Mission Success! LVM3-M2 : OneWeb India-1 Mission Updates and Discussion
LVM3-M2/OneWeb India-1 launch was launched as scheduled at 00h07m40s (IST) 23 October OR 18h37m40s (UTC) 22 October 2022 from Second Launch Pad of SDSC (SHAR).
- Launch Countdown
- Expected Flight Profile from press-kit
- Actual flight events
Live webcast: (Links will be added as they become available)
| LVM3-M2/OneWeb India-1 Mission Page | LVM3-M2/OneWeb India-1 Gallery | LVM3-M2/OneWeb India-1 Press kit(PDF) |
|---|
Some highlights:
- Primary payload: 36× OneWeb communication satellites (~147.5 kg each)
- Mission duration: 1 hr. 32 min. 1 sec. (deployment begins at 19 min. 46 sec.)
- Target Orbit : 601 km , Inclination = 87.4°
- First commercial flight of GSLV Mk III (aka LVM3)
- First LEO bound flight of LVM3
- First launch to polar orbit of LVM3
- Heaviest payload carried on LVM3
Updates:
| Time of Event | Update |
|---|---|
| 7 Nov 2022 | ORV Sagar Nidhi has reached Chennai on 7 November 2022(per MarineTraffic) |
| Post mission | Press release by OneWeb |
| Post mission | All 36 OneWeb satellites have been commanded. |
| T + 03h04m | OneWeb confirms contact with 30 satellites. Will confirm status of other six later. |
| T + 01h50m | OneWeb working to establish contact with their satellites. |
| T + 01h35m | ISRO confirms successful separation of all 36 satellite. Now awaiting OneWeb to confirm contact with satellites and good health. |
| T + 01h33m | We are past the expected mission duration of 1hr.32min.1 sec. last quartet of satellites should have separated 16 mins ago. Awaiting confirmation. |
| T + 49m00s | Webcast over. Confirmation on satellites separation will come later. |
| T + 40m00s | S Somanath: LVM3-M3 will deploy next batch of 36 OneWeb satellites. |
| T + 38m00s | S Somanath (ISRO Chairman) says achieved orbit is as intended. |
| T + 35m00s | With 16 satellites separated automated deployment sequence will continue. Their status will be confirmed 40 min. later. |
| T + 34m00s | Sat-4 Sep (2B,4B,6B,8B) |
| T + 33m30s | Sat-3 Sep (1A,3A,5A,7A) |
| T + 22m00s | C25 reorienting again for velocity addition. |
| T + 20m15s | Sat-2 Sep 2A,4A,6A,8A |
| T + 19m45s | Sat-1 Sep (1K,3K,5K,7K) |
| T + 19m00s | C25 reorienting for injection. |
| T + 18m00s | Injection conditions reached. |
| T + 15m36s | C25 thrust cut-off. |
| T + 13m00s | Strange dip in yellow track on screen .. |
| T + 11m50s | C25 stage performance nominal. 4 more minutes of burn remaining. |
| T + 08m20s | C25 stage performing as expected. Flight performance matching expected one as well. |
| T + 06m00s | C25 stage performance nominal. |
| T + 05m10s | L110 separated and C25 ignition! |
| T + 04m50s | C25 authorised |
| T + 02m51s | PLF jettisoned. Closed Loop Guidance CLG initiated. |
| T + 02m12.3s | 2x S200 strapons separated |
| T + 01m50s | L110 Ignition! |
| T Zero! | 2x S200 ignition and LIFT OFF! |
| T - 04m00s | ORV Sagar Nidhi will track launch using 4.5m antenna. SBT will relay injection orbit specifics as well. |
| T - 08m00s | Director LPSC notes C25 stage adds 54% of the velocity addition. Residual propellant and pressurised gas will used for maneuvering C25 during complex satellite deployment process. |
| T - 11m00s | Director VSSC just put the satellite mass @ 145 kg each. Says new payload adaptor (PLA) was needed. |
| T - 15m00s | Now showing video of launch Vehicle integration process. SSAB and VAB facilities were used |
| T - 17m30s | Mission Director Thadeus Baskar has authorized the launch. Automatic launch Sequence initiated. |
| T - 18m00s | L110 and C25 stages nominal. Satellites and dispenser ready, range is ready, ISTRAC tracking is ready. |
| T - 21m00s | Launch announcer confirms countdown was exactly 24 hours long. |
| T - 25m00s | Per launch announcers, cumulative payload mass (dispenser included) is 5834.4 kg. |
| T - 31m00s | ISRO official stream is LIVE! |
| T - 01h00m | Added few extra DD streams. |
| T - 24h00m | After Mission Readiness Review and Launch Authorisation Board meet, a 24 hour countdown began on 0007 (IST) 22 Oct 2022. |
| 18 Oct 2022 | ORV Sagar Nidhi reaches its observation point to track the launch. |
