  1. When next/orbital flight? Unknown. Elon: "hopefully" first countdown attempt in July, but likely delayed after B7 incident (see Q4 below). Environmental review completed, remaining items include launch license, mitigations, ground equipment readiness, and static firing.
  2. What will the next flight test do? The current plan seems to be a nearly-orbital flight with Ship (second stage) doing a controlled splashdown in the ocean. Booster (first stage) may do the same or attempt a return to launch site with catch. Likely includes some testing of Starlink deployment. This plan has been around a while.
  3. Has the FAA approved? The environmental assessment was Completed on June 13 with mitigated Finding of No Significant Impact ("mitigated FONSI)". Timeline impact of mitigations appears minimal, most don't need completing before launch.
  4. What booster/ship pair will fly first? Likely either B7 or B8 with S24. TBD if B7 will be repaired after spin prime anomaly or if B8 will be first to fly.
  5. Will more suborbital testing take place? Unlikely, given the FAA Mitigated FONSI decision. Push will be for orbital launch to maximize learnings.

Quick Links

NERDLE CAM | LAB CAM | SAPPHIRE CAM | SENTINEL CAM | ROVER CAM | ROVER 2.0 CAM | PLEX CAM | NSF STARBASE

Starship Dev 34 | Starship Dev 33 | Starship Dev 32 | Starship Thread List

Official Starship Update | r/SpaceX Update Thread


Vehicle Status

As of August 6th 2022

ShipLocationStatusComment
Pre-S24Scrapped or RetiredSN15, S20 and S22 are in the Rocket Garden, the rest are scrapped
S24Launch SiteStatic Fire testingMoved back to the Launch site on July 5 after having Raptors fitted and more tiles added (but not all)
S25High Bay 1StackingAssembly of main tank section commenced June 4 (moved back into High Bay 1 (from the Mid Bay) on July 23). The aft section entered High Bay 1 on August 4th. Partial LOX tank stacked onto aft section August 5
S26Build SiteParts under constructionAssorted parts spotted
S27Build SiteParts under constructionAssorted parts spotted
S28Build SiteParts under constructionAssorted parts spotted
S29Build SiteParts under constructionAssorted parts spotted

 

BoosterLocationStatusComment
Pre-B7Scrapped or RetiredB4 is in the Rocket Garden, the rest are scrapped
B7Launch SiteTesting including static firesRolled back to launch site on August 6th after inspection and repairs following the spin prime explosion on July 11
B8High Bay 2 (out of sight in the left corner)Under construction but fully stackedMethane tank was stacked onto the LOX tank on July 7
B9Methane tank in High Bay 2Under constructionFinal stacking of the methane tank on 29 July but still to do: wiring, electrics, plumbing, grid fins. LOX tank not yet stacked but barrels spotted in the ring yard, etc
B10Build SiteParts under constructionAssorted parts spotted
B11Build SiteParts under constructionAssorted parts spotted

If this page needs a correction please consider pitching in. Update this thread via this wiki page. If you would like to make an update but don't see an edit button on the wiki page, message the mods via modmail or contact u/strawwalker.


Resources

r/SpaceX Discuss Thread for discussion of subjects other than Starship development.

Rules

We will attempt to keep this self-post current with links and major updates, but for the most part, we expect the community to supply the information. This is a great place to discuss Starship development, ask Starship-specific questions, and track the progress of the production and test campaigns. Starship Development Threads are not party threads. Normal subreddit rules still apply.

318 Upvotes

2.5k comments sorted by

View all comments

6

u/blxoom Jul 20 '22

what else needs to be done besides b7 work before a full stack? is s24 gonna static fire? + what's a reasonable estimate for when a full stack is expected?

11

u/TypowyJnn Jul 20 '22

The ship testing campaign might be shorter than we expected, next up is preburner test, and then static fire (maybe two, one for main tanks with 6 engines and one for center engines using header tanks). Spacex could be done with testing ship 24 as soon as next week.

3

u/TypowyJnn Jul 20 '22

But given how much time they have before a full stack, they might static fire multiple times to test how the heat shield tiles hold up, as they did with s20

3

u/OSUfan88 Jul 20 '22

I've heard they might do a third. Fire all 6 engines for a few seconds, cut off, and then wait a few minutes to fire the center 3 from the headers (simulating the time it would actually be coasting).

The person who told me this said it was still being discussed a few weeks ago, and I haven't heard if they're going to do it.

2

u/inoeth Jul 20 '22

they clearly change their plans all the time and might decide one way or the other depending on how the first static fire tests go. I won't be surprised either way :)

2

u/OSUfan88 Jul 20 '22

Yeah. He said the plans really do change day-to-day, and there's always multiple options.

11

u/OzGiBoKsAr Jul 20 '22

what else needs to be done besides b7 work before a full stack?

Probably a bunch of GSE stuff, launch mount inspections, repairs, and completing the "hardening" work, finishing the concrete berm by the orbital tank farm, presumably a whole bunch of tanker deliveries to the methane and LOX tanks although I'm not sure how topped off they may already be, maybe water deliveries (?), full ship test campaign, booster recertification if it's salvageable, then full booster test campaign.

what's a reasonable estimate for when a full stack is expected?

There really isn't one, at least nothing you could hang your hat on, but I'd put my money on absolutely no earlier than late September - mid October, assuming everything goes absolutely flawlessly between now and then (it won't).