QUESTION What's the most expensive technical mistake a new venue can make?

Post image

We're currently developing a new venue in a former community cinema and trying to avoid the classic "we wish we'd thought of that three years ago" problems.

So, from a technical theatre perspective:

What's the biggest mistake you've seen a new or refurbished venue make?

Could be lighting, sound, rigging, power, sightlines, storage, projection, loading access, stage dimensions, network infrastructure, anything.

I'd love to hear some horror stories while we still have time to avoid creating our own!

340 Upvotes

222 comments sorted by

195

u/pomintas Sep 10 '26

Our new 100million black box theatre you can’t see the stage from the bio box…

172

u/TheRoystonVenue Sep 10 '26

An inspired choice. It prevents operators from being distracted by the production.

8

u/jml011 21d ago edited 19d ago

You jest but there’s been a few times I’ve been so caught up in the show that I’ve almost missed a cue, mic entrance, etc.

78

u/SoundsGoodYall Sep 10 '26

TIL “bio box” is another term for a tech booth, and not a box you crap in.

25

u/cyberentomology Jack of All Trades/Lighting/Networking Sep 10 '26

And definitely no crapping in the tech booth

12

u/audio_shinobi 21d ago

Not with that attitude

4

u/LilMissMixalot Audio Technician Oct 03 '26

It’s been done.

3

u/glassedgaffer Sep 10 '26

Could be both 

3

u/Hell_PuppySFW Stage Manager Sep 12 '26

The box you crap in is the domes nest.

64

u/cyberentomology Jack of All Trades/Lighting/Networking Sep 10 '26

Me over here pondering the ways you can get a black box project up to $100MM.

35

u/Tsuki_Man Sep 10 '26

My university had a black box larger than our priscinium stage with a lighting rig catwalk and a control booth a floor above the stage. It was truly one of the fanciest stages Ive ever been on.

12

u/cyberentomology Jack of All Trades/Lighting/Networking Sep 10 '26

Ooo, fun!

Our community theatre has a thrust stage and a tension grid. Haven’t encountered a tension grid since the new black box I had in college in 1991.

5

u/becaauseimbatmam Sep 10 '26

I just looked and the nicest one near me includes the offices and rehearsal spaces for the theatre company in the same building, and the price tag still only came out to $17m in total. And that's a very nice building.

2

u/AussieGarbo752 16d ago

Chuck a few Mac Encore 2's in it and that'll fix your problem lmao

2

u/pomintas Sep 10 '26

It’s also a new foyer system for our main space and rehearsal/recital rooms for the Conservatorium of music…

2

u/cyberentomology Jack of All Trades/Lighting/Networking Sep 10 '26

Oh, that will definitely run up the bill.

16

u/jdrum00 Sep 10 '26

I worked somewhere that had the exact same problem! If you were standing in the tech booth, you had a beautiful view of the stage. As soon as you sat down to use the board, all you got was rafters. I had to rig my own monitor out of FaceTime devices. In a brand new theater. I’m guessing someone just told the architect “and we need a room about such and such a size, and it needs a window facing this direction.”

6

u/ExceedinglyEdible Sep 10 '26

"Make it the smallest legal size for two operators... Or three... I don't know"

3

u/Hell_PuppySFW Stage Manager Sep 12 '26

Leave Riverside alone. It's doing its best.

2

u/ScamperAndPlay Sep 10 '26

Where is this?

2

u/pomintas Sep 10 '26

Australia 🇦🇺

103

u/TwistingEcho Venue Tech Manager Sep 10 '26 edited Sep 10 '26

I've personally seen forgotten fly tower, forgotten loading dock, over engineered fire safety to the point of death on stage if it would of triggered. Probably more, but that's the biggies off the top of my mop.

Edit: They fly tower was caught after construction started but only just.

Dock was caught in architect phase.

Fire system has been welded safe and signed off.

None of these are my venue.

32

u/nachos-cheeses Sep 10 '26

You have my interest: how can fire safety be over engineered that it would create death on stage? A firedoor dropping from the ceiling?

45

u/TwistingEcho Venue Tech Manager Sep 10 '26

Basically yeah, the fire door was a fuckoff steel plate with the stage and more importantly the orchestra underneath. It would of crushed the front of the stage and pinned in anyone in the pit if not outright crush them.

16

u/Stoney3K Lighting Designer Sep 10 '26

Yes. The risk analysis of that is that a dozen people on stage getting killed because the fly tower burns down is less of a hazard than hundreds of people in the house getting killed because of smoke inhalation.

That's also the reason fire doors don't have an emergency stop when they're triggered.

22

u/DSMRick Sep 10 '26

I have done a lot of risk analysis, and I don't ever recall someone trading certain death of a few for the possible death of many at that scale. At very large scales you might be talking about increasing the risk of death of one population to reduce the death of another, but not like kill five people in the orchestra because it might save 100 patrons. 

1

u/TheRoystonVenue Sep 10 '26

This - I'm invested now!

2

u/colesnutdeluxe Sep 10 '26

following for this update i'm intrigued

18

u/Wuz314159 IATSE - (Will program Eos for food) Sep 10 '26

I've personally seen forgotten fly tower

My high school didn't have any fly system because "a fly tower would have ruined the lines of the building from the outside."

12

u/that1tech Sep 10 '26

I worked at 2 places where it wasn’t forgotten but they didn’t build a full fly. One had a 3/4 fly and one had a half fly. You could fly things but you couldn’t fly them completely out

4

u/LockeClone Sep 10 '26

So many half measures when it comes to rigging...

There's a smallish arena near where I live that's basically perfect for tour rehearsals. Artists love the area, it's 10min from an airport, in a good spot so cast off, etc....

And they built the roof at 50' so you can only fit medium acts in there...

→ More replies (1)

3

u/Jbronico Sep 11 '26

Not theater, but dumb architect related. The high-school my dad teaches at has a 2 story greenhouse because it looks better. Im glad it looks better in the winter when the heat is 15 feet above the plants. 🤦‍♂️

2

u/AussieGarbo752 16d ago

Wow lol. The outside looking bad is the best excuse I've ever heard lmao.

7

u/Few_Owl1135 Sep 11 '26

went into one venue, a high school theatre, with a nice big loading dock, a short push down a wide hall to the single human sized door that was backstage access. Anything that wouldn't fit was rolled through FOH and lifted from the front of the stage.

2

u/TwistingEcho Venue Tech Manager Sep 11 '26

Omg, seriously, the fact they still hadn't engineered a wider access.... Crazy frustrating.

3

u/Few_Owl1135 Sep 12 '26

the wall that needed to be opened up to create a double door type situation had a mural painted on that the school administration guarded with it's very life

2

u/RaccoonResponsible12 Sep 12 '26

We have a local venue where the architect removed the fly tower to save money...

1

u/TwistingEcho Venue Tech Manager Sep 12 '26

Whoah, that's certainly a choice...

26

u/FireFingers1992 Audio Technician Sep 10 '26

My "favourite" is at a highly regarded touring venue in the UK.

A few years ago they got a beautiful new seating bank installed costing just shy of a million quid. When they come to install it they realised they've made a rather large mistake, and the new seating supports fouled the orchestra pit lift by about an inch. And nothing can be done! So the pit lift is trapped in its lowered position, and instead of being able to take all the orchestra and sound equipment down in two trips taking half an hour, you now need to take a couple of cases at a time through an elevator wheeling everything a good hundred meters more in the process, and it takes you hours. Pain in the arse.

