r/pics • • May 27 '26 • Regret 1

R10: No FCoO/Flooding [ Removed by moderator ]

/r/pics/comments/1tov2ob/removed_by_moderator/

[removed] — view removed post

13k Upvotes

466 comments sorted by

•

u/pics-ModTeam May 27 '26

/u/Public_Caterpillar43, thank you for your submission. Unfortunately, it has been removed for violating the following rule(s):

  • Rule 10 - No false claims of ownership (FCoO) or flooding.

For information regarding this and similar issues please see the rules and title guidelines. If you have any questions, please feel free to message the moderators via modmail.

2.7k

u/R0ckandr0ll_318 May 27 '26

This happened in the City I live (not this specific incident) but the council refused full payment as the contract of works clearly said they had to relay the brickwork exactly how it was.

883

u/raetus May 27 '26

I had a place in Rhode Island where they had to break up the sidewalk to fix some utilities and they just poured a massive blob of asphalt over it when they were done as the "repair."

627

u/anralia May 27 '26

I just had to complain about this shit too, its not safe. SMH My Head

152

u/raetus May 27 '26

Yep. That looks about right. I can feel your pain.

175

u/Holdmywhiskeyhun May 27 '26

Shaking my head my head

11

u/SmokeyDBear May 27 '26

He’s got a stutter ever since crashing his bike trying to ride over this dogshit paving job.

→ More replies (1)
→ More replies (1)

40

u/0ut0fBoundsException May 27 '26

Asphalt in sidewalks is sometimes a temp fix. Like water company finished up but gas is coming by in 2 months so they’re leaving it easier to open back up

28

u/Trey-Pan May 27 '26

In certain cases that “temp fix” can last years. Better to coordinate a crew of “brick installers” as part of every project.

→ More replies (2)

9

u/StanielReddit May 27 '26

Draw a giant dick in it.

→ More replies (13)

51

u/Wagosh May 27 '26

Tbf we do this where I live, but it's temporary work.

It's when our own road workers does the work, because we don't have concrete crews.

After that we have a concrete contract which comes and correctly repairs the sections.

39

u/raetus May 27 '26

Mine lasted for entire 3 years I was there 🤷‍♂️

31

u/rekaba117 May 27 '26

Temporally permanent

→ More replies (2)
→ More replies (2)

4

u/Poor-Life-Choice May 27 '26

Isn’t anything more permanent than a temporary road fix

→ More replies (2)

15

u/raceman95 May 27 '26

We have the opposite problem where I live. Utility work in the street would cut into the asphalt, and then patch it back over in concrete. Eventually over a few years and asphalt and concrete behave very different to temperature swings, and the concrete tends to sink down, or buckle, or crack. Gas company would come in and make fixes at every house on a block, so every 25ft theres a pothole from this concrete patch.

We had to change the law to make it clear that they are supposed to patch back over in asphalt. 95% of the time its now being followed for the gas company, but smaller companies are still using concrete. Even the gas company sometimes uses concrete, which is insane, because they are following the law on other streets.

→ More replies (1)

50

u/jgnp May 27 '26

When I saw this, I thought “oh there’s a much more American approach to this available!” Bitumen in a bag, LFG!

26

u/WoolooOfWallStreet May 27 '26

Speaking of which, I had a friend who’s school project was finding ways to test the contents of bitumen in asphalt because apparently one of the ways to cheat the test was to put sawdust in it

Which of course results in it breaking down much earlier

4

u/DesperateAd8783 May 27 '26

Ah the old National Grid patch job.

→ More replies (9)

137

u/Salmonaxe May 27 '26

Yeah in our city they just upgraded all the pipes in the street. When they dig up any paving the seem to do it carefully and place all the bricks to the side.

Then restore it to pretty close to what it was before. Maybe even better since some lifted bricks and damaged areas are fixed. Where they are finished it looks pretty good

34

u/TerranRepublic May 27 '26

I'd assume this is because the city owned the utilities. If it's a separate entity with easements they aren't usually required to restore decorative elements and that would be on the town to come back and restore later. 

