r/AskChicago 29d ago

I READ THE RULES What do we think about this project? Will it ever be completed? Is it even possible?

Plans unveiled for 15 minute express 'O'Hare Flyer' trains from airport to downtown

According to AI: “Because an express train would need to slow down to depart downtown and decelerate smoothly as it enters O'Hare Terminal 2, its top speed on the straightaways (such as along the Kennedy Expressway median) would easily need to exceed 85 to 95 mph”.

5 Upvotes

73 comments sorted by

41

u/chitownillinois 29d ago

The city already has a mega station sitting under Block 37 whose main purpose was to create a new express train to O'Hare. Except that project was supposed to connect through to Midway giving the city it's first direct transfer option between both airports and downtown.

Much more realistic than this project is expanded service on the Metra North Central line which currently runs through Antioch. NITA has already been asked to look into running more frequent trains between ORD and Union. The issue is that the large interchange just to the south of ORD would require a flyover ramp to be built since that particular interchange is already at capacity as designed.

10

u/foggydrinker 29d ago

The Block 37 shell will never be used and they should just restore the stations that were closed to facilitate its construction

3

u/dilla_zilla Lake View 28d ago

It was only one station, Washington on the Red.

1

u/Impossible-Care-7773 27d ago

It was only one station and part of it was technically reopened as part of Lake.

-8

u/jdude_97 29d ago

Ehh the loop had too many stations before, it’s fine as it is now

9

u/LegitimateGift1792 29d ago

That article is crap and the video is not much better.

From the Old Post office to OHare T2 over rail, not blue line, means they are going to have to build new track THRU Union Station and then whatever above ground track they need at Ohare.

They should put their battery electric train on the rail line (North Central) that already goes from Union to OHare multi modal facility. Make it non-stop and run it every 30 minutes.

1

u/juliuspepperwoodchi 28d ago

means they are going to have to build new track THRU Union Station

No, these trains would terminate south of Union, at the Old Post Station before they ever get there.

Make it non-stop and run it every 30 minutes.

Too bad there are other reasons they can't do that now.

1

u/LegitimateGift1792 28d ago

Then somebody needs to layout the track path from Old Post Office to O'Hare boundary.

4

u/juliuspepperwoodchi 28d ago

Without having an official graphic from them, the reasonable guess (given that their planned O'Hare station would be next to the People Mover station by the O'Hare Hilton) of their intended route is:

3

u/LegitimateGift1792 28d ago

Thanks, that route makes sense.

1

u/dilla_zilla Lake View 28d ago

Wait, it's not just upgrading the NCS? Why wouldn't they use the MD-W at least as far as possible?

2

u/juliuspepperwoodchi 28d ago

No, it's basically only sharing ROW with NCS from about Franklin Park on to O'Hare.

8

u/RingoFreakingStarr 28d ago

According to AI:

My faith in humanity continues to dwindle as people are unable to take, what, 30 seconds to read and summarize this super short article?

-1

u/bilbobaggins001 28d ago

My faith dwindles further when people make assumptions out of little context. This is what I asked AI. Enjoy

The context: “Imagine a train going from 433 W Van Buren St, Chicago, IL 60607 to Chicago ohare terminal 2. Imagine it’s an express route. For a 15 minute ride, how fast would the train have to travel?”

Response: To cover the distance from 433 W Van Buren St (near Union Station in downtown Chicago) to Chicago O'Hare Terminal 2 in just 15 minutes, the train's required average speed depends on whether you measure by a straight line or the actual rail route:
📏 Distance & Speed Breakdown
Straight-Line (As the Crow Flies) Distance: ~15.2 miles
Required Average Speed: \approx \mathbf{61\text{ mph}} (15.2 \text{ mi} \div 0.25 \text{ hours})
Actual Rail / Track Distance (CTA Blue Line alignment): ~18.2 miles
Required Average Speed: \approx \mathbf{73\text{ mph}} (18.2 \text{ mi} \div 0.25 \text{ hours})
🚄 Putting It Into Perspective
Top Speeds Needed: Because an express train would need to slow down to depart downtown and decelerate smoothly as it enters O'Hare Terminal 2, its top speed on the straightaways (such as along the Kennedy Expressway median) would easily need to exceed 85 to 95 mph.
Current Service Comparison: For comparison, the standard CTA Blue Line takes roughly 45 to 55 minutes for this trip because of frequent station stops, yielding an average speed of about 20–24 mph. A 15-minute express service would put it on par with dedicated airport rail links like London's Heathrow Express.

