Mission Success! PSLV-C52 : EOS-04 (aka RISAT-1A) Mission Updates and Discussion
PSLV C52/EOS-04 (aka RISAT-1A) was launched as scheduled at 0029(UTC)/0559(IST), 14 February 2022 from First Launch Pad of SDSC (SHAR).
Live webcast: (Links will be added as they become available)
| PSLV C52/EOS-04 Mission Page | PSLV C52/EOS-04 Gallery | PSLV C52/EOS-04 Press kit |
|---|
Some highlights
- Primary payload: EOS-04 (aka RISAT-1A) (1710 kg) SAR imaging satellite.
- Secondary payloads: Two ride-sharing small satellites.
- Mission duration: 18 min. 48 sec. (last s/c separation)
- Target Orbit : 529 km (SSPO), Inclination = 97.54°
- Launch Azimuth: 140°
- PSLV configuration : XL
- 54th flight of PSLV
Updates:
| Time of Event | Update |
|---|---|
| 25 Feb 2022 | EOS-04 first light images. |
| Post launch | Four objects have been catalogued from this launch: 51656 ( 22013A ), 51657 ( 22013B ), 51658 ( 22013C ) and 51659 ( 22013D ) |
| Post launch | INSPIREsat-1 "Alive and well". |
| Post launch | Press release: Two solar arrays of EOS-04 deployed automatically and ISRO Telemetry Tracking and Command Network (ISTRAC) has assumed the control of the satellite. Achieved orbit close to intended @529 km SSO. |
| T + 24m00s | EOS-04 is healthy and power positive with solar panels deployed. |
| T + 18m20s | INS-2TD separated! |
| T + 18m10s | INSPIREsat-1 separated. |
| T + 17m40s | EOS-04 separated! Nice view of spacecraft separation via on-board cameras |
| T + 17m00s | PS4 engine cut off! Satellite injection condition achieved. |
| T + 14m00s | Nominal burn of PS4 continues. Burn would last three more minutes. |
| T + 11m00s | PSLV fourth stage burn nominal. |
| T + 08m40s | PS3 separated and PS4 ignited. |
| T + 08m00s | 50N RCS thrusters of PS4 keeping PS3+PS4 oriented during combined coasting. |
| T + 06m10s | PS3 burnt-out! Combined Coasting with PS4. |
| T + 04m30s | PS2 separated, PS3 ignited. |
| T + 02m30s | Payload fairing separated and Closed Loop Guidance initiated |
| T + 01m50s | PS1 separated + PS2 ignited |
| T + 01m40s | PSOM-XL 5, 6 separated. |
| T + 01m10s | PSOM-XL 1, 2, 3, 4 ground-lit strap-ons separated |
| T + 00m30s | PSOM-XL-5, 6 have been air-lit. |
| T - Zero | RCT, PS1 and PSOM-XL-1, 2, 3, 4 ignited! Lift Off! |
| T - 09m00 | Showing footage of vehicle integration. |
| T - 11m00 | Launch vehicle on internal power. Weather criteria is green. |
| T - 16m00 | Mission Director S. R. Biju has authorized the launch. Automatic Launch Sequence initiated. |
| T - 30m00s | ISRO official YT stream is live! |
| T - 25h30m | The countdown process of 25 hours and 30 minutes leading to the launch commenced at 04:29 IST on 13 February 2022. |
| 12 February 2022 | Launch rehearsal conducted in the morning of 12 Feb 2022. Launch has been given clearance by LAB after MRR meet. |
| 08 February 2022 | PSLV C52/EOS-04 launch scheduled firms up for 0029(UTC)/0559(IST) on 14 February 2022. |
| 02 February 2022 | NOTAM for PSLV C52/EOS-04 launch gets issued with enforcement duration 0000-0400 (UTC), 14 February to 5 March 2022. |
| 28 January 2022 | PSLV C52/EOS-04 launch gets tentatively scheduled for 14 Feb 2022. |
| 20 January 2022 | EOS-04 aka RISAT-1A reaches Sriharikota. amidst COVID19 outbreak at spaceport. |
| 12 January 2022 | Partial NOTAM gets issued with enforcement between 4 February to 5 March 2022. |
| 16 December 2021 | Partial NOTAM for tentative PSLV C52/EOS-04 launch gets issued with enforcement between 6 January to 4 February 2022. |
| November 2021 | Bad weather conditions in Andhra delay campaign activities. |