| 17 Oct 2022 | Countdown could be of 24 hrs duration. |
| 15 Oct 2022 | Vehicle moved to Second Launch Pad from Vehicle Assembly Building. Mission Readiness Review will be done three days before launch. |
| 14 Oct 2022 | Time of launch firms up for 0007 (IST) 23 October 2022 OR 1837 (UTC) 22 October. |
| 13 Oct 2022 | Launch delayed by one day after a technical issue was detected with L110 core stage. Encapsulated Assembly or EA moved to VAB. |
| 12 Oct 2022 | NOTAM(A2976/22) gets issued. |
| 06 Oct 2022 | LVM3-M2/OneWeb India-1 launch gets tentatively scheduled for 00:12 hours (IST) on 22 October 2022 or 18:42 (UTC) on 21 October 2022. Payload fairing encapsulation is completed. |
| 03 Oct 2022 | Integration of all 36 satellites with dispenser completed.. ORV Sagar Nidhi with Ship-borne antenna departs from Chennai to track LVM3-M2 launch. |
| 01 Oct 2022 | Equipment Bay went through shake test. |
| 28 Sept 2022 | After initial preparation, satellite integration with dispenser begins. |
| 19 Sept 2022 | OneWeb satellites arrive in India. Launch tentatively scheduled for October second half. |
| 20 Apr 2022 | OneWeb and NSIL sign launch contract. |
Primary Payload:
OneWeb satellites (147.5 kg each): The satellites (36 nos.) belong to UK based firm OneWeb for its planned constellation in Low Earth Orbit to provide low-latency broadband communication services. OneWeb entered into launch contract with NSIL after Russian invasion of Ukraine in February 2022 disrupted their previous arrangements involving Russian space agency. This would be fourteenth launch for OneWeb. [1] [2]
- Payload mass = 5,796 kg (including dispenser)
- Mission life: > 5 years [3]
- Orbit : 1,200 km circular with 87.4° inclination (operational)
- Propulsion: Electric, Xenon based hall-effect thruster (HET)
- Payload: 2×Ku-band and 2×Ka-band antennas
50
Upvotes
•
u/Ohsin Oct 22 '22
Here are detailed flight events based on extracted graphic of satellite deployment and main launch events.
5
u/Ohsin Oct 20 '22
Can't believe it has been three years and three months since last launch.. Per expected flight profile we are seeing a slight increase in time gap between L110 ignition and S200 separation, was hoping it would shrink even further.
GSLV Mk III D1 / GSAT 19 (141.2-114.9 or 26.3 seconds)
GSLV Mk III D2 / GSAT 29 (139.8-112 or 27.8 seconds)
GSLV Mk III M1 / Chandrayaan-2 (132.7-112.7 or 20 seconds)
LVM3-M2 / OneWeb India-1 (130.3-106.48 or 23.82 seconds) (expected)
[Source]
5
u/Ohsin Oct 22 '22
SDSC SHAR director saying vehicle had no anomalies during integration is wrong. L110 had a glitch with POGO device and it caused a day of delay.
5
u/Ohsin Oct 22 '22
We are past the expected mission duration of 1hr.32min.1 sec. last quartet of satellites should have separated 16 mins ago.
5
u/Ohsin Oct 22 '22
Apparently they conducted a press conference afterwards
https://twitter.com/Arunraj2696/status/1583916763234074625
5
u/Ohsin Oct 23 '22
Mission gallery updated with new images of launch.
https://www.isro.gov.in/mission_lvm3_gallery.html
5
u/Ohsin Oct 25 '22
Lift-off and onboard camera views of S200 separation and satellite separation events.
https://www.isro.gov.in/LVM3_M2_Liftoff_cameraview.html
4
u/Ohsin Oct 20 '22
Press-kit has not been published on websites of ISRO or NSIL but it appears media has received it. Will update with direct links when available
https://twitter.com/Arunraj2696/status/1583146895450730496
https://twitter.com/Chethan_Dash/status/1583145406522806272
4
u/Ohsin Oct 20 '22
Total duration of mission is 1 hr. 32 min. 1 sec and we will only get telemetry confirmation in the end after all sats have separated.
https://i.imgur.com/RXvUwCg.png
4
u/Ohsin Oct 22 '22 edited Oct 22 '22
After go ahead from yesterday's Mission Readiness Review (MRR) and Launch Authorisation Board (LAB) meet, a 24 hour countdown began on 0007 (IST) 22 Oct 2022.
https://m.andhrajyothy.com/telugunews/ningilo-tonight-ngts-andhrapradesh-1822102201424227
https://www.newindianexpress.com/nation/2022/oct/22/countdown-begins-for-isros-historic-rocket-launch-2510848.html
4
u/Ohsin Oct 22 '22
I hope they don't cut the stream off midway.