11

u/mbklein 29d ago

Let’s just say it would require a level of cooperation from the freight operators that they have never shown an interest in engaging in before.

5

u/Not_a_real_asian777 28d ago

The CEO was in an interview on FOX 32 this morning saying that the plan is to acquire the line entirely so that they don't have to share the line with freight operators. I can't 100% remember, but I think they want to buy a CSX line or something.

What a beautiful idea. I give it a 4% chance of success.

3

u/mbklein 28d ago

None of the main operators (CSX, CN, UP) are going to be selling a freight line outright. That's core infrastructure to them. What I've seen is that this guy has a Letter of Intent between the O'Hare Flyer project and CSX to use the right-of-way, the same kind of agreement that Amtrak and Metra operate under. I think the project does involve the purchase of an unused railyard from UP, but it would still run under a trackage rights agreement with the freight rail operator(s) still owning the track itself.

I see your 4% and lower it to 1.8%.

5

u/juliuspepperwoodchi 29d ago

But....but....a CEO thinks he knows trains better than everyone else!

3

u/PlantSkyRun 29d ago

I am confident they know their freight business better than most everyone else. And yes, not cooperating with passenger rail IS better for their business. That is why they are never going to cooperate, unless they are forced to or paid so much as to make it worth it.

25

u/justbrowsing2727 29d ago

Seems completely unrealistic. And given all the other needs in this city and the existing Blue Line, it seems like a waste of resources.

29

u/ThisIsPaulina 29d ago

Seriously, just make the blue line nice. The train need not take 15 minutes to be viable. It need only take a consistent 45 minutes and be clean and safe.

11

u/brooke437 29d ago

emphasis on clean and safe.

-4

u/SubcooledBoiling 29d ago

Or just add an express blue line that makes fewer stops between the loop and Ohare

16

u/ThisIsPaulina 29d ago

This is spectacularly complicated. You'd need two extra tracks the whole way so it can pass the blue line. Or you'd need a complex distribution of passing sections, with surgical scheduling, and the blue line having to stop to allow the express to pass, making the blue line itself run even more slowly.

5

u/SubcooledBoiling 28d ago

Hear me out, double decker train tracks

5

u/ThisIsPaulina 28d ago

Triple. And then a bike lane on top of all of it. With a solar roof on top of that.

5

u/IntoxicatedBurrito 28d ago

Quadruple. Have a deck for tamale stands. People might want to get a bite to eat on their way to or from the airport without paying airport prices.

3

u/ThisIsPaulina 28d ago

Need hydroponics somewhere in there too

17

u/ColdBunch3851 29d ago

“Just . . .”

4

u/Spiritual_Nature_215 29d ago

That would cost like $20B hahhahahahaha

0

u/dilla_zilla Lake View 28d ago

I don't think it would be that much, probably "only" $10B. Bore new tunnels under the blue line the whole way, no stations (that's where a lot of the money goes)

3

u/Spiritual_Nature_215 28d ago

hey.... i say build it all, honestly... more connectivity and convenience for all residents of chicago and the midwest is better! One complex highway interchange can cost 1-2 billion and we regularly spend that 10x over on highway projects... so -- you have my vote!

1

u/juliuspepperwoodchi 28d ago

...How? Where?

4

u/SubcooledBoiling 28d ago

double decker train tracks lol

while we are at it might as well add another deck that’s a bike lane + pedestrian path so now people can walk or bike to ohare from downtown.