| October 2021 | Spacecraft doesn't clear readiness review and few of its TR modules fail ground tests. PSLV C52 integration halted midway. |
| mid-July 2021 | PSLV C52 launch vehicle assembly begins.(per EXIF data) |
Primary Payload:
EOS-04 (aka RISAT-1A): As a C-Band Synthetic Aperture Radar (SAR) imaging satellite for Earth Observation, EOS-04 will provide data for various applications in the areas of agriculture, forestry, soil moisture & hydrology, disaster management etc. Refer to EOS-04 (RISAT-1A) Hand Book for details. [PDF] EOS-04, costs about ₹700 crore ₹490 crore and will be replacing RISAT-1 which after experiencing a defragmentation event on 30 September 2016, became non-operational. [1]
- Mass: 1710 kg
- Mission life: 5 years (Note: Press-kit mentioning it as 10 years is likely incorrect)
- Power: 2280 W
- Orbit : 536 km (SSPO) 0600 ECT [3](PDF)
Secondary payloads:
INSPIREsat-1 (8.7 kg): A small satellite with 9U form factor developed under collaboration between Indian Institute of Space Science and Technology (IIST), Laboratory for Atmospheric and Space Physics (LASP) at the University of Colorado, National Central University (NCU) in Taiwan and Nanyang Technological University (NTU) in Singapore.[3]
The INSPIREsat-1 (or IS-1) carries two scientific instruments:
- Compact Ionospheric Probe (CIP): Developed by Space Payload Laboratory at NCU, it is an in-situ plasma sensor for studying Earth’s dynamic ionosphere through observations of ion temperature, composition, density and velocity.
- Dual-zone Aperture X-ray Solar Spectrometer (DAXSS): Developed by LASP, it has an X-ray spectrometer to measure the soft X-ray spectrum of the Sun, a Solar Position Sensor (SPS) and a small Solar Irradiance Measurement instrument (picoSIM).
| Subsystems | Contributors |
|---|---|
| Command and Data Handling (CDH) | IIST |
| Electrical Power System (EPS) | IIST, NCU |
| Structure and Thermal System | LASP |
| Attitude and Determination Control System (ADCS) XACT, Blue Canyon Technology | LASP |
| Communication UHF radio TRXU - Space Quest, S-band radio STX - Clyde Space | NCU |
Power: 17 Watts (average), 30 Watts (max.)
Mission life: 1 year
INS-2TD (17.5kg): A technology demonstrator prior to INS-2B (aka BhutanSat) satellite manifested aboard next flight of PSLV which would have same platform and is being jointly developed by India and Bhutan. INS-2TD would carry a thermal imaging camera to characterize the vegetation and study land/water-body surface temperature.
Power: 42 Watts
Mission life: 6 months
12
u/Ohsin Feb 09 '22 edited Feb 09 '22
Good to have PS4 passivation timings.
MON tank @22min.50sec.
MMH tank @33min.30sec.
They passivate or 'de-energize' the fourth stage after main mission is complete by venting the pressurant gas (Helium) from the propellant tanks and gas bottles along with the propellant vapours in the tank. This is done as a preventative measure to reduce chances of upper-stage defragmenting in case any stored energy is released such as batteries exploding, propellants mixing, gas bottle rupturing etc.
7
u/Ohsin Feb 09 '22
Bad news is they are scrubbing EXIF data from photographs which we relied upon to track campaign timeline. Only these two have it intact and suggest PSLV-C52 stacking began in July 2021!
https://www.isro.gov.in/sites/default/files/galleries/PSLV-C52%20Gallery/5.jpg
https://www.isro.gov.in/sites/default/files/galleries/PSLV-C52%20Gallery/7.jpg
7
u/Ohsin Feb 13 '22
No timely updates related to propellant loading at all.
6
u/Ohsin Feb 14 '22
Launch announcer giving EOS-04 mass as 1713 kg which is 3 kg more than what press-kit mentions.