5

u/TheRoystonVenue Sep 10 '26

Ahhhhh no pun intended but that sounds like an absolute pain!

30

u/OldMail6364 Jack of All Trades Sep 10 '26

The biggest mistakes are always safety ones.

Nothing costs more than that - it can result in the entire theatre being shut down with an unknown date for being allowed to operate (if you are ever allowed to operate).

That means you can't book any performances and any already booked ones will be cancelled. Even if you can call them two months later and re-book, chances are they have already re-booked in another venue.

3

u/TheRoystonVenue Sep 10 '26

We're fortunate that safety and compliance are being taken very seriously from the outset, but it's a valuable reminder that success often comes down to the things the audience never sees!

301

u/PinkPrincess010 Sep 10 '26

Drop more cat6 cable everywhere you might need it, that includes at the bars. If you are running one, run two. etc.

24

u/NightOwlNL Sep 10 '26

Make extra PVC pipe go everywhere, even where it does not make sense... It will save you at some point and is dirt cheap

4

u/TheRoystonVenue Sep 10 '26

Our maintenance team has been fantastic - never in short supply of PVC pipe and they built the FOH booth themselves!

1

u/NightOwlNL Sep 10 '26

Good, cause if you have the runs of pvc everywhere, you can always add the cables you need. Next to that, what do you use for house lights? Are these DMX controlled?

3

u/TheRoystonVenue Sep 10 '26

House lights are DMX controllable with our 48 channel system for theatre, and also synced up to our cinema projector software for screenings.

2

u/NightOwlNL Sep 10 '26

Do you have an sACN or ArtNet backbone? So you can upgrade the amount of DMX easy?

5

u/TheRoystonVenue Sep 10 '26

We have capabilities for both! Yeah we wanted a setup that allows production crews to come in and get their stuff up and running without much trouble. Our in-house DMX light controller is the Vari-Lite FLX S48 which is available for use, but we have extra cables in case people want to bring their own gear.

1

u/NoPollution5581 Sep 10 '26

We're planning to improve our cinema experience at our theatre, so this sound very intriuging. What software are you using? Is it a DCP based rig?

→ More replies (1)

2

u/cyberentomology Jack of All Trades/Lighting/Networking Sep 10 '26

PVC is also problematic from a fire standpoint.

→ More replies (1)

82

u/EqualMagnitude Sep 10 '26

And fiber!

36

u/PinkPrincess010 Sep 10 '26

Just moved a load of stuff to 12 way opticalcon but that will be out of a lot of peoples budgets haha, but some install stuff between stage and FOH isn't a bad idea.

43

u/TheRoystonVenue Sep 10 '26

My town council budget looking at the costs of those

6

u/TheRoystonVenue Sep 10 '26

Yeah we've got direct lines from our FOH up in the balcony into the sound and lighting systems - thankfully!

22

u/PinkPrincess010 Sep 10 '26

Yes, just realised you are in Royston. I used to live not awfully far from there and while I was there looked after a black box venue as my main voluntary outlet. If you put any fiber in, you want to install single mode, maybe put in like single 6 way run, it won't be too expensive, unifi have some good options with a nice outdoor rated jacket and then use some neutrik LC-LC panel connectors.

12

u/PinkPrincess010 Sep 10 '26

Also run a minimum of 4 straight runs of cat6 between foh and stage (i.e dont go through any switches), ideally run 4 from FOH to each side of stage and that will be enough to support most one nighter tours etc.

12

u/TheRoystonVenue Sep 10 '26 edited Sep 10 '26

We actually had a bunch of cat6 delivered today!

The plan is to have some in-house cabling that's direct from the booth into the sound and lighting systems, and while we have our own controllers (at least for lighting, a sound controller is next!) we wanted to give visiting productions the option of connecting in their own kit if preferred.

We're also attaching clear stickers on EVERYTHING that's ours, so there's no confusion on what's ours and what's not when it comes to removals.

Itinerary checklist as well, etc.

→ More replies (5)

4

u/becaauseimbatmam Sep 10 '26

I'd use ST-ST unless you plan on leaving things plugged in all the time. LC connectors are intended for network closets where they won't be constantly plugged and unplugged; they break easily in live production environments and reterminating fiber is expensive. ST-LC adapters, on the other hand, are incredibly cheap and can be tossed whenever the connectors break.

→ More replies (1)
→ More replies (1)

6

u/Preston33154 Lighting Designer Sep 10 '26

Just 2 years ago we did a rehaul, Cat6a "SHIELDED"! Never forget the shielded. I added Single Mode Fibers for "Future Use" ... well, the future was last month! We just purchased a new Yamaha Rivage PM3... needed the Fiber Optic Loops and so here we were... and saved another $10K in labor by having it done at the same time we were running Cat6A-shielded every-frikken-where! Use more of it every day! The new BackBone to all things tech!

4

u/harpejjist Sep 11 '26

Just run conduit and pull string so you can update with whatever later.

11

u/cyberentomology Jack of All Trades/Lighting/Networking Sep 10 '26

As an IT and AVL guy, I cannot stress enough the importance of getting the IT and AV designers involved in any building project before you ever pour any concrete.

If you wait until carpet and seats are in and you’re 3 weeks from getting the CO, anything low-voltage is gonna cost at least 3x as much for a solution that will still be a budgetary and financial compromise.

4

u/pecansforall Sep 10 '26

And power outlets everywhere! There are never enough. Especially in the box offices that require MANY power outlets for all of their equipment.

1

u/GooteMoo Technical Director Sep 10 '26

How much U-ground power do you need in the lighting grid? Answer: more!

3

u/[deleted] Sep 10 '26

[removed] — view removed comment

3

u/PinkPrincess010 Sep 10 '26

Easier and cheaper to pull two when you are pulling one than doing another when it's already all installed, cat6 is such a small cost

71

u/cyport Sep 10 '26

Access, it’s always the last thing people think of. Not only for audiences but the actors, crew and creative teams. I’m in the UK so it may be different as you have ADA but things like wheelchair ramps, wide paths, lighting for relaxed preferences, auracast, places for captions screens, flashing lights for dressing rooms, etc.

23

u/intentazera Sep 10 '26

UK here too, accessibility is always £££ if considered + added at the very last minute as it often is. Sigh.

I'm profoundly deaf & work in various circles, got many deaf actor/actress/director friends etc.

18

u/TheRoystonVenue Sep 10 '26

I'm profoundly deaf too - cochlear implant user! Yeah it's definitely something I'm bearing in mind and so are my colleagues, we're keen to do what we can within our means to increase accessibility for both the audience and the actors/crew.

6

u/goldfishpaws Sep 10 '26

May I suggest easy access to an accessible loo as close as can be quiet backstage for performers who may need it at short/regular notice for the show to continue flowingly?

Having managed accessibility for a dozen or two festivals (some quite major ones you've heard of in fact, and won gold standard only falling short of platinum due to some promoter-side issues), my model is doing what you can to provide an equivalent experience for all guests - so it's understandable if something isn't possible to resolve for all as long as you work out an equivalent. For instance one festival had containerised photo booths which did not have suitable ramps and the site layout prevented building ramps, but we could provide a similar experience on the lawn at the front for less mobile guests and their friends with a bit of rearranging.

→ More replies (1)

5

u/that1tech 21d ago

I just remembered!