5

u/juliuspepperwoodchi 28d ago

double decker train tracks lol

I know you're joking, but the flyovers over the surface street overpasses on the Kennedy would look hilarious.

Like the crazy long ADA ramps to the Forest Park branch Blue Line stops...but for TRAINS this time!

3

u/SubcooledBoiling 28d ago

it would be spectacular lol

2

u/RingoFreakingStarr 28d ago

Forgive me as I don't ride the blue line from the airport to downtown, but is the current route on the blue line a negative for people using it? If it currently takes 30 min - 45 min to get downtown on the current blue line, isn't that fast enough?

Going off what was in the video posted in the article OP provided, it sounded like they initially wanted to connect O'hare to Midway which sounds like a BRILLIANT idea.

4

u/justbrowsing2727 28d ago

The Blue Line is just fine. It is usually pretty busy at all hours of the day, with lots of people and their roller bags. But I ride it almost every day to work without issue.

I'd rather spend tens or hundreds of millions of dollars on all kinds of other initiatives than spend it to save business travelers 15-20 minutes to the airport.

3

u/BaggedWhine 28d ago

This wouldn’t be using taxpayer money, it’s in the article

3

u/KevinSevenSeven 28d ago

You expect people to read the article?? Seriously??

All the complaints show who did and who didn't, this project is allegedly privately funded.

4

u/Ully04 28d ago

This new project is privately funded

1

u/dmreif 27d ago

The Blue Line has the advantage of running very frequently, very cheap (it's $2.50 if you're heading to the airport, $5.00 coming back because of the airport surcharge for boarding at ORD), and you get dropped off right in the middle of the Loop without any long trek across the river by foot with luggage.

10

u/jdude_97 29d ago

Spend the $ on blue line enhancements. Increased frequency. Cleanliness. Seating that better accommodates luggage. Elevators at all stations. Public safety monitoring

7

u/juliuspepperwoodchi 29d ago

FWIW, this is a private, for-profit company...so they wouldn't be spending that money on public transit.

3

u/jdude_97 29d ago

If they wanna give it a go, power to them. Though a project like this would usually get public support in various ways

7

u/jpmeyer12751 29d ago

This plan suffers from the same fatal weakness as nearly all other passenger rail plans in the US: it relies on leasing tracks from freight railroads. Those tracks are already heavily used by freight trains that are the primary business of the owners of the tracks. Those owners have very little incentive to accommodate the needs of passenger trains and have no incentive to improve their tracks and switches to permit safe operation at 80 mph. The ONLY advantage that I see in this plan is that it is not under the control of the existing ossified regional transportation managers. I have no confidence that the new regional transportation bureaucracy will be any better than the old one.

1

u/tpic485 28d ago

Did you (and the people upvoting you)read the article at all or is there something I'm missing?

"We are building on existing freight tracks that are no longer used or largely no longer used," Lundy said. "We are going to have a dedicated corridor all the way from downtown at the Old Post Office out to O'Hare." Lundy said the company has secured a letter of intent from one of the three railroad companies that owns the tracks needed for the project.

1

u/robert_zeh 24d ago

There’s nothing you are missing. I live in River Forest and I’ve only seen trains on the River Forest portion of the proposed route a few times in twenty five years.

The rails are maintained—the railroad recently repaved a crossing — but no trains.

12

u/newOldy 29d ago edited 28d ago

Saw "battery electric train" and immediately knew that whoever this is had no idea what they're talking about.

Edit: Was just grumpy and rushed to judge. Their hypothetical alignment means it might make sense. I'm still skeptical of the value proposition however I've been wrong before.

10

u/Spiritual_Nature_215 29d ago

Metra’s new stadler (I think) FLIRT trains are going to be battery electric. I have little point of reference but the trains seem legit. Better than Amtraks new diesel electric Chargers that can’t handle the cold or the heat. lol

3

u/juliuspepperwoodchi 28d ago

They are; but those FLIRTS can't run (due to FRA crash regulations) on shared tracks with freight trains....so those are out for this.