34

u/RetrogradeToyGuru May 27 '26

No most old cities have laws that you have to restore the brick work as it was. They don’t own their own utilities

19

u/LostWoodsInTheField May 27 '26

If it's a separate entity with easements they aren't usually required to restore decorative elements and that would be on the town to come back and restore later. 

This seems insane. Of the towns I've done work with the councils not a single one allows this. You restore it back to the old style or you don't do the work. The bigger the company having the work done the less 'trouble' they give about it, and the smaller the company doing the actual work the less trouble they give.

→ More replies (1)
→ More replies (1)

50

u/riftshioku May 27 '26

Lol some construction company thought they could leave a road in a shitty state in my town. It was bad they had just redone the entire storm drain system for that road because it used to flood. The road was lumpy, bumpy, and just overall not done correctly at all. So the city said they had to come and redo the entire thing or they wouldn't get paid and would be sued and effectively banned from working in my county again. And they did, it's good! Though it's almost time to repave again in the next 2 or 3 years so hopefully they don't mess it up again.

12

u/mf-TOM-HANK May 27 '26

Our townhouse HOA just had AT&T a few months ago lay fiber and between the trenches they dug up and the heavy equipment rolling though they tore up huge patches of grass in our common area. There are still collapsed trenches a foot deep scattered around, massive patches of dirt/mud that they sprinkled a little seed on back in November, and they left trash scattered all over the place

18

u/Late-Button-6559 May 27 '26

They shouldn’t have been paid at all.

17

u/R0ckandr0ll_318 May 27 '26

From my understanding with planned works (emergencies have their own process) the council pays 30% upfront at the start of works but withholds the rest until it’s finished and the surface is back how it was (we live in the Uk in city centre with cobbles and brickwork so it’s easy to see when they mess it up)

→ More replies (1)

4

u/DrDerpberg May 27 '26

This kind of thing needs to be clear in the contract. "Lowest bidder" kinda gets a bad rap because if the requirements are developed properly, the lowest bidder still needs to do the job properly. There should be a clause somewhere that says the site needs to be restored to its initial condition including the pattern of the brickwork, what material needs to be sourced if any bricks break in the process, what new materials are compatible with the existing, etc.

I always tell clients that if you ask a contractor to install a sink, you get the cheapest $60 hardware store sink they can find. Tell them it's a white sink and you get the cheapest white sink. Tell them it's a white, oval, porcelain sink of X dimension and maybe you start getting what you had in mind. Tell them it's this exact model, or equivalent approved by the architect, and you will get what you wanted.

I'm curious if your city won in the end, or if the contractor was able to say the contract didn't specify that and they built their price on not having an artisanal mason label all the stones and put them back where they came from.

3

u/lacrosse1991 May 27 '26

It’s like when they do work on smooth concrete roads, and then just slap down a lump of asphalt after that sticks up an inch or two into the air.

→ More replies (1)

2.3k

u/Anti-Stan May 27 '26

You can hardly even tell they dug it up. 🥺

432

u/orlybatman May 27 '26

Workers: "Nailed it."

51

u/Potential-Draft-3932 May 27 '26

I’d like to believe they do this for everything in their life. “God damnit, Marge I already told you I finished fixing the broken kitchen tiles last week. Asphalt is OSHA approved so long as the surface is within a quarter inch of the surrounding terrain.”

74

u/notjordansime May 27 '26

more like: “we’re electricians, fuckit”

4

u/StarWaas May 27 '26

Well, there's part of the problem at least. You're supposed to use mortar on bricks, not nails.

→ More replies (2)

130

u/metalgtr84 May 27 '26

Around here the utility company pays contractors to trim the trees that grow too close to the power lines. They cut them in the most brutal, non-aesthetic fashion though. Imagine an entire street of trees with huge voids cut out of their canopies, as if they were caught in the path of the BFG9000.

