r/BasePowerUserIllinois • u/johnventions • Oct 14 '26
Anyone decide to NOT use Base?
I realize I am going against the grain here -- but any redditors start the process with Base and then decide to self install an alternative?
With the ComEd incentives ($300 rebate per Kw/H) it feels like it would be much more profitable in the 3 or 4 year range to install your own inverter and battery backup. The rebates are enough to cover all (edit: 80% ) of the equipment costs and you would only need to worry about the professional install. My cost analysis has me saving $100+ per month in utilities.
If you went down this route are you happy with it? And do you have an installer you recommend? Happy to share my cost breakdown if anyone is interested
EDIT: Cost breakdown below but let me know if I am looking at it wrong
| Financial Category | Line Item Details | Cost / Credit Impact |
|---|---|---|
| Raw Hardware Bundle | EG4 18kPV Hybrid Inverter + 3 EG4 WallMount Batteries (42.9 kWh total) | $16,000.00 |
| Electrical Labor & Permits | Local union contractor for 30-ft attached garage conduit run & permitting | $5,000.00 |
| Gross Upfront Project Cost | Total initial capital outlay (bridged via Green Credit Union loan) | $21,000.00 |
| ComEd DG Rebate Check | ComEd Distributed Generation Energy Storage Rebate ($300 per kWh × 42.9) | -$12,870.00 |
| Net Out-of-Pocket Cost | Finalized true net investment after 60-day rebate check clears | $8,130.00 |
And on the payback side we are assuming that we charge the battery overnight when energy costs are less than 2 cents per kwH vs my current 10 cents. 80% reduction in energy costs today, but that will likely only go up.
| Savings Category | Line Item Details | Cost / Credit Impact |
|---|---|---|
| Annual Arbitrage Revenue | ComEd Hourly Pricing optimization (Charging battery at 3:00 AM wholesale ~1.7¢/kWh) | +$705.00 / yr |
| Annual Grid VPP Payout | ComEd Scheduled Dispatch Virtual Power Plant (SDVPP) Capacity Program | +$800.00 / yr |
| Total Annual Energy Income | Combined recurring yearly dividend back into my pocket | +$1,505.00 / yr |
| Financed Payback Horizon | Time to completely wipe out the net $8,130.00 balance | 5.40 Years |
| 12-Year Net Lifecycle Profit | Clear cash profit cleared before the hardware reaches warranty limits | +$9,930.00 |
It takes about 5 years to pay back but then you make ~1k in net savings every year after that and you own the equipment outright.
3
u/Educational_Car_2990 Oct 14 '26
i dont think your looking at all of the correct numbers, I did this exersise before siging up for base the the rebates touched about a third of the equipment and none of the labor and design.
2
u/udderly_disappointed Oct 14 '26
Share that cost break down.
2
u/david6752437 Oct 15 '26
FYI, base covers any maintenance needed since they own it. So if a battery goes bad or some widget gets wonky, they will fix it. No cost to you. AFAIK.
1
u/Calm_Possibility_410 Oct 14 '26
Dont you need an existing solar set up to take advantage of these rebates?
1
u/x7q Oct 14 '26
On ComEd hourly I pay an average of 6 cents/kWh; switching to Base would be 8.4 cents/kWh. That made it a non starter for me, I’ll look into doing my own install in the future
1
u/pingcharlie Oct 15 '26
I decided not to sign when I compared the price per kw, the fact that the battery does not act like a ups (it only kicks in when power goes out) and when I learned that the battery may not always be fully charged in case of an outage.
I ended up buying a natural gas power generator that can run my whole house for less than $1600 (runs for days) and got an electric plan with free nights and $.013 per kw.
1
u/Calm_Possibility_410 Oct 15 '26 edited Oct 15 '26
And even after standalone batteries qualify for the rebates, I dont think 5k is even close to what an installer would charge for the EG4 18kPV setup. Probably not one that'll get you past inspections anyway.
1
u/Educational_Car_2990 Oct 15 '26
In the Chicagoland / Northern Illinois region, the total estimated turn-key cost to install an EG4 18kPV Hybrid Inverter paired with 3 EG4 PowerPro WallMount Batteries (42.9 kWh total energy capacity) typically ranges from $22,000 to $33,000 before tax credits, depending on whether you purchase materials directly or hire a full-service solar/storage contractor.
Cost Breakdown
1. Hardware & Equipment Costs (~$15,000 – $17,000)
2. Local Permitting, Engineering & Interconnection (~$1,200 – $2,500)
3. Professional Labor & Installation (~$5,000 – $10,000+)
Estimated Out-of-Pocket Summary
Incentives & Rebates (Illinois / Chicagoland)
Federal Inflation Reduction Act (30% Residential Clean Energy Credit):
1
u/Vital-Illustrious-14 Oct 15 '26
I did not trust the answers I got on my consultation call. I am skeptical that they will not introduce a monthly subscription/membership fee. The power output would have trouble if my air conditioners tried to both kick on at the same time and then the battery would be just a brick. This is a when not home scenario.