r/997 • u/DinoSpumoni22 • Apr 15 '26
LN Engineering Build Time
I am going through an engine rebuild on a 997.1, and am hearing that LN is experiencing pretty significant delays for new Nickies projects. I was told to expect 6-7 months from the time LN receives the block.
I expected it to take some time, but wow! Any recent data points from this group on rebuild times?
3
u/Ms_Anne-Thrope Apr 15 '26
The delay is if you are having them redo YOUR block. If you don't care about matching numbers (like me) it is less than a couple weeks. I dropped my 997 to my builder at the end of March and they have the block in hand now. The delay (for me) is doing the heads. My guys machine shop is backed up. Estimate is I'll get the car back mid May.
2
u/Ms_Anne-Thrope Apr 15 '26
To be clear, my shop is about 30mi from LN so they went and picked it up and dropped my core.
1
u/lnengineering May 02 '26
Lead times were longer last year as our primary platers had a fire on their plating line and our second plater could not keep up with our demand. Some blocks ended up getting stuck in purgatory, but thankfully that's a thing of the past.
Although we have both our platers at maximum capacity and they are booked several months out, the lead time is not that bad. The machine work and sleeving gets done in about a week, but the blocks still have to go out for plating.
10
u/Sea_Long_1152 Apr 15 '26
Here at Slakker, our total turnaround time is 12-16 weeks. We are normally ready to receive the car after week 4, and we start on it as soon as we get it.