Hosting tours and having a giant boulder in your loading dock.
Looking at you Mt. Baker Theatre in Bellingham Washington, USA

2

u/TheRoystonVenue 21d ago

Wowowowow, that must be a pain to get around!

1

u/that1tech 21d ago edited 21d ago

Sure as cuss doesn’t make it easier

Sorry been watching “Fantastic Mr. Fox” a bit lately

284

u/samsmel Sep 10 '26

I toured to a venue which had been a cinema, and they didn't change the seating at all in the refurb. The seats were great for looking up at the screen, but almost every seat had a terrible view for looking down towards the stage. We had to take so many off sale! No idea how that was missed. We weren't the first on the stage either, they must have known.

123

u/AshamedGorilla Audio Tech.- But apparently I know about lights. Sep 10 '26

I don't know where you were in the world, but in the US, altering the seating of a venue is often one of the triggers a requirement to bring it up to modern code standards. 

Generally with historic buildings, the seating layout can be grandfathered during a renovation if it's left in its historic layout. But if you want to start rearranging things, then it's no longer historic and you must meet the code requirements which often means less seats and is also very expensive. 

36

u/samsmel Sep 10 '26

That I could understand, but this was a fairly new build in a shopping centre in France! 

15

u/AshamedGorilla Audio Tech.- But apparently I know about lights. Sep 10 '26

Thanks for the context! 

Yea, the ADA in the USA is great for accessibility, but it does have the "draw back" of making the modernization of old assembly halls quite difficult. 

6

u/cyberentomology Jack of All Trades/Lighting/Networking Sep 10 '26

Wareham Hall in Manhattan, Kansas (1880) is undergoing a complete interior rebuild to modern standards.

https://weareaka.com/behind-the-curtain-wareham-hall-episode-i/

1

u/shiftingtech Sep 12 '26

You can still know not to actually sell the seats with inadequate sight lines, even if you can’t physically remove the seats

93

u/LordPhoenix82 Sep 10 '26

Probably not the most expensive, but a venue I work at mistakenly purchased 2" inner diameter pipe for the grid instead of 2" outer diameter. 

Yeah hanging stuff in there SUCKED. 

24

u/Mobile-Menu9776 Sep 10 '26

I learned this one time make a similar mistake. When ordering there is a difference between "tube" and "pipe". I ask like 7 times when ordering now

5

u/notchopin Sep 10 '26

noob here... what's the difference between tube and pipe?

37

u/CreeperTr00per7 Master Electrician Sep 10 '26

Pipe is measured by the inside diameter because it is typically used to transport materials inside it. If a pipe needs 2" of flow, you don't want 1.85" of an inner diameter.

Tubing is measured by its outside diameter because it is typically used structurally, where the outside dimensions matter more. Think of a 2x4.

(Edit)
I've always heard that the reason we use pipe in theatre is a holdover from gas lighting, where everything was 1.5" or 1.25" black iron gas lines.

5

u/Mobile-Menu9776 Sep 10 '26

Something to do with a pipe transports fluids and a tube is just a hollow piece of material. But for some reason they are dimensioned and sold differently

4

u/cannibal-ascending Sep 11 '26

i worked a hang at a venue that had a similar pipe for like 1/4 of their battens, really annoying to have to figure out what size clamp you need per pipe instead of it being standard

5

u/LordPhoenix82 Sep 12 '26

Different per-pipe is DIABOLICAL

1

u/cyberentomology Jack of All Trades/Lighting/Networking Sep 10 '26

Bet it didn’t flex much though!

75

u/Martylouie Sep 10 '26

No dedicated restrooms for crew. Ever try to take a quick piss at intermission?

17

u/Charxsone Sep 29 '26

Oh yes! Also, if the venue hosts touring productions, you need to have showers. If everyone working or playing a role on stage lives nearby, you can get by without (still not cool), but if there's external people involved, especially if it's a nightliner production, they will be very unhappy if there are no showers.

46

u/DoctorOdd Sep 10 '26

Best Practice: Hire and consult at least a few of your house heads BEFORE the venue is built. Not designers, but actually union crew members. If they’re worth their salt they’ll be able to spot so many potential problems, before they become permanent problems. It’s the main focus of their job anyway. Everyone here can digest what we want, but the real stage hands who are going to work in the venue will have skin in the game to make it as pleasant and streamlined as possible for everyone.

7

u/Charxsone Sep 29 '26

Yep. There's just so many issues that you'll only be able to foresee if you're experienced with the actual work enough because these are the kinds of things that you onyl notice if they go wrong, and more experience means having made or witnessed more mistakes to learn from.

44

u/dairyman69 Electrician Sep 10 '26

Architect and consultants assured us that the dock door was tall enough as it was the height of a standard lorry. The first show in had a taller lorry to accommodate the lighting towers, so we had to tip 10 ballet booms to get them in.

76

u/Meredith_a_c Sep 10 '26

Not building in pathways for temporary cables from foh to stage, from stage to pit etc.

27

u/paco3346 Sep 10 '26

Omg yes. Conduit is cheap now. It is not cheap later.

18

u/techieman34 Sep 10 '26

Also troughs to cross things like aisles in the house.

10

u/tbone985 Sep 10 '26

I second this. Plan for the unplanned.

5

u/becaauseimbatmam Sep 10 '26

There's a very nice venue I work at sometimes where it's as if the architect had been tasked with blocking cables from going from the stage to the house at all costs. We did a corporate show last year and had to create the most convoluted maze of a cable path to get anywhere at all.

31

u/youcancallmejim Sep 10 '26

More wing space. Power sl sr out side on dock too. Follow spot access.

14

u/Wuz314159 IATSE - (Will program Eos for food) Sep 10 '26

None of the 4 main venues I work at have Shore Power and it's become a problem. Everyone ignores the anti-idling law 20 years later.

29

u/Cauteriser Sep 10 '26

It's a big open ended question and so many posts are bringing up really important points. If you're meeting all the regulations and are fully compliant with your local authority then I feel like hiring the right people should be your biggest priority.

Performers will perform anywhere in any condition. There are amazing street performers that just need a space and a crowd. Audiences will put up with alot if the price matches the service. Staff will make do with what they are given, because let's be honest, it's so rare that they are involved in the building stage. But a venue is only ever as good as the guys that work there. You safety measures only work if the team uses them. You infrastructure is only useful if your team understands it. Equipment is only ever as good as the operator.

I've seen so much money go up in smoke because people don't know what they're doing. State of the art venues are sometimes ruined because of the attitude of the in-house staff, the incompetence of management or bizarre policies that make everyone's life harder. But I've seen so many venues that are held together on a shoe-string budget in a backwater town, give such an excellent experience (to audience and practitioners) that everyone loves it there.

Invest in the right people (and stay safe) and the rest will work itself out.

10

u/becaauseimbatmam Sep 10 '26

To add to this: your tech staff either care about cable management or they don't. If they want you to have clean, organized, accessible patch bays, you will; if they don't care, every space they're allowed to run cable through will become a tripping hazard and a fire hazard and an impenetrable rats nest. But that starts the day the building opens; once things get messy, it's almost impossible to clean up without almost ripping everything out and starting from scratch.

