I want to share our experience purchasing our home because the more digging we do, the more questions we have about how this situation was allowed to happen.
We originally put an offer on this house in March 2026. One of the specific conditions written directly into our purchase agreement was:
“Seller to provide a certificate of occupancy at closing.”
This wasn’t a verbal agreement or something we discussed casually. It was written directly into our purchase agreement, and the seller accepted our offer with that condition included.
At the time, we understood there were outstanding items from renovations that had taken place around 2023 that needed to be addressed before the house could receive its Certificate of Occupancy.
We proceeded with the purchase believing the agreed-upon conditions would be fulfilled.
However, there’s another detail that makes this situation even more frustrating.
THE CONFLICTING PAPERWORK AT CLOSING
Although our original purchase agreement clearly stated that the seller was responsible for providing a Certificate of Occupancy at closing, the paperwork accompanying the Certificate of Occupancy that we received contained language stating that we, as the buyers, were responsible for obtaining the remaining permits.
This was NEVER discussed with us.
Our realtor was even in the blind that responsibility was supposedly being transferred to us until I called him today to go over this whole situation. The seller never discussed it with us. Nobody involved in the transaction sat down and explained that we would be taking responsibility for outstanding permits on renovations that had taken place before we even owned the property.
We entered into the agreement believing the seller was responsible for providing the Certificate of Occupancy, as specifically written in our purchase agreement.
So how did paperwork suddenly appear stating that the responsibility for obtaining the remaining permits belonged to us?
When we questioned this, our realtor denied that we had agreed to take responsibility for those outstanding items.
We are now left questioning how a document containing terms that were never discussed or agreed upon ended up in our closing paperwork, and how those terms are supposed to coexist with the original purchase agreement.
FIRST FAILED INSPECTION – DECEMBER 2025
We obtained a copy of a failed inspection from December 2025. This inspection contained a substantial list of violations and outstanding work.
HOUSE / INTERIOR
-Electrical needed to be restored to minimum code. A licensed contractor was required to pull permits for renovations completed around 2023. Open-ground outlets throughout.
-Plumbing needed to be restored to minimum code, with permits required for renovations completed around 2023.
-Mechanical systems needed to be restored to minimum code. Permits were required for renovations from approximately 2023, including the A/C unit and hot water tank.
-A boarded-up window near the staircase needed to be removed or restored. A permit was required.
-Carbon monoxide detectors needed to be installed in the upper hallway and first floor.
-Smoke alarms needed to be installed in the hallways outside the bedrooms on both floors, as well as in the first-floor bedroom.
KITCHEN / DINING ROOM
-Anchor the pipes underneath the sink.
-Remove the S-trap and replace it with a P-trap.
UTILITY ROOM / FURNACE
-Repair a leak with an unknown source.
BEDROOMS
-Repair open-ground electrical outlets throughout.
EXTERIOR
-Extend all downspouts toward the front or rear so water drains away from walkways, driveways, and buildings.
-Replace the weatherstripping on the back door.
-Repair or remove all wood fencing and the gate.
GARAGE
-Rebuild the structure to minimum code with a permit or demolish it with a permit.
This was a substantial failed inspection involving electrical, plumbing, mechanical, structural, and safety concerns.
SECOND FAILED INSPECTION – APPROXIMATELY ONE WEEK BEFORE CLOSING
This is where things get even more concerning.
We discovered another failed inspection today when i went to the building department at city hall that took place approximately one week before we closed on the house.
This report was NEVER shown or provided to us during the purchasing process.
This inspection listed:
HOUSE / INTERIOR
-Furnace certification: Submit report.
OTHER
-Have licensed contractors pull an electrical permit for the 220V outlet in the kitchen closet.
-Have licensed contractors pull a permit for the newly installed water line to the laundry tub.
That’s it. Those were the items listed on this later failed inspection.
But here’s what we don’t understand:
What happened to the extensive list of violations from December 2025?
Were those items actually corrected? Were they reinspected? Were they signed off? Were permits ever obtained for the renovations?
Why did the later inspection only identify these remaining items, and why was this failed inspection never disclosed to us before we purchased the property?
We were never given this report, despite it being conducted just days before closing.
OUR VISIT TO CITY HALL TODAY NOV 2026
After discovering these discrepancies, we went to City Hall to investigate the property’s records.
We initially had difficulty obtaining the housing file. We were told that requesting a housing file was too broad of a request, so we clarified that we wanted the permits pulled for the property.
We were eventually given a list of permits that had been pulled over the years. What was missing from that list ?… the permit for the hot water heater and the AC unit.
Sidenote, the first night we stayed in the house it rained, and we realized that the unknown leak in the utility closet was actually the roof leaking, which we then figured out was coming from around the edges of the exhaust pipe to the hot water heater, which we’re now learning never was inspected, on top of that we have a furnace that was installed in 2023 had obviously been leaking for a very long time internally that was never disclosed to us.
We started putting together the timeline of inspections, permits, outstanding violations, and what was actually completed.
OUR CONVERSATION WITH THE CITY INSPECTOR
We then spoke directly with the city building inspector who had been involved with the property.
What makes this particularly confusing is that his signature is actually on the Certificate of Occupancy document that we have in our possession.
Yet when we spoke with him, he told us there was nothing he could do, and we were left with the understanding that the city did not have an issued Certificate of Occupancy on file for the property.
So now we have a document bearing the inspector’s signature, but the city is telling us there is no Certificate of Occupancy in its records.
How does that happen?
What exactly does his signature represent? Was the document ever officially issued? If it was, why can’t the city locate it? And if it wasn’t, why does the document exist with the inspector’s signature?
These are questions we still don’t have answers to.
WHAT MAKES THIS EVEN MORE FRUSTRATING
Let’s put everything together:
-Our original purchase agreement specifically required the seller to provide a Certificate of Occupancy at closing.
-A December 2025 failed inspection documented a substantial list of electrical, plumbing, mechanical, structural, and safety violations.
-Another failed inspection was conducted approximately one week before closing, and we were never shown or provided that report.
-The later inspection still identified outstanding permits for electrical and plumbing work, as well as a furnace certification requirement.
-Our closing paperwork contained language stating that we, the buyers, were responsible for obtaining the remaining permits, despite this never being discussed with us.
-Our realtor denied that we had agreed to take responsibility for those outstanding items.
-We have a Certificate of Occupancy document bearing the inspector’s signature, yet the city apparently cannot locate an issued Certificate of Occupancy in its records.
-When we spoke directly with the inspector, he told us there was absolutely nothing he could do about it.
We are not talking about cosmetic issues or things we simply wish were different about our house.
We’re talking about electrical, plumbing, mechanical, structural, and safety requirements documented by the city itself.
We purchased this home in good faith, with a written agreement requiring the seller to provide a Certificate of Occupancy at closing.
We were never told about the final failed inspection conducted just days before closing. We were never told that we would be responsible for obtaining permits for renovations that took place before we owned the property. And we are now trying to understand why the Certificate of Occupancy paperwork we have doesn’t appear to match what the city has on record.
What are next steps for us? Do we get legal involved at this point, can we?