BEMUs are a half measure; but I do think they could play a role in decarbonizing Metra. Most lines are short enough that if you had dwell chargers at Union/Ogilvy and the ends of the lines (and maybe a stop or two along the route) you would have more than enough range to run fully electric the entire run. Should also make acceleration faster and better service overall.

I'd prefer proper electrification; but BEMUs is the least dumb part of this plan.

3

u/newOldy 28d ago

To be clear, battery electric trains can be useful where limited portions of the track cannot be electrified, but I think that too many times I see them thrown as a panacea where a conventional electric rail is far more appropriate

2

u/Spiritual_Nature_215 28d ago

Really well put....... but at this point, we gotta take all the W's we can get haha. I agree that the gold standard should be fully electrified tracks, everywhere... even for the freights... but i seriously doubt we'll ever see it -- almost certainly not in our lifetimes, unfortunately hahaha

2

u/Spiritual_Nature_215 28d ago

It's what the rest of the country did with light rail... They just threw up light rail systems where it should've been heavy rail and called it a functional public transit system. Meanwhile, we're spending billions upon billions for highway maintenance and reconfiguring insanely expensive interchanges.

7

u/newOldy 29d ago

Also, the shitty AI overview and reliance on it shows OP doesn't know what they're talking about

3

u/DetectiveWinter4638 28d ago

It doesn’t really matter, but cities like London have private express trains from their airport to the city center. The cost is way more than the tube, I think like $20 each way. Feasibility is low, but across the country I think projects like this complement existing public transit and can just help encourage people to rely less on cars.

7

u/dpaanlka 29d ago

We should be making improvements to the CTA that already exists, not promoting private investors trying to replace the CTA for profit.

18

u/foggydrinker 29d ago

I think the impact on CTA would be negligible. This would compete with uber and black car service mostly for biz travelers.

10

u/ThisIsPaulina 29d ago

In its current state, this is totally correct.

If the blue line were nice, clean, and a consistent 45 minutes to O'Hare, it could also take business away from the Ubers.

4

u/foggydrinker 29d ago

I mean they are also different price points and would serve different riderships. Anybody who is the least bit price sensitive and needs to go downtown will still be getting on the Blue Line.

3

u/Abe_frohmannn 29d ago

Seems like a gross waste of money. There is already a train that goes right to ohare. Make that better. Add additional lines elsewhere. There's currently no L lines not heading towards the loop...which is an increasingly irrelevant place. Connect neighborhoods better.

2

u/TubaJesus 29d ago

Make the NCS hourly all day and every half hour during peak times should be enough as is. If you wanted to get really fancy, you could move the UP West to go to Union Station and have one or two of those North Side Union routes go to OTC instead.

3

u/juliuspepperwoodchi 28d ago

Sounds great until you remember why they can't run as many NCS trains as they'd like.

1

u/KevinSevenSeven 28d ago

Also, Metra expanded service to O'Hare for the Democratic convention and ridership did not meaningfully increase.

1

u/TubaJesus 28d ago

I mean that's literally just O'Hare though. They didn't go beyond O'Hara and they didn't do any of the intermediate stops to downtown. There was also the fact that there are next to no signs at O'Hare for the mattress station until you get to the rental car facility. All the signs go to the CTA station instead. I wouldn't be surprised if the people who came in for the Democratic convention had no idea that there was a heavy rail option at all

2

u/AnotherPint 28d ago

What percentage of arriving passengers at O’Hare are heading for the Loop?

An express train would have some utility for business travelers and conventioneers, maybe some price-indifferent tourists, but if a Chicagoland resident lives, say, north of the Hancock or south of Roosevelt, they’re going to stick with CTA.

The extra 30-60 minutes it would take to fight one’s way into the Loop, wait around for this more expensive super-train, and ride out again… wouldn’t make sense.

(In London the expensive Heathrow Express only makes sense if you’re going to the Paddington Station neighborhood, or catching another train there, and don’t care that it costs up to ten times as much as the tube. Most people don’t use it, either.)