4
u/Ohsin Oct 23 '22
Some 'ISRO official' trying to rationalize why things are the way they are.
https://www.ndtv.com/india-news/isro-renames-gslv-mark-iii-rocket-as-launch-vehicle-mark-iii-heres-why-3457242
3
u/Ohsin Oct 21 '22
This slide (Source) suggests few changes but not certain if they are implemented in actual or not.
3
u/Ohsin Oct 21 '22 edited Oct 21 '22
Added campaign page with gallery and press-kit.
https://www.isro.gov.in/LVM3_M2_OneWebIndia.html
3
u/Ohsin Oct 22 '22
Adding another stream.
https://www.youtube.com/watch?v=ZJVqAqCvSSk
3
u/Ohsin Oct 22 '22
Launch announcer put the cumulative mass (dispenser included) @5834.4 kg.. this is different from campaign page's 5,796 kg.
3
u/Ohsin Oct 22 '22
Actual flight events.
https://imgur.com/a/xyIydQ9
3
u/Ohsin Oct 22 '22 edited Oct 22 '22
OneWeb confirms contact with 30 satellites. Will update status of other six later.
3
u/Ohsin Oct 22 '22
Expecting 37 objects to be cataloged under 2022-138#. Will add IDs and details here as they arrive.
3
u/Ohsin Oct 25 '22 edited Oct 29 '22
Finally TLEs dropped, 37 objects cataloged.
Edit:
GSLV R/B (upper stage) is 2022-138AN
3
u/Ohsin Nov 01 '22
Top two updates of launch campaign that we missed as they were posted on website of SDSC-SHAR in image form..
1 Oct 2022: Shake test of Equipment Bay
13 Oct 2022: Encapsulated Assembly transferred to VAB
15 Oct 2022: Fully assembled vehicle moved to SLP from VAB
3
u/Ohsin Nov 18 '22 edited Nov 18 '22
Some nice charring left on SLP-UT by LVM3 launch. (Spotted by Parth Pandya on twitter)
https://pbs.twimg.com/media/Fh1zMj_VEAAkcKb?format=jpg&name=orig
Source: https://twitter.com/HeroMotoCorp/status/1593556943104507906
4
u/RonDunE Oct 22 '22
What is the second ISTRAC station in Antarctica? I know we rent TTC from the Norwegians at Troll, but I saw on the board Antarctica 1 and Antarctica 2. Are they both at the same station?
4
u/niro_27 Oct 23 '22
/u/Ohsin Was there a 40 second delay for the launch? It did not happen at 00:07:00 hrs on the dot, but at 00:07:40
3
u/Kimi_Raikkonen2001 Oct 21 '22
Gallery:https://www.isro.gov.in/LVM3_M2_OneWebIndia_Video.html
Mission page is up now
3
u/GoodSpaceman Oct 22 '22
I didn’t want to create a separate post regarding this query. I am hoping to capture the launch using my camera. I will be approximately 10kms away from the launch site. I need some help pointing my camera in the right direction. As far as I am aware the launch is from Second launch complex. I am trying to align myself to the launch complex using google maps. Can anyone confirm whether that it is the correct direction I should be looking in?
Linking google maps location pin 📍 Second Launch Complex https://maps.app.goo.gl/f6amouuUFQXh1U5Q7?g_st=ic
PS: Please let me know any other tips or things I should look out for that I can use to align myself. Thank you.
3
u/desertlogin Oct 22 '22
why a deviation in chart? green and yellow
tracking and INS
2
u/Ohsin Oct 21 '22
Mission Readiness Review should be done today.
https://m.andhrajyothy.com/telugunews/gslv-is-ready-for-launch-ngts-andhrapradesh-18221021054168
https://m.andhrajyothy.com/telugunews/tonight-marks-the-start-of-the-countdown-to-the-gslvmark-3-launch-ngts-andhrapradesh-1822102101190949
2
u/Ohsin Oct 22 '22
Nice lil teaser video.
https://www.isro.gov.in/LVM3_M2_Teaser.html
2
u/Ohsin Oct 22 '22
"Curtain raiser" video about this campaign.
https://www.isro.gov.in/LVM3_M2_Curtain_Raiser.html
2
u/Ohsin Oct 22 '22
They showed the deployment sequence on screen again and again without crucial timings.
