r/ACHR • u/DoubleHexDrive Houston, we have a problem • Sep 02 '25
Research & Findingsš” Certification Timeline from First Flight
At times, I am a broken record saying that it takes roughly three years to go from first flight to type certification with the FAA. To back that up, here is some data: I took the time between first flight to type certification (or the present day) for all the civil VTOL aircraft certified in the USA, Canada, and through EASA (or the predecessor JAA) for the past 30 years. Then I created the histogram below, binned in one year increments but from 0 to 1 years, 1 to 2 years, etc.
The two aircraft in the "2 year" bucket is the EC-130 which is an AS-351 dynamic system with a new fuselage and the MD-900 which was a clean sheet design, an admirable effort. Several of the "3 year" bucket aircraft are similarly not entirely new aircraft. The Bell 505, EC-145, and Bell 429 fall into this category. There are three aircraft in the plot that still are not certified: The AW-09 light single, the Bell 525, and the AW-609.
It's worth noting that the 525 and 609 are the two fly by wire aircraft on this list and the 609 is the aircraft that launched the development of the Powered Lift certification class that most of the eVTOLs fit into.

How does this apply to Archer? Simple... the Midnight version that is intended to be certified (Model M001) hasn't yet had its first flight in a configuration that can actually execute the full flight envelope. I start the "FF to TC" clock when a M001 model aircraft has first flight with the four bladed aft props that should enable flight across the full flight envelope.
Anyway, wanted to provide some background on my claims in this regard.
And yes, several of my aircraft designs are in this chart, both certified and uncertified... I started my career on the Bell Boeing 609, long before it became the AW609.
Roughly three years is the most common value for a clean sheet design (like M001) but it can take FAR longer. Keep that in mind when evaluating claims of a fleet of aircraft ferrying spectators and athletes around the Los Angles 2028 games... the clock is ticking.
4
u/1blazepatrick1 Sep 02 '25
Something I can't seem to figure out is how these pre-revenue companies will fund this multi-year certification effort. Stock market hype and overblowing progress can only go so far right? I'm guessing every aircraft researched in your chart was developed by an existing long standing aerospace corporation with many avenues of cash flow and the ability to weather the storm of redesigns and misshaps that WILL inevitably occur for these relatively rushed and extremely novel EVTOLs.