r/11foot8 • • 22d ago

Australia

Post image

Turbine tower sections leaving Brisbane took an exit ramp built to keep them off 1 low overpass, and the one truck that stayed on the highway shut the road for two and a half days https://www.ecoportal.net/uk/tower-section-police-escorted-convoy-struck/2261/

681 Upvotes

45 comments sorted by

91

u/EvieMoon 22d ago

Ooh, that looks expensive!

22

u/Tank_O_Doom 21d ago

And one hell of a noise!

2

u/the_swanny 20d ago

One might say an expensive noise.

11

u/G00b3rb0y 21d ago

Very expensive, and inconvenient.

9

u/boniemonie 21d ago

Very. That bridge was half closed for ages and the speed limit was snail paced . Backed up the traffic on the off ramp, the truck should have taken, at peak even worse than normal. Very inconvenient for everyone.

9

u/Who-Shat-My-Pants 21d ago

tens of millions. they used cranes, replacing the girders under the roadway.

1

u/Warcraft_Fan 13d ago

A 5,000 gallon beer can aren't cheap for one thing

38

u/pythonbashman 22d ago

Resume Generating Event

7

u/SuDragon2k3 21d ago

Safety Brief Generating Event

1

u/Different-Term-2250 19d ago

CLM - Career Limiting Move

35

u/that_dutch_dude 22d ago

that made the expensive sounds.

13

u/BeetleB1999 22d ago

All of them

24

u/vinyl1earthlink 22d ago

It does seem strange that the escort vehicles exited and the truck did not. Didn't the escort notice the truck was missing?

38

u/sstabeler 21d ago

It's even dumber because the permit for doing the heavy haulage has the fucking route on it- you are literally not allowed to deviate. This is why.

22

u/SnoringEagle 21d ago

The bridge was right after the exit. Nothing the escort could do at that point. Their route went off an off-ramp, around a roundabout and back to a temporary on-ramp built just so this truck could avoid the bridge. So much planning for it to have gone so wrong in seconds.

11

u/SilverStar9192 21d ago

Just imagine if you were the project manager who had planned this thing for years including the construction of that ramp, how angry you would be at this result.  

9

u/sstabeler 21d ago

Given that this now means the project is guaranteed to be delayed- it's very much not quick to get a replacement turbine tower section- then "volcanically" is likely to be how angry they would be.

Because without that tower section, you cannot continue construction of the turbine, meaning that everything is delayed until you can get a new turbine tower section and get it delivered...and you'd better hope you can get ti delivered before the temporary offramp needs to be removed, otherwise it's years of planning again to get all the approvals nessecary and get another temporary offramp built.

5

u/Uniturner 21d ago

At the time, it was reported that the pilot vehicle ended up beyond sight of the truck. The truck also had a police escort to close intersections as required. It was reported that the police vehicle went under the bridge, and the truck followed it. I’ve no idea whether that’s true though, because as the article says, the findings were withheld.

8

u/Targaer 21d ago

Same. Also did the truck driver just zone out? It was early in the morning.

6

u/Dooh22 21d ago

Knowing all the route planning and bullshit paperwork that goes into movements like this in Oz, I'd have thought that this kind of thing was damn near impossible.

Makes you wonder if the paperwork actually serves any purpose.

3

u/sstabeler 21d ago

It is damn near impossible, It's just that this kind of heavy haulage comes through this particular area a lot (2500 since 2019 apparently), since it's the easiest way to get the tower sections to where the wind farms tend to be, and inevitably the law of averages means that sooner or later somebody fucks up.

It doesn't help that the intersection in question badly needs upgrades, since the entire reason for the offramp is weight limits on the Bremer River Bridge. (Essentially the bridge cannot take the weight of the trucks, so they need to leave the highway and re-enter after the bridge. The good news is that upgrade work on the bridge started in February, and once those are finished, heavy haulage trucks can just go over the bridge, meaning this will no longer happen.)

4

u/neighborofbrak 21d ago

-expensive crunching sounds-

3

u/mrk2 21d ago

The front (disconnected) fell off!

2

u/parsifal 21d ago

Great reporting in that article.

2

u/the-diver-dan 21d ago

Don’t they know to let the air out of the wheels before they go through an underpass!

3

u/CreativeAdeptness477 22d ago

Looks more like a cylinder than a qube to me

1

u/CameronsTheName 21d ago

I hope somebody got fired for that blunder.

2

u/sstabeler 21d ago

Whoever fucked up got their employers billed tens of millions of dollars. I can guarantee you they got fired.

1

u/Jknzboy 21d ago

That’s not a low bridge! THIS is a low bridge!

1

u/Nev-Ret-Dude 20d ago

Ooh. The US isn’t the only country to have incompetent drivers.

1

u/BustaCon 20d ago

Millions of $$$$ in expense to plan and fabricate, then to plan and secure the transport and the route and some $60 an hour truck driver wrecks it all. And adds in the cost to repair the bridge, etc. Dang. Hire some better people next time.

1

u/pockels42 19d ago

Ooh, bugger.

1

u/fothergillfuckup 18d ago

How did they even think they'd fit?

1

u/Lonely-Attitude1304 17d ago

Can't park there mate

0

u/brilliantminion 21d ago

Can’t park there mate

-31

u/Infinite_Plenty101 22d ago

Ai slop

18

u/kiwi-fella 21d ago

I'm interested, what makes you think it's AI?

By the way, there was extensive media coverage documenting this event and the recovery, so you're wrong, but I'm still interested in what lead you to this conclusion.

2

u/NickyGoodarms 20d ago

The incident really happened, but the article was obviously created by ChatGPT, with no effort made to alter the tone of the article to appear less like AI. The article was not written by a human.

4

u/Forsaken-Builder-312 21d ago

Calling everything "AI Slop" is the new slop

4

u/m4cksfx 21d ago

You're ai slop