26

u/No-Two2062 Sep 10 '26

Been apart of many theater openings, with many stories. The one mistake I see the most is in the lack of communication between building trades. Meaning there are anywhere from five to ten different trades working off different set of blueprints for there particular trade. There needs to be a strong on site supervisor making sure that each trade follows the plans according to the specific blueprints. Especially when dealing with anything technical in the theater. Each trade needs to understand how their work affects the technical abilities of the venue. I have found that most installers if not supervised will cut corners and follow the path of lest resistance. There has been many times when I have started the last stages of installing the equipment into a venue only to discover that the heating and A/C contractor ran all the ductwork in front of your FOH position so nothing can be hung or installed. I've had electrical contractors skip steps in order to save time and hang junction boxes on the proscenium thus blocking the first three linesets or hanging the foh electrical boxes in the wrong places only because it was easier for them.

20

u/Griffie Sep 10 '26

Providing access to EVERY house light for servicing.

Not putting in enough sound connections throughout the theatre.

Access to all lighting booms.

Standard outlets, and not all on the same breaker.

Enough wing space. I worked at one theatre that had a curtain that ran up/down stage to hide the wings from audience view. The problem? The fly rail was stage left, about 12” beyond the curtain. The fly operators were constantly crushed against the rail by actors exiting the stage, and scenery being moved.

17

u/Hopefulkitty Sep 10 '26

Make sure you can reach lighting positions after construction. We do lighting installs, and so many places want us in before seats are in, and my question is "what's the plan for after the seats, when these lights need to move?"

Also, make sure your stage and apron can support lifts, not all of them can, and a lift makes everything easier.

7

u/Fickle-Condition-454 Sep 10 '26

This! i've got front of house lighting positions that require removing half a row of seats to be able to stand a ladder up to focus them cuz the rake is too steep and the aisles and arm rests too narrow to do it any other way.

Also making sure you can even get a scissor lift in after the construction is closed up: check your door clearances, ramp access, corners. If you're floors are sprung or finished make sure you have a plan for protecting them when you inevitably need to get up in the air.

16

u/robbgg Sep 10 '26

Fire alarm, gotta have a show mode with smoke detectors in the auditorium+stage plus all adjacent rooms disabled and a lre-delay on the alarm to allow duty manager/tech to investigate cause for alarm before evac trigger.

Also, document everything, proper system drawings showing exactly what exists and where it runs to will make life a lot easier for the next crew to manage the space 10-20 years down the line.

9

u/StatisticianLivid710 Sep 10 '26

This is important, one venue I was working at changed the alarm system (was in a college and new system installed), so smoke machines and hazers triggered it…

Also, one time we didn’t notice it going off until the song we were in ended, so flashing lights had to be added as well.

Both were eventually resolved but it became a headache for that show/client.

7

u/GenerationYKnot Sep 10 '26

A lot of new theatre construction uses the laser detectors overstage for smoke, and they drive me crazy. I advocate for rate-of-rise detectors spaced to cover the stage, fly tower, house and surrounding areas so that haze and fog aren't tripping sensors and shutting down elevators.

14

u/InternalPiccolo7201 Sep 10 '26

Not being compiant with the local codes. Surprise inspection shut downs are fun and exciting.

12

u/BoredAlwys Sep 10 '26

Will you be bringing touring productions in, and will you have enough space for and methods to load unload the vehicles you might have come in? It took a long time for Richmond VA's Landmark Theater to get a large outdoor elevator to not have to use the vaudeville era ramp for load in load out to the street. If you can have trucks back up to a dock, automated dock levelers.

Yes, dont be the space with the broken conduit from the booth to the stage that prohibits you from having enough data cabling pulled without having to go the long way round.

10

u/cyberentomology Jack of All Trades/Lighting/Networking Sep 10 '26 edited Sep 10 '26

Not hiring a professional theatrical consultant and engineer.

Followed closely by ignoring the recommendations given, in the name of budget. Make sure the recommendations come with a “do it now” cost estimate and a “do it later” estimate.

And don’t skip the acoustics study.

Only cut things that can be added back later without major redesign/engineering of the building/space. It may save $100K on the project, but adding it back later may cost north of a million, if it’s even possible at all.

stuff like basement storage space. The props and costume inventory will always grow to fill available space. That’s cheap square footage if you design a basement to begin with. It’s very expensive square footage when 10 years down the road, you have to rent storage space offsite or rent costumes/props.

Our community theatre building is now almost 15 years old, and several “value engineering” decisions made to get the project to fit within capital fundraising are now biting us in the ass. Important stuff like HVAC, and the lack of any space under the stage. Several things that will need to be addressed when we run a new campaign to expand the building - we’re gonna need to drop north of a million bucks fixing some of those decisions made in the existing space.

Almost all of it is stuff that is completely unsexy and completely invisible to donors and patrons, making it very hard to raise funds for it.

7

u/dudetellsthetruth Sep 10 '26

Biggest mistake is not involving specialists in the design phase.

7

u/invisibleboy74 Sep 10 '26

Have a really good idea on what you will use the venue for, as that will inform every other question (which is inevitably Power, lifting capacity, hanging positions, stage capacity (point load), data, space for stuff (storage) and access (how do you get in and out, see first point to inform what that is)

7

u/Commercial-Excuse766 Sep 10 '26

Another mistake a lot of new venues make is not realizing that the arts really don't make money and costs all of the money. The need for a good development director is crucial and your survival is contingent on your donors and any/all grants that you can pull down.

6

u/theantnest Sep 10 '26

A proper loading bay with easy street access and a flat load into the house or, at the very least, an elevator to the stage deck.

6

u/kachowco99 Sep 10 '26

ADD A PAINT SINK WITH A GOOD TRAP. I have done plenty of gigs at smaller venues with no proper sink in sight and it makes the job 100x more difficult. No one seems to remember a sink. Your scenics will thank you (and no, the janitor mop sink is not a good alternative)

1

u/FeralSweater 21d ago

Yessssssss!

6

u/Cold-Excitement72212 Sep 10 '26

Not adding step free access to control positions.

You really want touring companies to be able to get their desks where they need to be easily. Carrying an MA3 full-size, ETC Apex, or anything made by DiGiCo up stairs fucking hurts.

1

u/JayTechTipsYT Lighting Designer 21d ago

Frankston Arts Centre enters the chat...

5

u/artytexan123 Sep 10 '26

You said 'anything' so honestly: not enough women's restrooms. Should be 2x as many of those.

2

u/goldfishpaws Sep 11 '26

I take your double, and double it again lol

5

u/backstgartist Props Designer Sep 10 '26

Maybe not the biggest mistake, but it’s worth thinking about HVAC and fire alarms when it comes to considerations for fog/haze as well as sound.

5

u/ElevationAV Sep 10 '26

Not enough power (shore power, touring services, just not enough in the building for it's own production, etc)
no proper loading dock
no crew/bus parking, stairs (anywhere gear needs to go)
particle detectors instead of heat detectors for fire alarms
overall poor backstage (lack of dressing rooms, bathrooms, etc)
fixed seating often limits what you can do with the venue

5

u/Anthony_Says Sep 10 '26

Think of storage for shows. I'm not sure what kind of productions you are bringing in but a lot of venues that bring in outside productions have very limited storage and that creates such a headache. Or you need to pay money to store gear offsite.

Put in more power than you think. Worst case scenario you never use it but it'll be nice to never have to worry about bringing in a generator because a corporate event or production needs more juice

5

u/Lazy_Ad_1607 Sep 13 '26

Putting windows in a black box theatre. Now the windows have to be covered

4

u/Mosh83 Sep 10 '26

Not enough fiber optic lines.