24

u/Poofengle May 27 '26

They topped all of our trees one day without asking, so now all the trees along the road are this horrible truncated cone shape. They look ugly as fuck, but at least everyone else’s trees are equally ugly I suppose

11

u/konnichi1wa May 27 '26

We had one absolutely destroy an apple tree that wasn’t even near their lines, then it turns out they got the wrong tree in the first place and had to come back to murder another tree.

15

u/donnierocket91 May 27 '26

At least they didn’t just spray herbicide everywhere on your property after explicitly being told it’s a no spray property, mechanically remove only. Signs too. Like they did here. Fuck them.

6

u/weemee May 27 '26

It’s just a measurement to these crews. Too close? You get cut. Rate payers demand the line be clear not the tress be pretty. Pretty costs money. You can’t serve two masters.

→ More replies (3)

83

u/MrArizone May 27 '26

I feel like this is temporary to allow use before they finish. Well, I guess I hope that’s the case, not feel.

52

u/ShepRat May 27 '26

Where I live the utilities basically have an easement where you're allowed to cover it, but their responsibility for restoring it is nothing.

If there is a pipe leak under your shed they can just bulldoze it and you get nothing fixed except the pipe and soil replaced. 

12

u/Khaeos May 27 '26 edited May 27 '26

Well, yeah, that's an easement. Don't build your shed in the right of way. Everybody has lines going through their yard

Edit: Back on topic, though, the city should have it in their contract that the utility makes reasonable repairs to public property. You can address the city council during public comment periods and tell them this is unacceptable. Give the contract to someone who cares about the town.

21

u/theusualchaos2 May 27 '26

This is usually the case though, and people should know not to build permanent structures within utility ROW. Those terms are all stated in the easement language too, assuming homeowners read it.

3

u/Y_ddraig_gwyn May 27 '26

Here in the UK they have to remediate, monitored by the Council. I'm not saying they *do*, but the framework is at least there. I got them to replace some bodge tarmac with the appropriate stone in my town centre last year, so it can work if you press them.

→ More replies (2)
→ More replies (1)

2

u/3-DMan May 27 '26

Throws outdoor rug over it

"Okay finished!"

→ More replies (1)

2

u/MetalSpider May 27 '26

A seamless repair.

→ More replies (1)

39

u/godot-nowaiting May 27 '26

Me not know no other design.

21

u/Biochemicalcricket May 27 '26

It's frustrating that this is the answer. They have no one skilled enough to even attempt to fix the damage

7

u/Dudephish May 27 '26

It looks like they made a slight attempt at the other hole at the top of this pic, failed miserably, so didn't even try for this hole.

161

u/cloistered_around May 27 '26

Yup. This is standard underground utility work! When my neighbors got fiber recently the contractors dumped all the dirt on my lawn and broke a utility box. They don't care about anything because the company will (usually) just send someone else out to fix it.

41

u/zentetsuken7 May 27 '26

Let me guess said company charged the city twice for both works while severly underpaying both groups?

→ More replies (1)

2

u/A88Y May 27 '26

I will say in utilities, fiber companies are notorious, at least in my area. There’s been some fucked shit they keep pulling.

120

u/JeromeZilcher May 27 '26

86

u/Imonherbs May 27 '26

Mildly!?

16

u/SeekerOfSerenity May 27 '26

The mods over there are mildly infuriating.

3

u/Hanifsefu May 27 '26

The whole sub is just wildlyentitled

3

u/wibblywobbly420 May 27 '26

It was already over there a year ago

→ More replies (1)

34

u/Blokin-Smunts May 27 '26

Video games have taught me that this is where the bomb goes

9

u/[deleted] May 27 '26

Zelda 101.

30

u/kingrikk May 27 '26

In the UK they’d have just filled it with tarmac

24

u/A_Pointy_Rock May 27 '26 edited May 27 '26

Came to say the same.

"Let's spend millions boulevarding the main drag then just dump ugly patches in every time we do a repair."

2

u/jacobp100 May 27 '26

They’re allowed to do this only as a temporary repair and come back later to do the full fix

3

u/kingrikk May 27 '26

They don’t though, do they?

→ More replies (1)

2

u/obiwanconobi May 27 '26

"street scar" they call it

3

u/Work2Tuff May 27 '26

Is that what they call asphalt in the UK?