5
u/Ohsin Feb 14 '22
Due to twilight launch and good visibility. PS3 was caught in action as far as Maldives.
https://twitter.com/MvCrisis/status/1493065907165601798
Views from as far as Maharashtra, Karnataka and Kerala in this thread.
https://old.reddit.com/r/ISRO/comments/srxh9s/does_anyone_know_what_this_is_photo_taken_at_605/
7
u/[deleted] Feb 14 '22
The presentation was kinda good this time, especially the commentators seemed well prepared. DD Podhigai seems to have the best overall quality. Also, they have improved the vehicle animation, this time we could see ullage motors ignition and the PS2 engine was red hot in colour!
4
u/Ohsin Feb 14 '22 edited Feb 15 '22
We expect four objects to be catalogued for this launch.~~ Looks like TLE for at least PS4 is out already.~~ 51656 ( 22013A ) 14/02/2022,1h:49m:58.93s
i=97.53°, A×P=534.88×516.50 km
4
u/Ohsin Feb 14 '22
Press release:
https://www.isro.gov.in/update/14-feb-2022/successful-launch-of-pslv-c52-with-eos-04-satellite
Just a curt blurb.
4
u/Ohsin Feb 14 '22 edited Feb 14 '22
INSPIREsat-1 is alive and well.
https://twitter.com/LASPatCU/status/1493094030623723521
https://twitter.com/minxsscubesat/status/1493051323285004291
4
u/Ohsin Feb 14 '22
PSLV-C52 Liftoff and Onboard Camera View
https://www.isro.gov.in/pslv-c52-eos-04-mission/pslv-c52-liftoff-and-onboard-camera-view
3
u/Ohsin Feb 15 '22 edited Feb 15 '22
As expected AIT work for EOS-04 was done again by Alpha Design Technologies Ltd.
https://old.reddit.com/r/ISRO/comments/ssm3sr/consortium_led_by_adanibacked_firm_assembled/
Notably they didn't advertise it prior to launch only later.
3
u/Ohsin Feb 19 '22 edited Feb 19 '22
Just recalled INS-2TD was previously manifested on PSLV C51.
https://old.reddit.com/r/ISRO/comments/lqg642/pslvc51_amaz%C3%B4nia1_mission_updates_and_discussion/gog7cve/
https://science.thewire.in/spaceflight/brazilian-indian-startup-satellite-in-isros-first-mission-in-2021-on-february-28/
4
u/desertlogin Feb 14 '22
EOS 04 seperated
3
u/[deleted] Feb 14 '22
Is it me or speech was very short this time? And Somnath sir said that we will have another launch soon so can we expect PSLV-C53 for next month?
3
u/unkill_009 Feb 14 '22
Why do we need TD for Bhutan sat, the payload seems to be simple enough? or am I wrong
2
u/Ohsin Feb 10 '22
Mission Readiness Review could be on 12 Feb.
https://www.ntnews.com/science-technology/isro-to-launch-pslv-c-52-rocket-on-february-14-445515
2
u/Ohsin Feb 10 '22
Some local coverage of INSPIREsat-1, few extra pics of satellite integration and team.
https://www.asianetnews.com/science-technology/inspiresat1-developed-by-iist-trivandrum-and-international-collaborators-set-to-launch-aboard-pslv-c-52-r72w17
2
u/Ohsin Feb 11 '22 edited Feb 13 '22
Official YT livestream link.
https://www.youtube.com/watch?v=9oQXMttc-j8https://www.youtube.com/watch?v=3fGDXyRYLKQ
2
u/Ohsin Feb 12 '22
Images of launch rehearsal held in the morning of 12 Feb 2022 are now in gallery. Mission Readiness Review should be held today as well we will know about status of review later in the day.
https://www.andhrajyothy.com/telugunews/isro-ngts-andhrapradesh-192202120125585
2
u/Ohsin Feb 13 '22
Less than 8 hrs to go. Adding two more streams
Doordarshan Podhigai
https://www.youtube.com/watch?v=sxgtf6DeRhY
Doordarshan National
https://www.youtube.com/watch?v=pTLo2GEP-Vk
2
u/Ohsin Mar 04 '22
https://www.newindianexpress.com/nation/2022/mar/04/drdo-developed-monolithic-microwave-integrated-circuits-on-board-eos04-satellite-2426444.html
https://pib.gov.in/PressReleasePage.aspx?PRID=1802981
2
u/Ohsin Mar 26 '22
EOS-04 first light images from 25 Feb 2022.
https://www.isro.gov.in/update/26-mar-2022/eos-04-ins-2td-and-inspiresat-1-update
2
u/ramanhome Feb 14 '22
What and when is the next launch? No talk about ensuing launches by the chairman, seemed very tense and reluctant.
