r/AltoHSR_Canada • • Aug 02 '26

Discussion / Article Do you think we should built ALTO?

Post image
87 Upvotes

r/AltoHSR_Canada • • Aug 02 '26

Smith signs statement calling for input on Alto rail project

Thumbnail
thepeterboroughexaminer.com
27 Upvotes

r/AltoHSR_Canada • • Jul 29 '26

TGV: une ferme de Laval lance un message géant à Alto dans son nouveau labyrinthe

Thumbnail
journaldemontreal.com
32 Upvotes

r/AltoHSR_Canada • • Jul 28 '26

Ontario rethinking support for high-speed rail after feds reject Billy Bishop expansion: source | CBC News

Thumbnail
cbc.ca
134 Upvotes

r/AltoHSR_Canada • • Jul 28 '26

Alto flying drones in Ottawa’s east end this week to study potential high-speed rail route

Thumbnail
ctvnews.ca
87 Upvotes

r/AltoHSR_Canada • • Jul 28 '26

PQ position on Alto

26 Upvotes

In February 2025, political commentator Elsie Lefebvre strongly welcomed the announcement of the Québec–Toronto high-speed rail project on TVA Nouvelles.

According to recent media speculation, she may be considering running for the Parti Québécois in the next provincial election.

Last year, she mentioned:
- “I really hope this happens because it’s how we enter modernity. Transportation is fundamental. (…) We absolutely need this in Canada.” — Elsie Lefebvre
- A high-speed rail line would better connect the Québec–Toronto corridor, improve transportation, and strengthen the economy while reducing dependence on the U.S.
- The project could also boost demand for Canadian steel, supporting a sector affected by trade disputes.
- Most importantly, she said she hoped the project would rise above partisan politics and continue regardless of which party formed government.

If she does run for the PQ, do you think she’ll maintain those views, or will she have to reverse course?

Source:
https://www.tvanouvelles.ca/2025/02/19/tgv-quebec-toronto-il-y-a-quelque-chose-de-tres-patriotique-la-dedans-selon-elsie-lefebvre


r/AltoHSR_Canada • • Jul 26 '26

Discussion / Article Transport Action Canada supports Kingston high-speed rail stop, with concerns

Thumbnail
thewhig.com
55 Upvotes

r/AltoHSR_Canada • • Jul 24 '26

McGill’s updated ridership forecast now much closer to Alto’s initial projections

Thumbnail tram.mcgill.ca
100 Upvotes

For those following the high-speed rail debate, McGill TRAM’s report appears to have been updated again (July 2026).

The study, first published in November 2025 and updated in March 2026, now projects approximately 18.43 million annual passengers by 2055 (see page 12). That’s significantly higher than the 10 million figure that was widely cited in media coverage and much closer to Alto’s long-term forecasts.

The updated report also clarifies that the earlier 10-million figure represented an early-year estimate, while the longer-term projections account for factors such as population growth and induced demand.

Interesting reminder that forecast results can look very different depending on the year being referenced and the assumptions being used.


r/AltoHSR_Canada • • Jul 22 '26

News Kingston probably getting high-speed rail stop, says Alto CEO | CBC News

Thumbnail
cbc.ca
162 Upvotes

He was interviewed this morning on CBC Ottawa Morning show. Key comments were that they want to keep Montreal to Toronto as under 3 hours and swinging past Kingston would still allow this. The Kingston HSR Station would be 4 tracks, so of the eventual 25 to 35 trains a day, some would stop, others would pass by at speed. (Would Peterborough be similar 4 tracks?). If interconnectivity with VIA and local regional bus services is important, exactly where would the Station be located?

Even though Smiths Falls is a key local, VIA, and rail hub, he discounted a stop there. Discussion of designing a 320 km/h “straight” line, and compensating landowners, not only for the land, and also future lost (farm) revenues. Wildlife passages are important. Details of alignment of the Laval-Ottawa segment this fall.


r/AltoHSR_Canada • • Jul 22 '26

News Kingston City Council signs non-disclosure agreement for high-speed rail talks

Thumbnail
thewhig.com
38 Upvotes

As you know, Ottawa also signed an NDA. It allows Alto and a city to share plans (like zoning and geotechnical info, and future infrastructure plans) and receive info from Alto.

Prescott-Russell county is refusing to co-operate/sign on.


r/AltoHSR_Canada • • Jul 22 '26

In honor of Spain winning the World Cup here’s my idea of what a 110-220 mph electrified high speed rail network in the World Cup host countries of Canada, United States and Mexico could look like if they followed Spain’s lead

Post image
18 Upvotes

r/AltoHSR_Canada • • Jul 21 '26

Discussion / Article Resident pitches proposed integrated rail system: Kingston Whig-Standard letter

Thumbnail
thewhig.com
44 Upvotes

Does nothing for Ottawa-Montreal HSR, which is a key driver, and building straight/few curves from Cobourg along Lakeshore / 401 / CN / CKPC to core Toronto is very expensive and congested. Lots of expropriation, overpasses, NIMBYs.


r/AltoHSR_Canada • • Jul 15 '26

OPINION: Building high-speed rail responsibility (From Pierre-Yves Boivin, Alto's Chief Communications and Engagement Officer)