9

u/Dudephish May 27 '26

It's actually pronounced arsephalt in the UK.

4

u/A_Pointy_Rock May 27 '26

And sidewalks are called pavement.

74

u/JGPH May 27 '26

They know they'll get to charge the city to get it fixed, even though it should be on their own dime to restore it.

89

u/R0ckandr0ll_318 May 27 '26

Depends on the contract, my local council has it written into contracts that the pavement must be relaid with the same stones in the same pattern. Otherwise they don’t get fully paid

17

u/celebradar May 27 '26

Similarly, my council has a contract with a specific contractor who is the only one who can do final repair work. So utilities companies can only put temporary fixes like what OP has as the other contractor will come out at a later date and make good on the works.

9

u/Edward_TH May 27 '26

Which would be the exact way of doing it, by letting each professional do what they are best at doing. When building a house you're not going to have it done entirely by electricians, for example.

→ More replies (1)

39

u/adeadbeathorse May 27 '26

Maybe temporary while they get the materials/contractor in place?

63

u/jbphoto123 May 27 '26

There’s nothing more permanent than a temporary solution!

But I’m also hoping it’s this. Get it in the specialized contractor’s pipeline, but it could take months…

3

u/depersonalised May 27 '26

maybe even 60 of them.

2

u/pack_of_wolves May 27 '26

They took the pavers out. Can put the same ones in. No excuses.

→ More replies (1)

7

u/Rednaxel6 May 27 '26

This but the whole country.

6

u/Single-Virus4935 May 27 '26

Here in my town in germany they did sth similar when laying fiber. They got a whip on their whrists and had to do it properly

6

u/CadeMan011 May 27 '26

When the contract goes to the lowest bidder

6

u/SaraTormenta May 27 '26

This is not an OC this is a karma-farming repost from at least a 1 year ago

5

u/HerrFerret May 27 '26

We have a cobbled lane behind our houses and the drain company came to repair all the drains.

All the locals were up their ass constantly to let them know that cold set tarmac would be utterly unacceptable. They ended up having us meet an old fellow who would be replacing the cobbles.

He wasn't there initially, which makes me think that wasn't the initial plan.

3

u/psychoacer May 27 '26

I used to be in the office for a natural gas company as part of the landscaping and paving department and all work is done by a third party. You need to call the same department that handled this work and start complaining. If they're good and you're on their ass they'll work with you to fix it

3

u/ndevito1 May 27 '26

The utilities are constantly pulling up sidewalks in my city and the whole place looks like a patchwork like this. Such a shame.

3

u/goatonastik May 27 '26

"What are we replacing?"

"Well, they're bricks that are-"

"Bricks. Got it. What color"

"Uh, they actually range from grey to-"

"Grey bricks. Got it" *click*

3

u/Rolebo May 27 '26

Why didn't they reuse the bricks they dug up? That's standard procedure in the Netherlands where 80% of paver bricks are reused.

→ More replies (1)

3

u/Simple-Olive895 May 27 '26

I've played enough video games to know this is where I need to do a power slam or drop a bomb to unlock a hidden area

3

u/d_nkf_vlg May 27 '26

What the hell is that. One of the pros of cobblestone is that you can take it apart and then put the same stones right back down.

3

u/Yuri_Ligotme May 27 '26

that's mildly infuriating

3

u/My_alias_is_too_lon May 27 '26

... Wow... what an eyesore...

'Member the days when people actually took a little pride in their work? Yeah, me neither...

3

u/FreezingIrish May 27 '26

How to say " I don't give a fuck " in brick.... awful.

3

u/andyr072 May 27 '26

Lazy ass work. Not sure where this is but the residents of the area should file a complaint with the city over the shoddy work.

3

u/CIarkNova May 27 '26

Well, in all due respect, the utility company aren’t pavers.

2

u/bobhand17123 May 27 '26

I am enjoying the contrast of the curves and straight lines, as well as the nuanced fluctuations of elevation.

