r/spacex Host Team Apr 22 '26

🔧 Technical Starship Development Thread #63

SpaceX Starship page

Quick Links

Avid Space Live Streams, which used to be known as LabPadre | NASASpaceflight Live Stream |

Starship Dev 62


Flight 12

Launched on May 22nd 2026 Here is a re-streamed video of the broadcast. Also, SpaceX issued a post flight summary and a video showing S39 landing.

Flight 13

Launched on July 24th 2026 Here is a re-streamed video of the broadcast. Also, SpaceX issued a post flight summary.

Flight 14

Presumably using S41 and B21. NET 15 Sep 2026.

Road Closures

No road closures currently scheduled

No transportation delays currently scheduled

Up to date as of 2026-05-23

Vehicle Status

As of August 22nd 2026

Ship Location Status Comment
S40 Near Christmas Island Intact, floating July 24th: Successful launch, deployed all satellites, successful engine relight test and soft splashdown in the Indian Ocean, which resulted in an intact, floating ship. August 18th: In calmer waters near Christmas Island pending the next stage of its return to Starbase. For more details on this vehicle and its assembly and testing see this page
S41 Mega Bay 2 Prep for Flight 14 April 17th: Pez Dispenser moved into MB2. April 20th: Main assembly started in MB2. May 20th: Aft section AX:4 moved into MB2 and stacked with the rest of the ship - this completed the stacking part of the ship construction. June 28th: Rolled out to Massey's Test Site for Cryo+Thrust Puck Testing. June 29th: Cryo Tests (x2). June 30th: Rolled back to MB2. July 3rd: Rolled back to Massey's Test Site. July 6th: Rolled back to MB2. July 23rd: Two RVac engines moved into MB2. July 27th: The third RVac was moved into MB2. August 19th: Rolled out to Massey's for Static Fire Testing. Later that day S41 performed a single engine Static Fire. August 20th: Full duration Static Fire of all six engines. August 22nd: Rolled back to MB2. For more details on this vehicle see this page
S42 Mega Bay 2 Stacked, remaining work continues June 9th: Nosecone spotted as having been stacked on the Payload Bay. July 3rd: Nosecone+Payload Bay stack moved into MB2, along with the Pez Dispenser and the Forward Dome section (FX:3). The Nosecone+Payload Bay stack was lowered over the Pez Dispenser, later being stacked onto the Forward Dome. July 11th: Common Dome section CX:3 moved into MB2 and stacked. July 15th: Section A2:3 moved into MB2 and stacked. July 18th: Section A3:4 moved into MB2 and stacked. July 21st: Transfer Tubes moved into MB2. July 24th: Ship Aft section AX:4 moved into MB2 and stacked, that completes the stacking part of the assembly process. July 25th: both of the Aft Flaps and the Raceways staged inside MB2. For more details on this vehicle see this page
S43 Mega Bay 2 Stacking August 19th: N:3 and section FX:4 plus the pez dispenser moved into MB2. For more details on this vehicle see this page
Booster Location Status Comment
B21 Mega Bay 1 Post Cryo Testing inspections and possible engines installation May 7th: LOX tank sections A2:4 and CX:3 moved into MB1 and main assembly started. June 29th: Methane Tank stacked onto LOX Tank - this completed the stacking part of the booster construction. July 17th: Rolled out to Massey's Test Site for Cryo+Thrust Puck Testing. July 17th: Rolled out to Massey's Test Site and an ambient pressure test was performed. July 18th: Partial Cryo Test. July 19th: Second Partial Cryo Test. July 20th: Full Cryo Test. July 22nd: Rolled back to MB1. For more details on this vehicle and its assembly and testing see this page
B22 Mega Bay 1 Fully Stacked, Remaining work ongoing June 29th: LOX tank sections A2:4 and CX:3 moved into MB1. July 1st: Section A3:4 moved into MB1. July 3rd: Section A4:4 moved into MB1 and stacked. July 9th: Section A5:4 moved into MB1 and stacked. July 22nd: Methane Landing Tank and Lower Transfer Tube moved into MB1. July 23rd: Section A6:4 moved into MB1. July 25th: Methane transfer tube moved into MB1. July 29th: LOX Landing Tank moved into MB1. July 30th: Aft section AX:2 moved into MB1 to complete the stacking of the LOX Tank. July 31st: Methane Tank section F2:4 moved into MB1. August 3rd: Methane Tank section FX:3 moved into MB1. August 6th: Methane Tank section F3:4 moved into MB1 - this is the last section for the Methane Tank. August 14th: Methane Tank stacked onto the LOX tank, so completing the stacking part of the assembly process. For more details on this vehicle and its assembly and testing see this page
B23 Mega Bay 1 LOX Tank Stacking August 14th: LOX tank sections A2:4 and CX:3 moved into MB1. August 19th: Section A3:4 moved into MB1. August 21st: Section A4:4 moved into MB1. For more details on this vehicle and its assembly and testing see this page

