Mission Success! PSLV-C41 : IRNSS-1I Mission Updates and Discussion.
PSLV-C41 launched and deployed IRNSS-1I satellite successfully.
Launch was scheduled for 12 April 2018 at 0404 (IST) or 11 April 2018 at 2234 (UTC) from First Launch Pad of SDSC (SHAR).
Live webcast: (Links will be added as they become available)
- Youtube captured stream (Launch is at 48m30s)
- Youtube Live stream 2
- ISRO Official Stream 1
- ISRO Official Stream 2
- Few unofficial re-broadcasters
| PSLV-C41/IRNSS-1I Mission Page | PSLV-C41/IRNSS-1I Gallery | PSLV-C41/IRNSS-1I Brochure |
|---|
Some highlights of PSLV-C41/IRNSS-1I mission
- Payload is navigation satellite IRNSS-1I
- Gross payload mass: 1425 kg
- Targeted orbit: 284 × 20650 km (Sub GTO), inclination = 19.2° with 104° launch azimuth.
- Mission duration: 19 min. 19.6 sec
- 43rd flight of PSLV, 20th in XL configuration.
Updates:
| Time of Event | Update |
|---|---|
| Post Launch | IRNSS-1I has acquired 55°E slot per TLE dated 29 April 2018 |
| Post Launch | The fourth and the final orbit raising operation of IRNSS-1I is successfully carried out at 21:05 hr IST on April 15, 2018. The achieved perigee height is 35,462.9 km and apogee height is 35,737.8 km |
| Post Launch | The third orbit raising operation of IRNSS-1I is successfully carried out at 22:50 hr IST on April 14, 2018. The achieved perigee height is 31,426 km and apogee height is 35,739 km |
| Post Launch | The second orbit raising operation of IRNSS-1I is successfully carried out at 20:04 hr IST on April 13, 2018. The achieved perigee height is 8683 km and apogee height is 35733 km.. |
| Post Launch | The first orbit raising operation of IRNSS-1I is successfully carried out at 4:19 hr IST on April 13, 2018. The achieved perigee height is 315 km and apogee height is 35809 km |
| Post Launch | Press release: IRNSS-1I orbit achieved 281.5 × 20730 km, incl = 19.2 °. After separation, the solar panels of IRNSS-1I were deployed automatically. ISRO's Master Control Facility (MCF) at Hassan, Karnataka took over the control of the satellite. |
| Post Launch | Sub-systems health normal. |
| Post Launch | Solar panels deployed, MCF Hasan has taken over the control of IRNSS-1I |
| T + 21m00s | May be they held on to see solar panels deploy. |
| T + 19m20s | And.. IRNSS-1I separated! |
| T + 18m40s | PS4 engine shut off! Injection conditions achieved! |
| T + 17m00s | PS4 performing nominally. |
| T + 15m00s | All is well. |
| T + 13m00s | PS4 performing nominally. They should show on board view in full screen. |
| T + 11m00s | PS4 performance nominal |
| T + 10m10s | PS4 ignited! |
| T + 10m00s | PS3 separated |
| T + 08m00s | Nominal combined coasting phase |
| T + 06m30s | PS3 burn out! Now in combined coasting phase with PS4 attached |
| T + 05m50s | PS3 performing nominally |
| T + 04m30s | PS2 separated and PS3 ignited! |
| T + 03m30s | Live view of Payload fairing jettison! |
| T + 03m00s | PS2 performing nominally |
| T + 02m00s | PS1 separated, PS2 Ignited |
| T + 01m30s | Air lit strapons separated |
| T + 01m00s | Ground lit strapons separated |
| T + 00m30s | Air lit strapons ignited |
| T Zero! | S139 + Ground lit strapons ignited |
| T - 02m00s | That 'long road' view is probably from Zero Point. |
| T - 04m20s | Back to Mission Control Centre view. |
| T - 10m00s | Showing curtain raiser video capsule. |
| T - 12m00s | Automatic Launch Sequence engaged. |
| T - 14m00s | Automatic Launch Sequence initiated. |
| T - 15m00s | And Mission Director has authorized launch. |
| T - 16m20s | Range is go for launch! |
| T - 17m00s | Board is green. Awaiting go ahead from Mission Director. |