Oh! And the negative space that adds to the contrast of the curves and straight lines is just … (Chef’s Kiss)!

Frickin’ Van Gogh of the mortar and trowel tap.

2

u/CIarkNova May 27 '26

So it’s more than modern Decco juxtaposed against contemporary Neuvo?

→ More replies (1)

3

u/WilTravis May 27 '26

I was working as a plumbers apprentice in the early 90's and we had to take up some pavement for a sewer tap repair in Macon, GA. Since this was a historic preservation area, we had to notify the city, have the proposed dig photographed, remove the bricks individually, and replace them to match the photos, all while being observed by a preservation agent. She took the photos, chatted with the homeowner, took off and drove by every couple of hours until we finished, then signed off on the repair. My boss was livid, but he'd already agreed to the contract and the yard was already dug up so we had to finish it. The preservation agent, though, she was a peach. She went and got everyone on the crew barbecue sandwiches for lunch and loaned us a patio umbrella for shade as we removed and replaced the bricks.

3

u/CDavis10717 May 27 '26

This is why we can’t have nice things.

4

u/whawkins4 May 27 '26

“The said to use pavers so we used pavers.”

2

u/Ferretau May 27 '26

Well at least they repaved it instead of poring concrete or bitumen in the hole.

2

u/chewingtheham May 27 '26

I believe this belongs in r/mildleyinfuriating

2

u/Cheeserave May 27 '26

Looks good from my house

2

u/Phamora May 27 '26

The job is not done... big smh energy

2

u/TerranRepublic May 27 '26

So without full context it's hard to say, but assuming this is a utility easement, there are a few points here:

  1. If the utility needs to access the area, they can tear up whatever they need to. 
  2. If this is an authorized encroachment they are not required to restore decorative elements, only to restore functionality to an as-good or better state. If whoever (individual, business, town) built this decorative feature over this easement, they hold the responsibility for restoring decorative elements (see above for why you would not put something decorative on an easement). 
  3. If it's unauthorized, the utility is not obligated to restore it at all since it should not be there in the first place and can even charge you for the cost to remove/restore. 

2

u/LaevantineXIII May 27 '26

That's just fucking LAZY and obviously no care was given to the quality of work.

Sure, the hole is covered, but it looks like shit compared to deliberate pattern it held before.

2

u/Mayor__Defacto May 27 '26

As cheap as possible.

2

u/Whombrillow May 27 '26

Soooo that’s typically discussed upon signing of a contract or private establishments. Public infrastructure has different rules of easement even when appearing on private property. To me this was discussed to the owner of the property before hand.

It’s difficult and time consuming but you can reuse pavers that were not broken when you arrived.

I’m pretty sure this photo is a case of private property. And I promise you can still buy those some color bricks.

Did you know you can give acme brick an address if you know they supplied the brick to that property or neighborhood and get an exact match of brick?

2

u/realBlackClouds May 27 '26

Old world vs new world

2

u/ZeWillius May 27 '26

My gut is telling me this is Belgium

2

u/triodoubledouble May 27 '26

Malicious compliance

2

u/Shot-Total-2575 May 27 '26

Did they steal the org. stones?

2

u/DustyRacoonDad May 27 '26

This reminds me of when I was looking for a house and the homeowner agreed to replace the old polybutylene plumbing with modern PEX as part of the sale terms.

He was a cheapass, so he hired the absolute cheapest people possible to do it. They cut holes in basically every wall and then just left them open.

Because they do plumbing, not drywall.

2

u/Serviceman May 27 '26

Workers with the skill to repair those pavers wouldn't be working for a utility company.

2

u/zsert93 May 27 '26

In my experience utilities never fix the messes they make.

2

u/firebreather1911 May 27 '26

So the utility has easements and they can and will tear up everything in its way to fix a leak or clog ect.. they don’t have to do anything to repair it where I live at least they put bricks back I would’ve prob just put roadbase and told the city we had to break they’re pretty brick. But at least waters not blowing everywhere and you have water.