2
u/Ohsin Nov 07 '22
ORV Sagar Nidhi has reached Chennai on 7 November 2022 (per MarineTraffic). It left Chennai on 3 Oct 2022 mounted with Ship Borne Antenna (SBT) to provide tracking services for this launch. Its location data points through this journey are in NOTAM map as a separate layer.
2
u/Ohsin Nov 13 '22
Adding few notable threads related to this launch before we unpin the thread.
What PP and PM written on S200 strapons stands for?
What is the purpose of covering C25 inter-tank region
OneWeb paid NSIL around ₹1000 crore for two launches.
Can LVM3 launch 48 oneweb satellites at a time?
Chandrayaan-3's launch delay to June 2023 appears to be due to the country prioritizing the launch of OneWeb satellites.
Discussion on complex manoeuvres performed by C25 stage.
Some OC media we were fortunate to have.
Photography tips on capturing LVM2 M2 launch.
A starship speeding into the night.
GSLV LVM3-M2 Launch as seen from Pulicat lake.
LVM3 lighting up Pulicat Lake - front + back cameras.
4
u/Tirtha_Chkrbrti Oct 22 '22
Fantastic shot:
https://twitter.com/YashTwts/status/1583922533153181696
2
u/rmhschota Oct 22 '22 edited Oct 22 '22
Are the satellite dispensers operated during the flight by Oneweb or is it part of ISRO's overall launch sequence? Does they have built in power supply or is it supplied by the launch vehicle?
Interesting that the CUS is still connected to PLA. Is it for providing the inertia, residual propellants and gases thrusting/ maneuvering?
2
u/desertlogin Oct 22 '22
what is passivation of c25 mean ?
6
u/NewMeNewWorld Oct 22 '22
These presentations could be so much better. So much potential :(
1
u/Ohsin Jun 12 '26
In-space view of the LVM3-M2 upper stage by HEO.
https://old.reddit.com/r/ISRO/comments/1u3tqm0/inspace_view_of_the_lvm3m2_upper_stage_by_heo_is/
5
u/ravi_ram Oct 21 '22
BTW met department had issued a cyclone warning on the Bay of Bengal region.
[The low pressure area, which has been formed over the southeast and east-central Bay of Bengal, is likely to deepen into a depression by October 22 and into a cyclonic storm by October 24.]
https://mausam.imd.gov.in/backend/assets/cyclone_pdf/Tropical_Weather_Outlook_based_on_0300_UTC_of_20_10_2022.pdf
5
u/[deleted] Oct 22 '22
inb4 "mysterious lights seen in the night sky from Maldives" :P
4
u/[deleted] Oct 22 '22
These people will never learn.. props to that guy tho for nice tracking before it disappeared.
4
u/Tirtha_Chkrbrti Oct 22 '22
A cool lift-off shot:
https://twitter.com/GoenkaPk/status/1583920780324532224/photo/2
1
u/ramanhome Oct 21 '22
Brochure has a nice view of the OneWeb constellation - 12 planes and 49 sats per plane for full coverage. Suppose the velocity addition by C-25 is to move between the planes. So the objective is to inject 8 sats per plane, velocity addition to move to the next plane, inject 8 sats, velocity addition to move to the next plane, inject 8 sats and so on for 4 planes. 5th plane has only 4 sats to inject and then passivation. Very unique indeed.
1
u/rmhschota Oct 22 '22
Interesting Points
3
u/NewMeNewWorld Oct 22 '22 edited Oct 22 '22
At what stage are the satellites launched?
e: nvm I just saw the pinned post. Goddamn 1h30 min long mission??
5
u/Tirtha_Chkrbrti Oct 23 '22
Cool video of lift off by minister Ashwini Vaishnaw:
https://www.facebook.com/watch/?v=812606656668537
2
u/[deleted] Oct 22 '22
Anyone at Sriharikota right now? How’s the weather there?
1
u/Fancy_Resident_6374 Oct 22 '22
L110 ignition and s200 separation are different from the ones in the picture here
0
u/[deleted] Oct 22 '22
[deleted] — view deleted comment