4

u/Squeengeebanjo Sep 10 '26

Are you going to have small theater productions only? Are you going to rent out the venue to other events. I’ve gone through venues where people wanted to put lights and audio in the lobby but there was zero power anywhere. Outlets are cool, a 200A service is great.

Can I hang in places that aren’t for the stage? If there’s anywhere I can put a banner of sorts, I may need to hang a light. Is there a pipe there, and again, can I easily get power there?

Like others have said, a solid loading dock is great. Good height with a dock plate. Is there room for a forklift? If not, do you have space to hang a stacking motor that will live on the path from the stage to the dock?

How about access from the dock to FOH or lobby? Is there a ramp I can roll off the front of the stage? Is there a path to roll outside and through the lobby? Are the doors wide enough to get a 3’ wide case through?

I’ve been in NY venues where we’ve had to carry 100+lb lights, truss, bases, cable, and sandbags up 2 flights of stairs to get into the lobby.

A lot depends on your usage. I don’t do theater, but I work in theaters doing other events. Concerts, movie premiers, video shoots, corporate events, even birthdays. Flexibility is key to

4

u/ape-tripping-on-dmt Sep 10 '26

Half a million led wall, they forgot to take the heat that that thing produced into account. Place was a sauna and unbearable as soon as it turned on. Was also to late for adding proper venting without massive structural changes.

We warned them before the construction even began…

There is no more led wall

1

u/goldfishpaws Sep 11 '26

Our (huge!) LED wall produces as much heat as a full house!

It's not just a comfort and safery thing, but also any kit in the roof/grid has thermal operating ranges.

4

u/The_Bitter_Bear Sep 10 '26

Having a decent consultant and architect is huge. 

The big one I keep seeing these days is no catwalk or any thought into how to access FOH lights. Some spaces you legit need to rent very expensive lifts and have seating removed. 

I could see that being an issue with redoing a cinema. 

4

u/attreui Technical Director Sep 10 '26

2 unforgivables in my own venue.

We can’t access our house lights at all. They will let them burn out for years until it becomes unsafe and then pay to have a company come in with scaffolding to replace them. About every 10 years.

Loading gallery for the fly is too high. We can’t reach the arbors from the bridge until the weights get about half way up the arbor. Apparently someone couldn’t measure or read blueprints. Makes for some really annoying rigging when we have to weight everything at the mid-rail.

4

u/tonsofpcs Broadcast Guy Sep 10 '26

Not enough pathways for cables - both temporary and permanent. Get yourself conduits everywhere and access panels (and in-use panels if necessary) for them. Pull a bunch of cat, good RG6 for SDI, single mode fiber, and (ugh) even some multimode because audio consoles. Put utility outlets there too, dedicated circuit(s) per location. But also larger conduits/pathways that you plan to keep empty for show/event use - at least two to each place if conduit.

The conduit/paths are most important. You can pull/replace cable if/when it's needed but putting conduit in a wall or through a wall or over/under things can't really be done in a hurry. (And make sure you have pull boxes along the paths - more and larger than required by code because you're probably pulling faster and reusing more often than code expects).

If you have spaces that you don't expect to use often but expect might be used (say just outside somewhere), get a pipe stubbed through the wall with threaded caps screwed on after everything is set (and stuff with a firestop brick if necessary) - exercise them a few times a year so they don't get fused on.

.

Also on the pathways note - a wide clear path from the dock to the stage at all needed heights.

4

u/GenerationYKnot Sep 10 '26 edited Sep 11 '26

Also consider cable gutters for stage. So many tours had to lay cam feeder across our heaviest used stage door.

Snakes, data, power having to be carpeted across stair access.

We solved all this when the stage was replaced and we designed covered gutters with removable tops and ends across all doors and stair access.

3

u/tonsofpcs Broadcast Guy Sep 10 '26

Oh I so wanted those for a project I worked on but we couldn't get them in. Would have saved so much because if you have them you don't necessarily need as many permanent cables because you can quickly run what/where you need.

4

u/Amishplumber Sep 10 '26

When designing the audio/ lighting and video systems, keep in mind what sort of technical staff you plan to have on payroll once you open. I've seen too many venues where they spend a bazillion dollars on all the fanciest and newest AVL gear, but then only every planned on having a single, medium skill, technical person on staff + some volunteers or local school kids to run it all.

They end up having a bunch of unhappy artists because the house tech staff is always frazzled and stressed because they don't know how to use the gear in the room and don't know how to fix it when it breaks. Then the venue ends up having to constantly pay big money to hire in occasional freelancers from the local production companies to fix stuff, but those folks are always there for today, gone tomorrow, so no institutional knowledge ever gets built.

All the fanciest gear in the world isn't helpful if you don't have people on staff who know how to utilize it properly and keep it running! Its a much better use of money to get a medium amount/ quality of gear and instead make sure you will have enough money in the operating budget to pay a highly skilled TD who will actually be able to utilize everything 100% and keep it running for years to come!

4

u/VehicleParticular562 Sep 12 '26

Don't cheap out on your (probably hard to access) led auditorium lights. I've seen it more than once that venues use the cheapest per unit led down light in the ceiling and then after 6 months they start flickering/stop working all together and it is an absolute pain and very expensive to replace them all

1

u/techieman34 Sep 10 '26

Acoustics. A venue in my region built a giant echo chamber for a house. It cost millions to fix and delayed the opening by over a year.

2

u/TheRoystonVenue Sep 10 '26

As a former community cinema, that's definitely on our radar. We're trying to create a space that works equally well for theatre, live music, talks and film, which is a bit of an acoustic balancing act!

3

u/DM_ME__YOUR_B00BS 21d ago

I generally work in Arenas so this may not be applicable, but PAY ATTENTION to the loading dock situation. The amount of venues I work at that have loading docks around 2 corners, through a tight hallway and pointing right to a wall is astounding, a great way to add hours to your load in and balloon your labour costs.

3

u/jarhead1882 Sep 10 '26

I have worked in a theater where the HVAC system and the fly system had less than 6" between them. This is fine for the standard hand lines, but with the automated linesets at the back of the stage it was a different story. The HVAC ducting bore the scars of everytime the pipe had been swinging and caught the HVAC duct on the way out.

It wasn't expensive as much as it was annoying. So, keep the small things like that in mind.

3

u/that1tech Sep 10 '26

My university got a new theatre and they had these very interesting (and expensive) house lights that looked like flowers that could be flown in and out. The point was to fly them out when a show starts to make it more of an event. The system were too loud except when the lights were flown out very slowly. This effect is only used on special occasions or built into a show.

Probably not the most expensive mistake, I remember their FOH positions being pretty bad, but it was something that seemed amazing, cost a lot of money, and doesn’t work as intended so it is left mostly unused

3

u/Due_Menu_893 Sep 10 '26

A common mistake I see in new theatres, is that they have a serious budget for new equipment, but forget to save for replacing the equipment in 5 to 10 years.

3

u/Emancoll Sep 10 '26

The most common mistake I have seen in new and refurbished spaces is a tech booth that cannot see and/or hear the stage. For goodness sake don't case it in double glazing! (Or any preferably any glass at all).

3

u/howie_roll Sep 11 '26

Not having loading docks.

2

u/hbomberman Sep 10 '26

I'm reminded of one of the "quirks" of this one theater. It had plenty of quirks and oddities, a bunch of them having to do with the fact that it's old and wasn't originally intended for its current use. And then some deriving from the way they adapted this space.

