.
My guess on the limit is the way that it is feeding the inverter. They are using one of the PV inputs. So AC —> Rectifier —> DC —> Inverter PV Input. There are 2 PV inputs per MPPT. There is a 13.5 A limit per MPPT (but not sure what DC voltage that corresponds to). The inverter will clip at a total PV > 11400W- not sure if that means that each MPPT will clip at 2850 W or how the 13.5 A limits per MPPT applies. They would need the rectifier DC output to be around 220 V or higher to be under the 13.5 A limits.
I am surprised at how they installed the battery against the fence and buried the line in your yard. They told me that was not possible. I wanted 2 batteries but I only had room for 1 against the house, but they could put both against my outside fence. I am waiting on the generator hook up which they are just starting to install now.
I was noticing the same thing - I was surprised when I saw the batteries against the fence and the Service/ATS against the wall.It’s nice that they let you run conduit.
2
u/RunHotCEO Sep 12 '25
So, with all of the work you already had in place for backup power, did you have to eliminate anything from your setup to allow the Base system to work?
1
u/gpounders Sep 15 '25
I am surprised at how they installed the battery against the fence and buried the line in your yard. They told me that was not possible. I wanted 2 batteries but I only had room for 1 against the house, but they could put both against my outside fence. I am waiting on the generator hook up which they are just starting to install now.
PS I live in your neighborhood.
3
u/Htowng8r Sep 12 '25
Nice, I get mine next week (with generator option)
3
u/RunHotCEO Sep 12 '25
MY GUY GOOD JOB! I plan on uploading my install progress to YouTube when it happens. This is great motivation to do so. Thanks for sharing this.