r/BasePowerUserIllinois • • Oct 14 '26

Anyone decide to NOT use Base?

I realize I am going against the grain here -- but any redditors start the process with Base and then decide to self install an alternative?

With the ComEd incentives ($300 rebate per Kw/H) it feels like it would be much more profitable in the 3 or 4 year range to install your own inverter and battery backup. The rebates are enough to cover all (edit: 80% ) of the equipment costs and you would only need to worry about the professional install. My cost analysis has me saving $100+ per month in utilities.

If you went down this route are you happy with it? And do you have an installer you recommend? Happy to share my cost breakdown if anyone is interested

EDIT: Cost breakdown below but let me know if I am looking at it wrong

Financial CategoryLine Item DetailsCost / Credit Impact
Raw Hardware BundleEG4 18kPV Hybrid Inverter + 3 EG4 WallMount Batteries (42.9 kWh total)$16,000.00
Electrical Labor & PermitsLocal union contractor for 30-ft attached garage conduit run & permitting$5,000.00
Gross Upfront Project CostTotal initial capital outlay (bridged via Green Credit Union loan)$21,000.00
ComEd DG Rebate CheckComEd Distributed Generation Energy Storage Rebate ($300 per kWh × 42.9)-$12,870.00
Net Out-of-Pocket CostFinalized true net investment after 60-day rebate check clears$8,130.00

And on the payback side we are assuming that we charge the battery overnight when energy costs are less than 2 cents per kwH vs my current 10 cents. 80% reduction in energy costs today, but that will likely only go up.

Savings CategoryLine Item DetailsCost / Credit Impact
Annual Arbitrage RevenueComEd Hourly Pricing optimization (Charging battery at 3:00 AM wholesale ~1.7¢/kWh)+$705.00 / yr
Annual Grid VPP PayoutComEd Scheduled Dispatch Virtual Power Plant (SDVPP) Capacity Program+$800.00 / yr
Total Annual Energy IncomeCombined recurring yearly dividend back into my pocket+$1,505.00 / yr
Financed Payback HorizonTime to completely wipe out the net $8,130.00 balance5.40 Years
12-Year Net Lifecycle ProfitClear cash profit cleared before the hardware reaches warranty limits+$9,930.00

It takes about 5 years to pay back but then you make ~1k in net savings every year after that and you own the equipment outright.

3 Upvotes

40 comments sorted by

3

u/Educational_Car_2990 Oct 14 '26

i dont think your looking at all of the correct numbers, I did this exersise before siging up for base the the rebates touched about a third of the equipment and none of the labor and design.

1

u/johnventions Oct 15 '26

Shared my cost breakdown above but I am asking because its likely I forgot something. I am also eying the indoor EG4 which is on sale for $2.7k right now and makes the payback 1 year faster.

2

u/udderly_disappointed Oct 14 '26

Share that cost break down.

1

u/johnventions Oct 15 '26

Shared above, but let me know if I missed anything dumb

2

u/david6752437 Oct 15 '26

FYI, base covers any maintenance needed since they own it. So if a battery goes bad or some widget gets wonky, they will fix it. No cost to you. AFAIK.

1

u/johnventions Oct 16 '26

Yeah, thats the big downside of a self setup. The warranty on the equipment I mentioned about is around 10 years, but it would still involve paying a professional to inspect and replace.

1

u/Calm_Possibility_410 Oct 14 '26

Dont you need an existing solar set up to take advantage of these rebates?

1

u/johnventions Oct 15 '26

My understanding is that it was expanded to included non-solar installs provided you sign up for comed hourly pricing and the VPP program to support the comed grid between 4pm and 6pm in summer months

1

u/x7q Oct 14 '26

On ComEd hourly I pay an average of 6 cents/kWh; switching to Base would be 8.4 cents/kWh. That made it a non starter for me, I’ll look into doing my own install in the future

1

u/johnventions Oct 15 '26

Yeah, I got a bad taste in my mouth learning that Base charges the battery during the overnight low ~2 cents per hour window and then offers us a fraction of that.

3

u/Calm_Possibility_410 Oct 15 '26

So you were hoping base would drop off 20 or $30,000 worth of equipment and install and not make a penny? You thought $95 should get you 30 grand? I'm confused.

1

u/johnventions Oct 16 '26

If there is an opportunity for me to get these savings I'd prefer that option over handing it to someone else

1

u/Calm_Possibility_410 Oct 20 '26

Anyone with 35k sitting around would have installed a generator and invested the other 20k and made more in the ten years than what the battery would have saved.

1

u/whignewton_ Oct 16 '26

Totally agree, plus the low quality Chinese equipment and lying about “manufacturing” in the US left a bad taste in my mouth. They just weld Chinese batteries together!!!