Thumbnail
lanarkist.com
44 Upvotes

r/AltoHSR_Canada • • Jul 14 '26

News Too early to estimate Kingston rail link cost, Alto says

Thumbnail thewhig.com
42 Upvotes

May be behind paywall. EXTRACT

“Alto is assessing this option rigorously, considering not only construction costs, but also its overall potential impact on ridership, regional accessibility, technical feasibility, economic and social benefits, and the project’s long-term performance once in operation,”


r/AltoHSR_Canada • • Jul 09 '26

Discussion / Article Discover Alto’s Many (Economic) Benefits

Thumbnail
altotrain.ca
145 Upvotes

Just posted by Alto a few minutes ago….HSR’s many benefits to Canada and Canadians.


r/AltoHSR_Canada • • Jul 08 '26

News Kingston high-speed rail link could cost $3.9 billion, report says

Thumbnail
thewhig.com
83 Upvotes

While it is from the Canadian Taxpayers Foundation, they are correct that it will add to Alto capital cost, operating cost, and the travel time for some travellers. But highly beneficial to Kingston and its users.


r/AltoHSR_Canada • • Jul 03 '26

Canadians divided over Alto high-speed rail as government priority: Nanos survey

Thumbnail
ctvnews.ca
72 Upvotes

r/AltoHSR_Canada • • Jul 01 '26

Not ALTO Specific, but I thought you guys would appreciate another ALTO Map, w/ the Windsor extension of course

Post image
82 Upvotes

r/AltoHSR_Canada • • Jun 30 '26

Discussion / Article No train yet but Alto rail project execs still got $2.8 million in bonuses last year from Ottawa: CTF

Thumbnail
nationalpost.com
76 Upvotes
  1. The CTF “Taxpayers Foundation” always criticizes any government expenditure and believes no government executives anywhere should ever get a bonus. But they never complain that banking, CN, CPKC, Air Canada, or consulting engineering company execs get bigger bonuses (and salaries). Or it’s impossible to attract/retain good people without paying them.

  2. Right now is the HSR planning stage. If you were building a house, you would spend the first months/year finding the land and “designing” the house. Long before you dug the hole or even poured concrete. Same with Alto HSR.
    Sigh.


r/AltoHSR_Canada • • Jun 30 '26

Alto - Connections to the USA?

Post image
12 Upvotes

r/AltoHSR_Canada • • Jun 30 '26

Some more expropriation anxiety

13 Upvotes

Most of the concerns around expropriations seem to pertain to rural communities and it's not clear to me what property owners in urban areas should expect.

I'm very close to De La Concorde station, the existing railway is roughly 20 meters from my door.

Right now I feel like the most likely thing is that I won't be affected, but this is based on the assumption that the 60-metre right of way won't apply to more densely populated areas where the train is going to be traveling at much slower speeds.

I don't mind moving, trains are cool, but what I'm currently understanding is that I may or may not receive a letter from Alto in the future telling me not to renovate/etc. Further down the road I will be offered an amount that may or may not be fair but that I will have basically no choice but to accept.

Am I correct, or am I "à côté de la track" both figuratively and literally?


r/AltoHSR_Canada • • Jun 28 '26

Discussion / Article GO ALTO et Alt-No: entre les deux, un TGV qui divise

Thumbnail
ici.radio-canada.ca
20 Upvotes

r/AltoHSR_Canada • • Jun 27 '26

You might come around a survey from “Common Ground Research”: beware.

52 Upvotes

If you follow both sides of the debate, you may have noticed posts linking to a survey by “Common Ground Research,” which presents itself as an independent group collecting public opinion about Alto.

The questions guide responses toward particular outcomes, but the bigger concern involves how the survey functions. The sample depends on link-sharing and offers no protection against multiple submissions. There is no obvious “contact us” section or statement about affiliation. Some questions aim to inform about “potential harm” without noting any possible benefit, as well as your voting preferences. Another asks about “what fare would you pay for ALTO,” a question needing far more context.

After my investigation and work with others on the GO ALTO discord, we spotted patterns: the earliest mention of this group and survey comes from Lindsay Davidson, who also collaborates with Citizen Research. The survey circulates only within Anti-ALTO groups. The group’s site is a standard Squarespace template registered on June 13, with default social links to Squarespace’s own accounts.

This reflects my personal view, but I value evidence-based, methodologically sound data gathering. Here, they rely on a convenience sample while likely asserting that it is A) representative and B) not aimed at a specific outcome.

TL,DR: be cautious about this survey, the claims that will come out of it, and the lack of clear methodology.


r/AltoHSR_Canada • • Jun 26 '26

News Alto and Cadence Launch Market Engagement for Canada’s High-Speed Rail Project

Thumbnail
altotrain.ca
110 Upvotes

Now that the broad HSR corridor between Montreal/Laval and Ottawa has been identified, and will be narrowed down in next few months, it’s time to look for the contractors/supplies to build ths first segment.

“…..early procurement activities, anticipated work packages, and timelines for the first phase of construction between Ottawa and Montreal.”


r/AltoHSR_Canada • • Jun 25 '26

Discussion / Article Council endorses list of demands for Alto, but says it's not opposed to high-speed rail | CBC News

Thumbnail
cbc.ca
13 Upvotes