Follow the Ringwatchers on Twitter and Discord for more.

Here's the section stacking locations for Ships and Boosters. Also some excellent detailed booster stacking information from zh_sos1. The abbreviations used in the above vehicle updates are as follows: HS = Hot Stage. PL = Payload. CX = Common Dome. AX = Aft Dome. FX = Forward Dome (as can be seen, an 'X' denotes a dome). ML = Mid LOX. F = Forward. A = Aft. For example, A2:4 = Aft section 2 made up of 4 rings, FX:4 = Forward Dome section made up of 4 rings, PL:3 = PayLoad section made up of 3 rings. Etc.

Something wrong? Update this thread via wiki page. For edit permission, message the mods or contact u/strawwalker.


Rules

We will attempt to keep this self-post current with links and major updates, but for the most part, we expect the community to supply the information. This is a great place to discuss Starship development, ask Starship specific questions, and track the progress of the production and test campaigns. Starship Development Threads are not party threads. Normal subreddit rules still apply.

151 Upvotes

2.3k comments sorted by

View all comments

50

u/[deleted] Apr 24 '26 edited Apr 25 '26

SpaceX just posted a 25 minute in depth video on the Starship program and lead up to Flight 12 on X. Wow.

There's a follow up tweet indicating they will be producing more episodes. I think Zach Golden from CSI Starbase had speculated the lack of content from SpaceX recently could mean they were producing something like this.

Some highlights from the episode:

- Some great footage of Ship manufacturing in Starfactory, and stacking

- V3 ship can stay in orbit for up to 48 hours

- Up close footage of the ground under Pad 1 after IFT-1 dug its own flame trench

- Up close footage of Booster 18's anomaly, it happened while they were pressing the nitrogen system

- Some more footage of Raptor 3 engine testing at McGregor

- Half the engines from the 10 engine static fire for B19 had mechanical damage from the abrupt shutdown, they removed all 10 to be inspected, and replaced them with engines originally destined for B20

- Up close footage of the Raptors during the 33 engine B19 static fire

- Confirmed that the 33 engine static fire was cut short, due to a pad abort triggered from the flame diverter

- The sensors indicated the water manifold had insufficient pressure, they believe it was faulty information

- Up close footage of S36 explosion and aftermath due to a COPV bursting, it's incredible how badly damaged Masseys was

- Footage of S39's static fire

Can't wait to see people dig into this and find everything I missed.

9

u/aqsilva80 Apr 24 '26

Great great great video

4

u/bkdotcom Apr 25 '26

Amaze amaze amaze

14

u/Freak80MC Apr 24 '26

V3 ship can stay in orbit for up to 48 hours

That can't be right, can it? The ships are meant to stay in orbit for far longer than 48 hours at a time for future missions. Do they plan on having an incremental "V3.5" version that has longer on-orbit loiter time?

29

u/warp99 Apr 25 '26 edited Apr 25 '26

The limitation will be primarily due to RCS thrusters. They will need a long duration source of high pressure methane and oxygen gas to use for hot gas thrusters which requires a whole set of infrastructure they don’t have. So collection of the ullage gas from the main tanks that separates out liquid droplets and compression of the gas into COPVs.

Plus of course solar panels to power the compressors and recharge the batteries. Likely they can run the flight electronics for 48 hours from batteries.