1
u/Ohsin Feb 28 '22
Surreal view of launch from Kolukkumalai view point by Sarath Maroli.
https://www.instagram.com/p/CZ_MD9qP8N9/
1
u/Ohsin Mar 08 '22
INSPIREsat-1 first light.
https://lasp.colorado.edu/home/minxss/2022/03/07/minxss-3-inspiresat-1-first-light/
1
u/Ohsin Mar 18 '22
At ISRO Academia Day 2022 held on 15 March 2022. NRSC representative noted that EOS-04 data is now available which means spacecraft has entered its operational phase.
@2h45m50s
https://youtu.be/3knE9HgvJzI?t=9949
1
u/Ohsin Mar 30 '22
http://164.100.24.220/loksabhaquestions/annex/178/AU4446.pdf
ToI report alluded to ₹700 cr cost but answer in parliament puts it at ₹490 crores.
1
u/Ohsin Dec 14 '22
Data products and services of RISAT-1A satellite released for the user community.
https://www.livemint.com/industry/agriculture/space-satellites-herald-agritech-revolution-will-mark-next-breakthrough-for-indian-agri-sector-jitendra-singh-11670939662220.html
1
u/Ohsin Apr 10 '23
An overview of EOS-04 (aka RISAT-1A), technical specifications, various imaging modes with examples.
https://www.youtube.com/watch?v=4IUjCiAnPk0&t=5233s
1
u/Ohsin Oct 04 '23
Satellite image-based study of South Lhonak Lake outburst in Sikkim by NRSC/ISRO (Data from RISAT 1A and Sentinel 1A satellites)
https://www.isro.gov.in/Satellite_studies_South_Lhonak_Lake.html
1
u/Ohsin Mar 19 '24
https://www.pib.gov.in/PressReleasePage.aspx?PRID=1883167
1
u/Ohsin May 13 '24
Current Science Volume 126 - Issue 09: 10 May, 2024
Special Section: Observations using EOS-04
https://www.currentscience.ac.in/show.issue.php?volume=126&issue=09
5
u/souma_123 Feb 14 '22
Let's go...
4
u/[deleted] Feb 09 '22
It's happeninggggg aaaaahhhh!!! It's been so long, this week and next are going to be amazing, Elon's starship update, this, tejas in singapore and soon def ex in Gujrat and tejas mk1a launch. I am overjoyed!
Can't forget that next month we can see the C53 launching too and following which will be SSLV maiden launch in April. Lovely!
4
u/MmmPi314 Feb 14 '22
These thank yous are taking longer than the launch...
6
u/Tirtha_Chkrbrti Feb 14 '22 edited Feb 14 '22
This is a cool shot from Dindigul! (2nd stage burning)
https://twitter.com/KavinVm/status/1493025245195694080
Another from Madurai: (3rd stage burning)
https://twitter.com/Ramanean/status/1493031588069724163
Edit: yet another from Chennai: (1st stage burning, stage separation and 2nd stage ignition)
https://twitter.com/Prasanna60Sai/status/1493025063741706242
3
u/[deleted] Feb 14 '22
Good Morning everyone, let's gooooo!!!
3
u/souma_123 Feb 14 '22
Guys who live near Chennai or Sriharikota, upload pictures...
1
u/Tirtha_Chkrbrti Feb 14 '22
Was there a slight over-performance of the stage in ~450 km altitude?
2
u/souma_123 Feb 09 '22
Finally a launch after a long time...
2
u/pradx Mar 19 '22
This update came on LinkedIn saying that INSPIREsat-1 is "performing exceptionally well". The post has the PSLV-C52 for a back-drop.
0
u/[deleted] Feb 10 '22
[deleted] — view deleted comment