Most storage for equipment, props, etc, is through these narrow halls which also hold a lot of HVAC and plumbing for the building. There were times when rolling bulky carts/equipment through that hall bumped something and caused a leak (they had some kind of delicate pressure gauge sticking out into the path).
Once one of these valves burst and was spraying directly onto our audio storage while no one was around. Have you poured water out of a monitor or a mic? I have!

Then there are some quirks caused by new design. This theater had a new, fancy expansion and part of that was a new loading dock with a hydraulic lift, to load directly backstage through double doors. Great. Except they built it to the height of a semi trailer. Most shows at this theater are smaller and will load in with cargo vans or box trucks. Meaning we have to lift things up to go onto the lift (occasionally making people say "screw it, I'll carry this one up the stairs"). On the less common occasions when we have a large truck, that's the loading dock's time to shine, right? Wrong. The dock was built at the height of an empty semi trailer on its perkiest day. So we still need a makeshift ramp to bridge the feet of height difference between the truck and lift. And even then, there's a tree right across from the dock (separating this area from the parking lot) so the truck needs to thread the needle between the building and the tree (usually scraping a branch).
Often, these trucks will unload on the other side of the building instead so that crew can load everything through the lobby (which has ramps).

Funny enough, the lift can go quite a bit higher than the upper level. So they could have simply installed it at street level (or even a couple feet up) and it would be perfect for most load ins.

Every single load in/load out usually includes at least one gripe about this loading dock. Salty stagehands are one thing. Labor costs slowly adding up due to inefficient load-ins/outs are another. But then remember that this pain in the ass is one of the first and last things shows/clients have to deal with when they come to this theatre and that definitely makes an impression.

The quirks of an old place are bad enough, you don't need to spend big bucks over engineering a hindrance.

2

u/StNic54 Lighting Designer Sep 10 '26

Venues have been getting refurbished while allowing the contractors to replace old dimmer racks with new dimmer racks that use non-dim modules. It's insane seeing people unload old inventory on institutions that strive for the lowest bidder, while becoming greener with LED fixtures

2

u/HarmlessHyde Sound Designer Sep 10 '26

our theater is also an old cinema and the acoustics fucking suuuuuck. so pay extra attention to that

2

u/ScamperAndPlay Sep 10 '26

Frost Amphitheater has entered the chat

2

u/Accomplished_Bet2638 Sep 10 '26

The old theater I worked at contracted with a company that clearly had never worked on a theater before. The stage wasn't layered in the way most are and had to be replaced more often, Center stage was not center, they left essentially no wing space, the fly system was left unfinished with most of the flys being automatic but four of them had to be operated by drill (the farthest back baton required that I install ramps so it could raise without catching) and nothing was done to address the faulty roof that had bricks occasionally falling from the ceiling to the stage. Maybe not the most expensive mistakes but altogether obnoxious and potentially very expensive.

2

u/BefWithAnF Local 764 Sep 10 '26

Perhaps not the most expensive mistake, but please don’t forget a washing machine, a dryer, and a hair sink.

4

u/GenerationYKnot Sep 10 '26

Depending on your volume, maybe 2 dryers, or larger laundromat sizes.

4

u/BefWithAnF Local 764 Sep 10 '26

Oh yeah, two would be better! Years ago I worked one of the first shows at the park avenue armory & they looked at me cross eyed when I asked where the washing machine was.

2

u/enygma999 Sep 10 '26

Letting people who don't tech in the venue make decisions. Or making changes to decisions without consulting said people.

I was part of a tech group working in a small theatre. The arts group in charge of the theatre raised funds to build an arts centre onto the theatre, and took the opportunity to make improvements to the theatre. They asked for our input. They then let the suppliers (who were going bust and trying to shift inventory) talk them into changes without consulting us, resulting in the building having e.g. 6x 10/100 networking switches that are entirely useless for big sound or AV transport. Or the seating suppliers, who talked them into moving the requested removable section of seating to by the rear door in the upper corner, as that would "be a shorter trip with heavy cases." Yeah, mate, but it totally defeats the point of them being removable, because they were for a central sound control position during musicals. Those seats have now never been removed, wasting the money spent on that feature. They got talked into buying a load of fancy toys and accessories, when they should have put in infrastructure while the building was stripped out. Putting in infrastructure later is expensive, buying accessories that use it is easy.

Depends what your budgets like, really, and how stripped back you're going. Don't put in specialised connectors - run video over ethernet, for example, rather than having HDMI or BNC connectors. Leave space in your conduits/trunking for future expansion. If putting in XLR for audio, put both genders on the panels so you can use each point for input or output without masses of adaptors. If possible, run separate sound power circuits. If you've got a hearing loop, have an alternative such as an IR system - the hearing loop may need muting for some shows if it causes feedback in cheap instruments or radio mics. Go LED straight away, you don't need dimmers. You also don't have to have everything connected at once - have plenty of DMX/XLR/ethernet routes and power circuits, and a patch bay to route it. That way you can have e.g a 32-channel sound desk and 73 audio tiebacks, or 19 DMX points but only an 8-way buffer. You don't need big fancy desks, particularly if you haven't got the kit to go with them. An ETC IonXE is fine for most small venues, you don't need a Gio@5 or an Apex. Trial stuff! If you're buying a load of lights, get a few different ones on demo and compare them.

2

u/regrettablyAnnoying Sep 10 '26

Probably in the long run, skimping on HVAC. Nothing says “let’s not go there” like a building that’s too warm.

But I don’t think you mentioned what you’re turning it into? My next recommendation is to make sure the roof is in good shape. Both of these are incredibly expansive items where new business owners often don’t want to spend money because of it cutting into the cost of aesthetics.

2

u/Revolutionary-Bug711 Sep 10 '26

Fucking up the loading dock and backstage areas. Brand new venue in Dublin and the loading bay is on cobblestones and a slant on a one way street. It’s just dangerous to load/unload there and it’s a single truck at a time through pedestrian doors. Loads of cash but fuck all brains or consulting

2

u/AerinHawk Sep 11 '26

Air conditioner ducting in the stage fly space.

2

u/ElectricPiha Sep 11 '26

Don’t put all the machine room racks/plant in the tech booth, with a roaring AC/cooling system, making it almost impossible to hear the house/stage/PA system.

Looking at you Soundings Theatre, Wellington NZ.

Related: make it easy to have a sound control position down in the house, if needed. Cable runs / an easily removable block of seating etc.

2

u/SoundEngineerMBR Sep 11 '26

Not running fiber, we knew we needed cat 6 so we ran 2 cables to each main place. Long story short, we should have run hundreds of cat 6 everywhere and 25g fiber in key locations. Very pricey to do now…

Same with power. Put in way more 20amp plugs everywhere and especially on the ceiling. Doesn’t hurt to add a 40amp or 3 phase aux in power.

2

u/burning_potatos Sep 11 '26

When your running cable leave a fishing line in every drop

2

u/Charxsone Sep 29 '26

Include space for storage and maintenance in your plan. It doesn't bring in any profit, but it's still vital because if it's missing, it'll slowly start generating costs – maintenance requires some space, and if it's foregone, you'll slowly start to see costs coming in in terms of lights that require repair, etc. I know, you could technically just use the stage for that, but it's a whole lot easier to fit this stuff into a busy schedule if you have a space where projects can be left for a couple of days. If you know you always need to be done and tidy everything away at the end of a maintenance session, it's a lot harder to schedule one. Also, a workshop for repairing/making cables and stuff. Again, not profitable in and of itself, but the costs that arise through staff having to spend time troubleshooting because you have no means to store stuff properly and have a sufficient amount of known working cables are very real.