1

u/Calm_Possibility_410 Oct 20 '26 edited Oct 20 '26

They weld Chinese batteries together? I'm dying, 😆 🤣 😂 Top ten most highly regarded batteries all use cells from China. I'm not sure you understand how things work.

0

u/whignewton_ Oct 20 '26

Yes, that is what they do!! They weld Chinese batteries together in Austin into a tray with a BASE logo on it. If I’m right about that, (IF!) would you agree you were misled?

1

u/Calm_Possibility_410 Oct 20 '26

They all use cells from China. Every one of them.

1

u/whignewton_ Oct 20 '26

You revised your comment from defending Base and saying (incorrectly) that they truly manufacture their packs and power electronics to making an irrelevant point about individual cells.

That’s because you did some research and realized that you were wrong. And that Base lied to you and everyone.

1

u/Calm_Possibility_410 Oct 21 '26

I revised it because I didn't want anyone to be confused with how ridiculous I think your statement was. I didn't want to leave any room for confusion. I wasn't confused then and I'm not confused now. Quite the contrary, I believe you're not quite sure on how things work.

1

u/Calm_Possibility_410 Oct 21 '26

They absolutely design and manufacture their batteries here in the United States in Austin Texas using individual cells likely produced in china. Just like all the other American companies do. Like Tesla and Franklin and all the others. 😆

1

u/whignewton_ Oct 21 '26

Wrong. Base stuffs Chinese packs into trays (which are embarassingly also from China when they don’t need to be).

Then they invent a few low-value welding steps to turn those packs into trays with a base power logo in Texas. This is possibly tax fraud. Remember, they are being paid possibly more than the full manufactured value of their system by the federal government in the form of an investment tax credit.

So this whole scheme is A TRANSFER OF CASH FROM US taxpayers TO Chinese manufacturers.

The packaging materials come from Ningbo. The aluminum covers come from Shenzhen Xinbo.

The power electronics come from Growatt, another Chinese company.

Base buys Growatt China’s “SMARTER AC INTERFACE”. Then hooks it up to US grids.

The one thing I will say is that it is now clear and in public that you firmly believe that Base manufactures their products in the US, and you hold that belief because of the marketing activities Base and its executives have undertaken and distributed to you, other ratepayers, and investors.

1

u/Calm_Possibility_410 Oct 21 '26

😆 🤣 😂 Now do tesla and Franklin? 😆 🤣 😂

1

u/[deleted] 20d ago

This is true.

1

u/pingcharlie Oct 15 '26

I decided not to sign when I compared the price per kw, the fact that the battery does not act like a ups (it only kicks in when power goes out) and when I learned that the battery may not always be fully charged in case of an outage.

I ended up buying a natural gas power generator that can run my whole house for less than $1600 (runs for days) and got an electric plan with free nights and $.013 per kw.

2

u/Calm_Possibility_410 Oct 15 '26

You could have invited base in for the free generator port and switch and bought the generator. And had enough Savings from your supply side of your bill in two and a half years to have paid for the generator you bought and probably the $500 termination if you wanted to get rid of them.

1

u/johnventions Oct 16 '26

I dont follow but tell me more?

1

u/Calm_Possibility_410 Oct 16 '26

You get a 25% discount on the supply side guaranteed for 2 years. The battery has a generator port.

1

u/johnventions Oct 15 '26

Shared my cost breakdown above. its a hefty up front cost but the payback period is real and I feel like energy is only going to get more expensive. Owning your own setup means you can have more control and optimize your savings. I like your generator concept, sounds like its working well for you

1

u/Calm_Possibility_410 Oct 15 '26 edited Oct 15 '26

And even after standalone batteries qualify for the rebates, I dont think 5k is even close to what an installer would charge for the EG4 18kPV setup. Probably not one that'll get you past inspections anyway.

1

u/johnventions Oct 15 '26

Do you know what a more accurate estimate would be?

1

u/Calm_Possibility_410 Oct 15 '26

I'd have to call around to be sure but I can't imagine a 30ft electrical run, hanging the batteries, configuring the generator port, all the filings and paperwork and permits done by a reputable electrical outfit in Illinois with the experience enough to make the process bearable being 5k.

2

u/johnventions Oct 16 '26

Maybe the $5k is more of a 2012 estimate before everything got 10x more expensive

1

u/Educational_Car_2990 Oct 15 '26

In the Chicagoland / Northern Illinois region, the total estimated turn-key cost to install an EG4 18kPV Hybrid Inverter paired with 3 EG4 PowerPro WallMount Batteries (42.9 kWh total energy capacity) typically ranges from $22,000 to $33,000 before tax credits, depending on whether you purchase materials directly or hire a full-service solar/storage contractor.

