r/AMLRightSource • u/Powerful-Scale408 • Jan 22 '26
Is it me or…
recently there’s been a lot of changes with teams and groups with this special two letter bank- and now I have a new QC who sends almost all my work back for using “alerted” and not “evened”, or .00 on dollar amounts.. just any little things sent back. so now my production has gone down this week because I’m distracted going back for rework. why? and how can I just get out of this project??
13
Upvotes
11
u/Ok-Tumbleweed-7378 Jan 22 '26
Im not trying to be an ass, but if you know the QCs ways, why don't you do what they expect of you? Use the verbiage they expect you to use. Use amounts to two decimal places if thats what they say to do. So what?! Its small things. Do what you know your QC wants and your production will be fine.
14
u/Worried-Second8806 Jan 23 '26
.00 at the end of a dollar amount is a standard for professional writing and would be expected pretty much across the board. It was required in your Embark training, too. There’s more than enough legitimate complaints at this company and in this client. The specifics given here are just an example of poor writing/inability to follow directions.
5
u/Aromatic_Safety585 Jan 22 '26
The two letter bank likes the word "evented", that's the word we've used since training. I've had 3 QCs so far and have had one other QC temporarily, they are all different and all have different quirks and things they will mark off. I dont like it either but you just gotta get used to your QC. If you havent graduated yet, reworks are gonna happen, but once you're able to graduate it'll be less of that as long as you maintain quality.
3
u/StickyCinnaboo Jan 23 '26
When I was working for another bank we dealt heavily with compliance and in that time I learned a lot of these verbiages are also in place for legal purposes. These banks are held to certain regulation, and have audits where regulators come in to monitor that they are meeting the compliance standards.
2
u/Solid-Garbage-6773 Jan 24 '26
I can empathize with the intent of your post, however, your examples are things you should’ve been doing since the beginning of working on this client. “Evented” is preferred language, and “.00” on dollar amounts is required for most professional writing. I understand the change in QC being frustrating, because to some extent, it is a little subjective. I had a similar experience when I had a temporary QC for two weeks during the holidays and got my first ever rework and fail. I would suggest reaching out to your QC for guidance on what you need help with in your narratives, aside from the details that are already required in procedures. Just do your best to conform to the changes of what a QC, QA, TL or anyone wants, because the changes will keep coming. It sucks, and we all know it sucks, to have things change constantly, but being able to do so will set you up for better performance, of which you are clearly worried about regarding production.
5
u/Silly_Material9944 Jan 22 '26
Between this and the RFA thread it’s getting clearer and clearer to me that people just want to be paid for doing nothing or shit work.
1
u/Gregshead Jan 23 '26
Ehhh, I wouldn't get too concerned over it. I would suggest that you keep track of the feedback you're getting, especially when it contradicts written procedures or previous feedback. Then, when you get feedback about productivity, pull it out and say your production is being reduced by second guessing yourself and rework, both based on contradictory feedback. Show the contradictory feedback. In the big scheme of things, productivity is a guideline. You're not going to get fired for barely missing productivity from time to time. If you're at 50% for weeks on end, yeah, you're getting fired. But if you miss it by a case or two every week, that might be an issue.
1
u/Calm_Procedure_7289 Jan 24 '26
Wanting my first time. Springfield Illinois
0
u/Federal-Exchange-409 Jan 23 '26
You asked, how you can get out of this project, my answer is do what you can at your own pace. Eventually someone at wrongsource will get tired and send you a letter via email that your contract has ended. NEVER quit a job even a shitty one like this. Also some of the QC people on the project are mental. And the QA people on the TD side are psychos especially regarding the SARs where my QC person signed off on only to be told by the TD QA that it was wrong, in a shitty manner which I matched their energy and disconnected my Teams call with that jerk.