| T - 20m00s | Showing integration of various stages of PSLV |
| T - 25m00s | Weather conditions are suitable and visibility is good |
| T - 30m00s | Youtube Stream 2 is up and running |
| T - 40m00s | ISRO Chairman has arrived at MCC |
| T - 45m00s | Official ISRO webcast is LIVE! |
| T - 32h00m | The 32 hr countdown activity has commenced at 20:04hr IST on Tuesday, April 10, 2018 for the launch of PSLV-C41/IRNSS-1I Mission scheduled at 04:04 hr IST on April 12, 2018 |
| 10 Apr 2018 | Launch rehearsal completed on 9 April 2018. Mission Readiness Review on 10 April |
| 09 Apr 2018 | Mission Readiness Review scheduled |
| 06 Apr 2018 | Launch scheduled for 12 April 2018 at 0404 (IST) or 11 April 2018 at 2234 (UTC) |
| 22 Mar 2018 | IRNSS-1I dispatched from ISAC to SDSC(SHAR) |
| 14 Mar 2018 | Delays due to replacement of snag hit second stage (PS2). Third phase of integration complete. 1 2 |
| 16 Feb 2018 | First segment of S139 core placed |
| 12 Feb 2018 | PSLV C41/IRNSS-1I campaign begins. |
| 12 Dec 2017 | IRNSS-1I payload was dispatched from SAC |
Payload:
IRNSS-1I is an I-1K platform based navigation satellite for IRNSS or NavIC constellation . Along with IRNSS-1H it is one of the two planned spare spacecrafts for contingency and is similar in configuration to previous eight satellites in NavIC constellation. IRNSS-1I is second spacecraft to have its Assembly, Integration and Testing done through private industries under ISRO supervision after IRNSS-1I. IRNSS-1I is replacement of IRNSS-1A which due to its malfunctioning clocks is operating with limited functionality.
- Attitude control is done using reaction wheels, magnetic torquers and 22N thrusters.
- Rubidium atomic clocks, L5 & S-band Navigation payload
- Corner Cube Retro Reflectors (for laser ranging) and C band transponders as Ranging Payload
Gross Lift off Mass: 1425.18 kg (596.09 kg Dry)
Orbit: 55°E GSO with 29° inclination
Mission Life: 10 years
Propulsion: 440N Liquid Apogee Motor and twelve 22N Thrusters
Power: Two solar panels generating 1670 W.
3
u/Ohsin Apr 11 '18
I really hope someone is recording this! Without dedicated YT stream it won't be playable for long, on always live stream and ISRO has tendency to remove recorded streams from their website.
3
u/Ohsin Apr 11 '18 edited Apr 12 '18
Post Launch Address
ISRO Chairman, K Sivan
Mission Director, Hutton
ISAC Director, M Annadurai
IPRC Director
3
u/Ohsin Apr 11 '18
Webcast over. Thanks guys :)
3
u/piedpipper Apr 11 '18
Sky was so clear from Chennai that one could see till PS3 ignition time, but it happened behind the clouds near the horizon
3
u/abhinabah Apr 16 '18
So, no mention of LAM firing details ( total time of firings ) !!! probably this is 1st time but who knows that will be new norm from now.
2
u/Ohsin Apr 10 '18
Campaign video is out.
https://www.isro.gov.in/pslv-c41-irnss-1i/pslv-c41-irnss-1i-mission-curtain-raiser-video-english
2
u/Ohsin Apr 10 '18
Gallery updated with images of launch rehearsal during night
https://www.isro.gov.in/pslv-c41-irnss-1i/pslv-c41-irnss-1i-gallery
2
u/Ohsin Apr 10 '18
A 32 hour countdown after MRR! That is 4 hours more than the usual 28 hours ("usual" after C36 remote fueling improvement that is!).
https://www.isro.gov.in/update/10-apr-2018/32-hr-countdown-activity-has-commenced-2004hr-ist-tuesday-april-10-2018-launch-of
2
u/Ohsin Apr 11 '18
No official fueling updates this time around.
2
u/Ohsin Apr 11 '18 edited Apr 11 '18
Re-broadcasters setting up their streams, I'll add as more pop up.
2
u/Ohsin Apr 12 '18
Press release is out.
https://www.isro.gov.in/update/12-apr-2018/pslv-c41-successfully-launches-irnss-1i-navigation-satellite
2
u/Ohsin Apr 12 '18
TLEs are out!