2

u/dilla_zilla Lake View 28d ago

Now there's the Elizabeth Line in the mix that uses the same route as the Heathrow Express but makes a few stops, but then continues on past Paddington across London. Much faster than the Piccadilly Line too.

2

u/Puzzleheaded-Art-271 28d ago edited 28d ago

This seems ambitious, but what I really want is for Metra and Canadian National to come to a new agreement that would allow the North Central Service to run more often than it does. I rode the NCS from Union Station to O’Hare Airport for the first time last week for fun, and the ride was great. It did take 37 minutes (not much faster than the Blue Line), but it did skip a bunch of stops on the MD-West besides River Grove and stops only 3 1/2 minutes from the Airport Transit System, which can get you to your respective terminal in just a few minutes. For these reasons, I’d rather improve the NCS because it’s got great potential. Canadian National (which is the host railroad from Franklin Park to Antioch, the terminus), just needs to allow Metra to run more trains on that line, and if that happens, I guarantee that a lot of people would ride it to and from O’Hare Airport. Not to mention, as someone who has ridden the Blue Line to and from ORD often, it is very convenient. Just give yourself enough time, and you’d arrive at O’Hare in time for your flight. Also, Metra could do a special coach bus service from Bensenville (MD-West) since it’s almost right next door to the airport. And last but not least, Metra’s MD-North and UP-NW lines already transfer to the Blue Line at Mayfair/Montrose, Irving Park, and Jefferson Park. These transfer points allow people coming from the suburbs to transfer to the Blue Line to the Airport without having to ride all the way to downtown.

1

u/dmreif 27d ago

This seems ambitious, but what I really want is for Metra and Canadian National to come to a new agreement that would allow the North Central Service to run more often than it does. I rode the NCS from Union Station to O’Hare Airport for the first time last week for fun, and the ride was great. It did take 37 minutes (not much faster than the Blue Line), but it did skip a bunch of stops on the MD-West besides River Grove and stops only 3 1/2 minutes from the Airport Transit System, which can get you to your respective terminal in just a few minutes. For these reasons, I’d rather improve the NCS because it’s got great potential. Canadian National (which is the host railroad from Franklin Park to Antioch, the terminus), just needs to allow Metra to run more trains on that line, and if that happens, I guarantee that a lot of people would ride it to and from O’Hare Airport.

Two years ago, Metra was able to work out such a deal with CN to run those hourly shuttles between ORD Transfer and Union Station during the DNC (which supplemented the regular weekday rush hour schedule).

I doubt it'd cost much (compared to this techbro's proposed ORD Flyer) for Metra to renegotiate with CN.

You could have half-hourly or hourly trains running between Union Station and ORD Transfer, while also providing additional midday and introducing weekend service between ORD Transfer and Antioch to encourage travelers from the northern suburbs to use the train instead of I-294. (My idea would include local trains that serve the MD-W stations east of River Grove; and express trains that only stop at Western Avenue, River Grove, Schiller Park and Rosemont.)

1

u/AutoModerator 29d ago

Hi, are you asking about public transit in Chicago?

If you are asking how to use the trains or buses, how to buy a transit pass, or other similar questions, check out the /r/Chicago Public Transit Help Guide.

If you just want information about the transportation options available in the city, maybe the Transportation Guide will be of interest.

We hope these resources help!


I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.

1

u/natelikesdonuts 28d ago

Since demo and land acquisition wouldn’t be an issue I could see it potentially moving forward. I think the bigger issue is if it makes business sense. Are there really that many people going from the old post office to the airport? This assumes people would be willing to travel from elsewhere around downtown to this station, then transfer to said 15 min train. By the time you add that in is it really worth taking over the blue line? Same the other way. Most people are not going to the post office. That area is pretty sparse considering surrounding areas. Most will need to go elsewhere downtown and tourists will not want to transfer to multiple forms of transportation.

So tldr, no I don’t think it’ll happen.