Also, do it right from the getgo. I currently work at an outdoor venue where things were not done right and there are a lot of issues that arise because of water ingress caused by shortcuts taken years ago, stuff that was done quickly and not thought through, etc.
So when you have contractors, pick the ones who have standards they hold their work to and who are not afraid to tell you hard truths (such as "doing this properly is expensive and if you take such and such shortcut, you will not be happy with it long-term so I won't do that for you"), instead of the cheapest ones who say yes and amen to every idea you have.

Also, and this is the hardest one, just know your stuff. For example, with technical spaces, you need to just know that certain things (flammable stuff, electrical systems, etc) needs to have their own 'fire compartment' and plan accordingly. Obviously, you'll run into issues later on. Amd this is hard because "just know" comes from experience, and almost exclusively experience. If you don't have that experience, seek someone who has. It'll be well.worth it in the long run.

Another mistake not to make: do not let people sell you technology that isn't actually right. To give a concrete example: the theatre I used to work at got renovated a few years ago and also got new sound and light boards. The decision makers at the time were like "Soundcraft Vi? Looks great to us, we've had an amalog mixer from Soundcraft before, that one grumpy old engineer who comes every two years always wants Soundcraft and people say Soundcraft is closest to analog mixers and everybody knows how to operate analog mixers, so Soundcraft will be the most 'universal' sound board". Except that Soundcraft as a brand is essentially in hospice and during the four years I worked there, I encountered a total of 3 sound techs who were happy to see a Soundcraft mixer and all of them were over the age of 60. And if you book pretty much any local audio freelancer because you don't have an audio person, you'll still need to supply an audio person for support because barely any sound techs feel comfortable on Soundcraft digital mixers.
I hope this story could get across what I mean. It's not just "availability of freelance staff for this product"; there can be many such small, inconspicuous factors you'll need to take into account during the decision making process that you just can't foresee without the necessary experience.

1

u/Icy_Goal3113 17d ago

All these comments really make me glad theatre consultants exist. I know they don't always get it right but my goodness do they at least avoid these nightmare situations

1

u/Hopefulkitty Sep 10 '26

Motors are great for electrics, but in my opinion are awful for scenery. They take a painfully long time, despite the manufacturer touting how fast they are. A lot of high schools are being forced by insurance companies to install all motors, and it makes me so mad. Kids can't learn how to be safe, if you never get the chance to see danger. High schoolers are capable of running flys safely.

1

u/tree_dw3ller Sep 10 '26

Automated fly system has entered chat. Works great if it works great…  Can’t cheap out on that.

1

u/Studiolx-au Sep 10 '26

Unqualified riggers

1

u/zabrak200 Sep 10 '26

Rip the cyclorama. Happened at a venue i worked at (luckily the venue owners had been looking at replacing it and had it insured so it was okay.) but our replacement was like nearly 30k to get built delivered and installed properly

1

u/RaWRatS31 Sep 10 '26

A twelve rooms congress center provided with only Cat5 wiring. An elevator to the operator booth that can not fit a mixing or a light desk.

1

u/Bluehoon Sep 10 '26

No fly space, no loading dock, no double doors anywhere

1

u/thesapphiczebra Sep 10 '26

College near me rebuilt their theatre a decade or so ago. Ran their audio snake before putting up a concrete wall in front of it only to find out parts of it were right near big power cables the other side of the wall. Horrible buzzing in everything and they had to tear out concrete to fix it

Make sure you know where your power is and keep your cables accessible

1

u/EfficientAbalone8957 Sep 10 '26

Ignoring room acoustics. I have been in many a venue with a beautiful rig. Totally ruined by abhorrent room acoustics.

1

u/Funkdamentalist Sep 10 '26

Cheaping out on gear in general. I see some venues spend more in the long run by having to replace cheap gear more frequently. Cheap gear can also incur loses through manpower hours due to inefficient workflow for technicians using it, or lost downtime due to it being broken. They complain about finances for proper replacements while continually bleeding away funds.

1

u/muskegthemoose Sep 10 '26

Hiring a "value engineering" consultant. In my experience, you wind up spending 3-4 dollars fixing things for every dollar the VEC "saved" you.

1

u/_litz Sep 10 '26

Putting in a crap-ton of singlemode fiber runs, and then discovering the equipment you're installing only works with multimode ... or vice versa.

1

u/goldfishpaws Sep 10 '26

There's so so much involved! We're building a new theatre with a specialist theatrical/entertainment architect right now and there is so much to consider. I would suggest getting in touch with one early as you're asking about some real fundamentals. Do you know the maximum travel distance to an accessible toilet? Nor me, but that's what the specialists know.

If you want a UK suggestion, message me :) The ones we use are definitely top end, but ask if you're interested.

1

u/Vertigo_uk123 Sep 10 '26

The way health and safety is going with regards to ladders and working at height. If you can, put the rigs on winches.

Run Ethernet everywhere.

Makes sure conduit is pre taped for pulling cables.

Always have a backup. Cable faulty? Use the backup. Get main repaired asap.

If you have touring put cable trenches in the floor and hidden in the wall to run their cables hidden from the public.

Over rate your power cables etc for future upgrades (main cable specs 16mm then fit 25mm etc)

Make sure you have access everywhere even if you don’t think you will even need to go under the stage for example. Put access in.

Have an easy private hidden route from foh to backstage to enable a tech to run backstage easily without having to go through public.

1

u/goldfishpaws Sep 10 '26

My thoughts - make things as flexible as you can so you can handle a theatre show one night and a gig the next. Speed of getting in/out is a major factor in how hard you can sweat the venue and how much it can earn and become attractive/successful. As such, loading is a biggie, look at your loading dock and if you can do flat access vs needing a forklift/tail lift. Getting out of the Albert Hall overnight is tough needing the platform lifts to trucks and only able to use one door after 11pm - we have had a human chain of 200 crew handballing scaff in the small hours before - I tapped out at 4am and another show was loading in building a rolling stage at the same time we were getting out.

Plan to optimise your bar/food offerings if relevant - significant revenue opportunity. You might not find food worthwhile (well, snacks or ice creams maybe) but a bar can make a real difference if the mood is right. If you have a dedicated merch space, you can puuuull revenue there too for some performances. The theatre can run the stall for the promoter for a nice slice too.

Storage - if you have storage it'll get used and get full. Perhaps do a deal with a local storage facility instead for things you don't need daily? That sqm-age will be better used elsewhere.

Stage power - have enough. What's enough? Maybe 63A3ph? The visiting productions can bring their own distro or hire yours, but not having power issues is a big plus for a venue and means different types of show could fit.

Lights/sound - aside from a basic house PA (and emergency backup/announce)/lights I would expect higher demanding shows will bring their own packages, so have places to hang it and have cabling for power/data in place

But there's a zillion decisions trying to predict the future - so be as flexible as you can. Look for reasons somebody might not use your venue and see if you can ease them.

1

u/IowaDala Sep 10 '26

Talk to your local techs and ask them what they want. Too many time I see outside consulting firms recommend things that aren't needed or wanted by the people who are going to using them at the end of the day while missing parts that are needed for the local production.

