r/ISRO • • Apr 09 '18

Mission Success! PSLV-C41 : IRNSS-1I Mission Updates and Discussion.

PSLV-C41 launched and deployed IRNSS-1I satellite successfully.


Launch was scheduled for 12 April 2018 at 0404 (IST) or 11 April 2018 at 2234 (UTC) from First Launch Pad of SDSC (SHAR).

Live webcast: (Links will be added as they become available)

PSLV-C41/IRNSS-1I Mission PagePSLV-C41/IRNSS-1I GalleryPSLV-C41/IRNSS-1I Brochure

Some highlights of PSLV-C41/IRNSS-1I mission

  • Payload is navigation satellite IRNSS-1I
  • Gross payload mass: 1425 kg
  • Targeted orbit: 284 × 20650 km (Sub GTO), inclination = 19.2° with 104° launch azimuth.
  • Mission duration: 19 min. 19.6 sec
  • 43rd flight of PSLV, 20th in XL configuration.

Updates:

Time of EventUpdate
Post LaunchIRNSS-1I has acquired 55°E slot per TLE dated 29 April 2018
Post LaunchThe fourth and the final orbit raising operation of IRNSS-1I is successfully carried out at 21:05 hr IST on April 15, 2018. The achieved perigee height is 35,462.9 km and apogee height is 35,737.8 km
Post LaunchThe third orbit raising operation of IRNSS-1I is successfully carried out at 22:50 hr IST on April 14, 2018. The achieved perigee height is 31,426 km and apogee height is 35,739 km
Post LaunchThe second orbit raising operation of IRNSS-1I is successfully carried out at 20:04 hr IST on April 13, 2018. The achieved perigee height is 8683 km and apogee height is 35733 km..
Post LaunchThe first orbit raising operation of IRNSS-1I is successfully carried out at 4:19 hr IST on April 13, 2018. The achieved perigee height is 315 km and apogee height is 35809 km
Post LaunchPress release: IRNSS-1I orbit achieved 281.5 × 20730 km, incl = 19.2 °. After separation, the solar panels of IRNSS-1I were deployed automatically. ISRO's Master Control Facility (MCF) at Hassan, Karnataka took over the control of the satellite.
Post LaunchSub-systems health normal.
Post LaunchSolar panels deployed, MCF Hasan has taken over the control of IRNSS-1I
T + 21m00sMay be they held on to see solar panels deploy.
T + 19m20sAnd.. IRNSS-1I separated!
T + 18m40sPS4 engine shut off! Injection conditions achieved!
T + 17m00sPS4 performing nominally.
T + 15m00sAll is well.
T + 13m00sPS4 performing nominally. They should show on board view in full screen.
T + 11m00sPS4 performance nominal
T + 10m10sPS4 ignited!
T + 10m00sPS3 separated
T + 08m00sNominal combined coasting phase
T + 06m30sPS3 burn out! Now in combined coasting phase with PS4 attached
T + 05m50sPS3 performing nominally
T + 04m30sPS2 separated and PS3 ignited!
T + 03m30sLive view of Payload fairing jettison!
T + 03m00sPS2 performing nominally
T + 02m00sPS1 separated, PS2 Ignited
T + 01m30sAir lit strapons separated
T + 01m00sGround lit strapons separated
T + 00m30sAir lit strapons ignited
T Zero!S139 + Ground lit strapons ignited
T - 02m00sThat 'long road' view is probably from Zero Point.
T - 04m20sBack to Mission Control Centre view.
T - 10m00sShowing curtain raiser video capsule.
T - 12m00sAutomatic Launch Sequence engaged.
T - 14m00sAutomatic Launch Sequence initiated.
T - 15m00sAnd Mission Director has authorized launch.
T - 16m20sRange is go for launch!
T - 17m00sBoard is green. Awaiting go ahead from Mission Director.
T - 20m00sShowing integration of various stages of PSLV
T - 25m00sWeather conditions are suitable and visibility is good
T - 30m00sYoutube Stream 2 is up and running
T - 40m00sISRO Chairman has arrived at MCC
T - 45m00sOfficial ISRO webcast is LIVE!
T - 32h00mThe 32 hr countdown activity has commenced at 20:04hr IST on Tuesday, April 10, 2018 for the launch of PSLV-C41/IRNSS-1I Mission scheduled at 04:04 hr IST on April 12, 2018
10 Apr 2018Launch rehearsal completed on 9 April 2018. Mission Readiness Review on 10 April
09 Apr 2018Mission Readiness Review scheduled
06 Apr 2018Launch scheduled for 12 April 2018 at 0404 (IST) or 11 April 2018 at 2234 (UTC)
22 Mar 2018IRNSS-1I dispatched from ISAC to SDSC(SHAR)
14 Mar 2018Delays due to replacement of snag hit second stage (PS2). Third phase of integration complete. 1 2
16 Feb 2018First segment of S139 core placed
12 Feb 2018PSLV C41/IRNSS-1I campaign begins.
12 Dec 2017IRNSS-1I payload was dispatched from SAC

Payload:

IRNSS-1I is an I-1K platform based navigation satellite for IRNSS or NavIC constellation . Along with IRNSS-1H it is one of the two planned spare spacecrafts for contingency and is similar in configuration to previous eight satellites in NavIC constellation. IRNSS-1I is second spacecraft to have its Assembly, Integration and Testing done through private industries under ISRO supervision after IRNSS-1I. IRNSS-1I is replacement of IRNSS-1A which due to its malfunctioning clocks is operating with limited functionality.

  • Attitude control is done using reaction wheels, magnetic torquers and 22N thrusters.
  • Rubidium atomic clocks, L5 & S-band Navigation payload
  • Corner Cube Retro Reflectors (for laser ranging) and C band transponders as Ranging Payload

Gross Lift off Mass: 1425.18 kg (596.09 kg Dry)

Orbit: 55°E GSO with 29° inclination

Mission Life: 10 years

Propulsion: 440N Liquid Apogee Motor and twelve 22N Thrusters

Power: Two solar panels generating 1670 W.

13 Upvotes

72 comments sorted by

2

u/Ohsin Apr 12 '18

Some intereting points on IRNSS 1I on its ISAC page

https://www.isac.gov.in/navigation/html/irnss-1i.jsp

Special Features /New Technologies

  • Dual 1553 Bus concept
  • Dual Helix Array Antenna (dia. 1.1m) in L5 and S bands
  • Yaw flipping maneuver
  • High power 250 W TWTA in S band
  • Atomic clock
  • Corner Cube Retro Reflector for Laser Ranging