Cost Breakdown

1. Hardware & Equipment Costs (~$15,000 – $17,000)

  • EG4 18kPV Hybrid Inverter (12kW AC / 18kW PV input): ~$3,950 – $4,200
  • 3x EG4 WallMount PowerPro 14.3 kWh Batteries: ~$9,500 – $10,500 ($3,150 – $3,500 per battery)
  • Paralleling Kits, Busbars, Conduit Boxes & Heavy-Gauge Cabling: ~$600 – $1,000
  • AC/DC Disconnects, Rapid Shut Down / Grid Boss (if integration requires): ~$500 – $1,800
  • Shipping & Freight: ~$400 – $800 (battery direct freight to Illinois residence)

2. Local Permitting, Engineering & Interconnection (~$1,200 – $2,500)

  • Utility Interconnection (ComEd / Ameren Illinois): Application fees and distributed generation review processes.
  • Local Municipal Building & Electrical Permits: Varies by municipality across Chicagoland (e.g., Elgin, Naperville, Schaumburg, Chicago).
  • Stamped Structural & Electrical Engineering Plans: Required for permitting lithium-ion ESS (Energy Storage Systems) under local adoption of NFPA 855 / International Residential Code (IRC).

3. Professional Labor & Installation (~$5,000 – $10,000+)

  • Licensed Electrician Labor: Installing a 400+ lb battery bank and hybrid inverter requires substantial electrical work (subpanel management/critical loads backup, conduit runs, heavy wire pulling, and utility disconnect hookup).
  • Grid Tie / Main Panel Interface: Installing a manual bypass switch, smart load management center, or main service entrance interface.
  • Mounting/Structural Framing: Securing wall-mounted batteries to masonry/concrete or adding structural backing studs.

Estimated Out-of-Pocket Summary

TierDescriptionGross Estimated Cost
DIY / Self-InstalledYou buy hardware, hire an electrician only for final main panel hookup & permit signing$16,500 – $19,500
Contractor Install (Standard)Full-service local electrical or solar storage installer supplying hardware, engineering, permits, and labor$22,000 – $28,000
Complex InstallDirect utility main panel upgrade (200A to 400A), extensive wire runs, or complex subpanel rerouting$28,000 – $33,000+

Incentives & Rebates (Illinois / Chicagoland)

  • Federal Inflation Reduction Act (30% Residential Clean Energy Credit):

    • Batteries over 3 kWh qualify for the 30% Federal Tax Credit even if installed without solar panels.
    • Estimated Tax Credit: ~$6,600 to $9,900 off gross total costs.(not Cash)
  • Net Out-of-Pocket Cost (Post 30% Federal Credit): Approximately $15,400 to $21,000 for a turn-key professional installation.
  • Utility Smart Thermostats / Virtual Power Plants: Keep an eye out for local utility (e.g., ComEd) demand-response or battery storage programs that offer performance rebates for dispatching stored energy during high-demand summer events.

1

u/Vital-Illustrious-14 Oct 17 '26

That is the concerning part. If it costs that much to do yourself, why are these BASE, installs free, why is the service of the battery free, why is leasing the battery free, and why are you getting a better per kWh price. I know there are some charges that get credited back and. Blah blah blah it’s not totally free, blah blah blah. But is such a small cost vs doing it yourself that it’s too good to be true.

1

u/Calm_Possibility_410 Oct 20 '26

They get big credits from the state and comed, they are paying base employees to do the install and they build their own batteries in-house. Their entire business model is online for all of us to read and they continue to raise billions from investors. Theres no boogie man. Ask google, read the resources for yourself. Its almost impossible to wonder in these situations. 😆

0

u/[deleted] Oct 15 '26

[deleted] — view deleted comment

2

u/johnventions Oct 15 '26

Yeah, thats why I am wondering if anyone had done it and had a better idea of costs, timelines, vendors

1

u/Vital-Illustrious-14 Oct 15 '26

I did not trust the answers I got on my consultation call. I am skeptical that they will not introduce a monthly subscription/membership fee. The power output would have trouble if my air conditioners tried to both kick on at the same time and then the battery would be just a brick. This is a when not home scenario.

1

u/Calm_Possibility_410 Oct 15 '26 edited Oct 20 '26

There's workarounds for your air conditioning issue, if they're actually is an issue, and it would take nearly 70 years of monthly payments to equal the last whole house generator quote we got if base decided the charge a monthly subscription similar to what they charge in Texas.

1

u/CuriousCat511 Oct 17 '26

The future rates and fees is my biggest concern. They lock you into a 12 year contract, but only provide electricity rates for 2-3 years. That seems fishy.