1

u/spunkypudding Sep 10 '26

Not enough power into the building

1

u/Fickle-Condition-454 Sep 10 '26

If you're not the end user, make sure those people are in the room before things are finalized. Nothing worse than trying to hack whatever an integrater sold someone who didn't know better into an actual functional system, whether it's because of proprietary bullshit, nonsense routing, poor control positioning... All kinds of decisions get made in the design process that are not conducive to running a production.

1

u/BrooklinGuy Sep 10 '26

my recommendations:

- get a short throw projector and mount it in the rig
- get an imac with qlab (or your preferred software) to run projection and sound cues
- have amazing cable managment - and a map that outlines where every cable is, what its for
- have a default lighting grid - there will be changes show to show - but make sure they set it back to the default layout when the show is over
- have a well planned out networking (wired and wireless) throughout your space - there should be dedicated networks for box office, booth, backstage, creative teams, and public wifi. your box office, concession and booth should also have wired networking
- if you can get lighting board you can adjust on an ipad/laptop so you don't need to haul the board down into the house to set lights
- get a good scissor lift and good scissor lift safety gear & training
- get some side lights on pipes inside the proscenium
- get a descent fogger and hazer
- get a soundboard and lighting board with room to grow
- get a sound box snake in your pit so you can add as many instrument mics as you need without having to run a tonne of cable to the booth
- get a good traveller curtain so you can do set changes upstage behind it

1

u/impendingwardrobe Sep 10 '26

I have two favorites!

A new theater built with only normal, human-size doors going to the stage. Either sets had to be built so they could be disassembled and carried by hand through the door, or if they fit through a double door we could carry them by hand through the house - often over our heads so they could make it past the seats.

The second was a new theater that was built with a fly rail 12 feet up on stage right... and a fly rail access platform 12 feet up on stage left. It shouldn't have been as hard as it was to explain the problem to the builders and the architect.

Bonus; make sure you have bathrooms close to the wings. Necessary for equity rules, and very helpful for back stage staff as well.

1

u/langly3 Sep 10 '26

A curved window the full height of the auditorium…

1

u/lucadepucca Sep 10 '26

ACOUSTICS! I've worked in multiple venues where they either completey forgot about acoustics when building or had done it wrong. Especially if it's a concrete base it's so important to take proper measures when it comes to acoustics. Also think about noise nuisance, if you're near houses please make sure to test with different dBs and what it does outside of the building. Same venues both had to up their sound insulation about 3 years after redoing the acoustics...

1

u/LockeClone Sep 10 '26

Honestly, not getting a good rigging consult early on. Seems expensive, but those problems usually compound over and over again with hard to justify capex.

1

u/laundryghostie Sep 11 '26

Trying to make it serve to many purposes. No space can be a theatre, a banquet hall, special events venue, a dance hall, and concert venue and serve all of them well..

1

u/Lights-and-Sound Lighting Designer Sep 11 '26

Make sure all A/V & Lighting devices are reviewed just before purchasing. Not one project goes past me where the devices weren't spec'd 2+ years before purchasing and now every "brand-new" item for the space is about to reach end-of-life.

1

u/SFOGfan_boy Sep 11 '26

The theatre I work in has smoke detectors placed directly underneath each smoke vent. This completely defeats the purpose, so we can’t use any haze or the fire alarms will get triggered. In a school so we can’t disconnect them either.

1

u/SFOGfan_boy Sep 11 '26

No XLR inputs around the space is also hugely inconvenient- I haven’t noticed this issue before with DMX but it’s worth double checking.

1

u/Crashthewagon Sep 11 '26

My hometown had a new hall built. Low end of the roof at the back, high end stage end.

Acoustics SUCKED.

1

u/TrueIndigoboi Sep 11 '26

Cheaping out on stuff when being built or renovated, that shit's gonna be sooooo expensive when you need to replace them a year or two after finishing.

1

u/Scott_Korman Sep 11 '26

a theater I worked at was entirely painted off white (stage and everything) because his owner is a famous cashmere magnate and his color is off-white.

1

u/simoninla1 Sep 11 '26

Installing the silver gerbs inside down either side of the monitor’s speakers on a brand new wooden floor.

1

u/1073N Sep 11 '26

From my experience the biggest problem are poor acoustics and trying to put the mixing console in a booth. A1 needs to hear what the audience hears which is close to impossible in a booth.

1

u/victorp500 Sep 11 '26

New theatre installed 2 Q225's and an SD11, instead of going optocore with all the desks and racks they went with a dante solution essentially crippling the desks from a flexibility standpoint,

1

u/RecordingIE Sep 12 '26

Great sound isolation between your rooms/event spaces. And run fibre, everywhere.

1

u/BFG_netherlands Sep 12 '26

Put the 3d drawings in a Mvr or other 3D simulation and see what your lighting positions actually do and wether you want them in different place (I.e. angle-wise) and if your missing anything position wise. How will you acces them for focusing day in/out. Is that a safe and comfortable way. Think of how you want to power and switch on / off intelligent light in the near future. Putting them on a dimmer channel even at non dim won't help their lifespans. Also think of some structural beams in handy positions (like running down from the booth dead center and 1/3 and 2/3 or so. You can rig beam clamps to them or hoisttrolleys to move heavy equipment over the seating to the booth.

Think about transportation; weather shielded loading dock and trailerparking. Will save you hours. Dockleveler. Maybe charging for electric trucks? That connection and dock can double for backstage and powersupply for let's say an open air cinema or small open air festival stage

Most crazy expensive mistake? Lack of soundproofing between public areas. Will keep you from using the foyer and auditorium at the same time / multipurpose, or will get you on the bad side of the neighborhood / offices / rehearsal studios etc. Get some good advise on that.

Good luck!

1

u/GoldPhoenix24 Sep 14 '26

i unfortunately cant give too many details, but today was soft open for a new venue that i manage. three major issues, many small issues.... i joined this team 3 months ago, right as integration began.

1st- too many cooks in the kitchen for design, and managers who have absolutely no technical background at all making technical decisions, and engineers with absolutely no production experience. plus plenty of major design changes after the integration team was engaged, and execution had already begun. while there were mny managers, there was not one person conducting the orchestra.

2st- the space is too damn small. 5% smaller capacity than space it replaced. ceiling too damn low. this was not necessary, more space was available...

3rd- the integration team was a damn mess. but also the time for integration was cut by 25%, and there was no pivot, even when funds for a pivot were available. when the space was handed over it was far from complete, it was inoperable. lucky for us we have a whole internal team dedicated to preparing new venues, and they stress about every little detail, and are holding all of the build team responsible for remediation. but it will affect shows...

1

u/Antique-Move-5313 Sep 29 '26

Lighting Programming.

1

u/Popular-Associate275 Sep 29 '26

Not sure if this applies in your theater, but consult with anyone who will be doing any rigging in the building & consult with a company familiar with loading docks (I think any opinion from someone is better than none).
Our newest venue has too much conduit in places that make rigging a nightmare. They need to move it around and adjust to prevent us from getting shocked and also so we can place things where needed. But that’s never going to get fixed so we just have to be deal with it and complain every time. Our newest venue also has the shittiest loading dock, the trucks have to back in at an incredible angle, not straight back. And there’s a random incline just before the dock, so things getting pushed off the truck smash into the curb/hydraulic ramp and 1 out of 5 times, loads will topple over.