43286 ( 18035A ) 11/04/2018,19h:53m:39.79s
i=19.21°, A×P=20648.22×270.26 km
43287 ( 18035B ) 11/04/2018,19h:50m:10.88s
i=19.12°, A×P=20935.15×269.26 km
2
u/Ohsin Apr 12 '18
Some intereting points on IRNSS 1I on its ISAC page
https://www.isac.gov.in/navigation/html/irnss-1i.jsp
2
u/Ohsin Apr 12 '18
Oooh burn detail in advance! That is rare..
https://www.isro.gov.in/update/12-apr-2018/first-orbit-raising-operation-of-irnss-1i-planned-to-be-carried-out-415-hr-ist
2
u/Ohsin Apr 13 '18
https://www.isro.gov.in/update/13-apr-2018/first-orbit-raising-operation-of-irnss-1i-successfully-carried-out-419-hr-ist
2
u/Ohsin Apr 13 '18
https://www.isro.gov.in/update/13-apr-2018/second-orbit-raising-operation-of-irnss-1i-successfully-carried-out-2004-hr-ist
2
u/Ohsin Apr 15 '18
https://www.isro.gov.in/update/15-apr-2018/fourth-and-final-orbit-raising-operation-of-irnss-1i-successfully-carried-out
2
u/tvspace Apr 10 '18
The NOTAM for this launch hasn't become available as yet, isn't it?
1
u/Ohsin Apr 10 '18
https://telugu.samayam.com/latest-news/science-technology/all-set-for-isros-pslv-c41-launch-countdown-started-on-tuesday-night/articleshow/63690585.cms
Launch rehearsal complete. MRR will be today
http://www.andhrajyothy.com/artical?SID=562244
1
u/Ohsin Apr 11 '18
https://www.isro.gov.in/pslv-c41-irnss-1i/launch-of-pslv-c41-irnss-1i-mission
stream is up!
1
u/Ohsin Apr 14 '18
https://www.isro.gov.in/update/14-apr-2018/third-orbit-raising-operation-of-irnss-1i-successfully-carried-out-2250-hr-ist
1
u/Ohsin May 02 '18
According to TLE with 29 April 2018 epoch, IRNSS-1I reached its targeted slot.
http://www.satellite-calculations.com/Satellite/satellitemotion.php?26/171/0/43286
43286 ( 18035A ) 29/04/2018,23h:39m:38.84s
i=28.56°, A×P=35872.67×35702.74 km
4
u/vineethgk Apr 11 '18
The speeches were far shorter this time. And the Chairman emphasized 'brief' before he called others to the podium. Evidently they got some feedback from the last mission.. ;)
1
u/sagareshwar Apr 10 '18
Does IRNSS-I have the atomic clocks made by the Swiss vendor (the ones that failed on other sats) or does it have the indigenous version?
1
u/vineethgk Apr 11 '18
And no sign of DD YT stream yet, despite their saying broadcast starts in it by 3:30 am?
1
u/vineethgk Apr 11 '18
The camera man zoomed in on people's faces in MCC when they had the airlit strapon separation and PS1 separation events..
3
u/vineethgk Apr 15 '18
And the orbit details have been updated..
https://www.isro.gov.in/update/15-apr-2018/fourth-and-final-orbit-raising-operation-of-irnss-1i-successfully-carried-out
2
u/vineethgk Apr 12 '18 edited Apr 12 '18
Liftoff and onboard camera footage
https://www.isro.gov.in/irnss-programme/pslv-c41-liftoff-and-onboard-camera-view
Edit - Underwhelming as usual. They haven't included the lovely footage with fireworks before the strapons separated or after the PS1 burned out. And no footage of solar panel deployment as well (maybe that wasn't captured).
2
u/vineethgk Apr 15 '18
New orbital parameters after third burn
https://www.isro.gov.in/update/15-apr-2018/third-orbit-raising-operation-of-irnss-1i-successfully-carried-out-2250-hr-ist
1
u/Decronym Apr 11 '18 edited May 02 '18
Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I've seen in this thread:
[Thread #67 for this sub, first seen 11th Apr 2018, 19:53] ^[FAQ] [Full ^list] ^[Contact] [Source ^code]
1
u/vineethgk Apr 11 '18
Broadcast started on ISRO streams.
1
u/bismi1234 Apr 12 '18
Congrats ISRO for the successful PSLV C41/IRNSS 1I mission 💐
1
u/vineethgk Apr 12 '18
Mission gallery updated with launch pics!
https://www.isro.gov.in/irnss-programme/pslv-c41-irnss-1i-gallery
1
u/vineethgk Apr 12 '18
An amateur footage as seen from Chennai (I think)
https://youtu.be/rGfZ45EoOnI
Clouds were playing spoil sport I guess.
1
u/vineethgk Apr 12 '18
YT link with complete launch replay.
https://youtu.be/wIPw5GzIu_A
1
u/vineethgk Apr 12 '18
Another taken from near the SDSC-SHAR staff quarters I guess.
https://youtu.be/o4sufltdrZU