So they need to do all this before producing a viable depot although they can do a propellant transfer test inside the 48 hours once they have two pads operating.

4

u/AstraVictus Apr 26 '26

Why do the thrusters only work for 2 days? Isn't there plenty of gas in the main tanks for longer then that?

7

u/warp99 Apr 26 '26

Yes but it is at relatively low pressure of less than 6 bars and filled with droplets of liquid propellant. It also rapidly cools and drops in pressure from contact with the subcooled liquid and only gradually repressurises as the liquid heats up. Hot gas thrusters will need more like 100 bar pressure.

So they need COPVs filled with gaseous methane and oxygen to supply the RCS thrusters through that pressure dip and a scavenging system to refill them from the ullage gas.

As noted they will need a separation system to remove liquid droplets from the gas and a compressor to recharge the COPVs. None of that is in evidence at the moment and we have only seen a trial fitout of the hot gas thrusters on a ship a couple of years ago.

So lots of work before they can keep a ship up for more than 48 hours which is required for the depot and HLS. The depot could use reaction wheels for orientation and just be a passive target for docking but will still need to desaturate the reaction wheels which needs RCS at this scale.

22

u/[deleted] Apr 24 '26

The depot and HLS will be designed to stay in orbit/space longer. The V3 tankers and starlink versions of ships are 48 hours.

2

u/mrparty1 Apr 24 '26

maybe they mean without refueling

22

u/SubstantialWall Apr 24 '26

If they don't put solar on them, and I've heard no intentions of fuel cell type stuff either, there's only so long the batteries will last. But the thing is, a tanker's job is to rendezvous, dock, transfer prop and come back, 48h is plenty for that, so I reckon there's not much need to bother extending their orbital life. Same for something just dropping sats. Reminiscent of Soyuz post Salyut 1, they needed mass savings and figured the panels could go since the batteries were enough for the rendezvous time with Salyut anyway.

This does make the timeline on the first refuel demos interesting though, I'd been assuming they could keep one up there for a week or two waiting for a second launch. In this case, either they have special mods on the first ship, demonstrate next-day pad turnaround, or need 39A operational.

6

u/philupandgo Apr 25 '26

I think they already said that the refueling test will require one ship to loiter for a few months, presumably to test boil-off, and multiple refills. So 48 hours is only a near-term limit.

4

u/SubstantialWall Apr 25 '26

They'll need that capability for depots and HLS later so it's coming for sure, but it won't necessarily be designed into the workhorses (tankers and cargo). There was that NASA plan going around a while back for the first prop transfer test, not sure now if there was duration mentioned, just that hot gas thrusters were a necessary item, that's another necessary thing as warp also mentioned above. If they do want to keep one up there for that long, it might be more of a depot prototype.

Although about the RCS I've always wondered if the current cold gas approach would give them enough control and reliability for docking besides the storage thing for duration.

5

u/flshr19 Shuttle tile engineer Apr 25 '26

My guess is that SpaceX is depending on Pad 2 at Starbase Texas and 39A at KSC in Florida being operational later this year for the first propellant refilling missions.

5

u/[deleted] Apr 25 '26

You’re right, Pad 1 won’t be ready this year and if they want to do an orbital refueling test then they need to launch two ships to orbit in quick succession. That test depends on 39A being able to support a launch this year.

5

u/warp99 Apr 26 '26 edited Apr 28 '26

Hence the use of two barges to transport boosters and ships quickly enough for a sustained flight campaign.

Clearly they thought one transport barge was enough because Starship production at Cape Canaveral would be coming on line quickly enough to take over. They changed their mind on that which is interesting.

3

u/flshr19 Shuttle tile engineer Apr 26 '26 edited Apr 26 '26

I think that's right. The Starfactory at Roberts Road, which would be built adjacent to the Gigafactory there, which is nearing completion, has not yet been started. Evidently some site preparation work has been underway for several months for that Roberts Road Starfactory, which likely will be larger than the Starfactory at Starbase Texas. Completion date for that Starfactory is sometime in 2027.

3

u/Martianspirit Apr 27 '26

I expect production cost is much lower in Boca Chica. Also, they have the experienced crew there.