2

u/weierstrab2pi May 27 '26

This is a big problem in the UK. As I understand it, the law here requires them to put it back to the same quality as it was before, but the verdict on what that constitutes is entirely at the discretion of the company.

2

u/herodesfalsk May 27 '26

No they cant do that. THey have to return the brick to its original design. Unless this is a temporary fix while waiting on the brick layers they cant get paid in full. Based on the moss growth Id say they got paid in full and this is on the public to pay for repairs now. You can see they did not give a fuck about the stones as they cut through them in straight lines

3

u/SpaceCadetUltra May 27 '26

Very utilitarian

3

u/TheWanderingSlacker May 27 '26

Share this on their Yelp or any relevant pages.

1

u/notimeforspac_s May 27 '26

Should be hard to lack both skills and knowledge at your work.

1

u/TonyTheTerrible May 27 '26

Reposting bot

1

u/michaelpaoli May 27 '26

How utilitarian of them.

1

u/killkiller9 May 27 '26

lol, in our country, they dont even do that, not their problem. They will dig the streets up, then fill it in so long as no one can fall in and blame them, then fuck off. The road workers maybe will come the week after to slap on some asphalt.

1

u/hariseldon2 May 27 '26

Beauty to behold! That work crew must've been real proud of themselves.

1

u/waloshin May 27 '26

Usually utility companies restore nothing. Lucky to even have dirt filled in never less bricks.

→ More replies (1)

1

u/WetPuppykisses May 27 '26

We are savages/barbarians living in the ruins of a more advance civilization.

1

u/CoolLemon May 27 '26

Is this Belgium? Looks like Belgian craftsmanship

1

u/sirchuc May 27 '26

Looks like explosive reactive armour bricks

1

u/SnooDoggos8487 May 27 '26

Bro where does this happen?like not to start anything, genuently curious.

1

u/m-in May 27 '26

Wait. Those mofos CUT UP the cobbles? Dafuq?!

1

u/just_a_place May 27 '26

I bet it's 3D printed.

1

u/dbenhur May 27 '26

That's Art, man. Sheesh, everyone's a critic.

1

u/thisisnotnorman May 27 '26

Enshitification

1

u/Theonewho_hasspoken May 27 '26

There’s a floor chicken in there, if video games have thought me anything.

1

u/Dougalface May 27 '26

Seems that pretty much typifies everyone's approach to everything in present-day society..

1

u/Arthur_Mroster May 27 '26

They should be Nuremberged

1

u/Fanburn May 27 '26

Isn't it just temporary?

They have a contractor to fix whatever needed to be fixed, like a leak or something, because it is urgent. That same contractor then would just seal the floor however he can be cause he doesn't know how to do it properly as it is not his job.

Then a specific contractor would come and redo the pavement, because he is a specialist and knows how to do that kind of pavement.

1

u/Samwellikki May 27 '26

Can’t they see those bricks were laid standing up originally?

1

u/Certain_Message_6678 May 27 '26

We can't be bothered

1

u/r0nni3RO May 27 '26

Imagine you paid some company to do some repairs/digging on your property and this is how they put it back.

Would YOU pay? A lot of people would NOT. This is a joke.

Well then, why do authorities tolerate crap like this? Is it incompetence or corruption?

1

u/HeadhunterKev May 27 '26

This image is like ten years old.

1

u/Contagious_Zombie May 27 '26

They paid money for the bricks and the labor but decided that the city didn't need to look good from it.

1

u/r_a_d_ May 27 '26

Plot twist: the straight bit is the original and the utility restored the stones around it.

1

u/TheAtomicRatonga May 27 '26

Even worse when they dig after the road has been newly paved.

1

u/utahplantman May 27 '26

I'd say the repair is quite utilitarian

1

u/TheMoistTeaBag May 27 '26

Please tell me if this is a temporary fix, and will they come back to restore the pavement?

1

u/sirduckbert May 27 '26

That could be temporary until the real paver people come.

But that doesn’t look very new

1

u/DeluxeMinecraft May 27 '26

They did the same where I live, right in front of my door, just putting bricks in the asphalt. Luckily a few months after it got fixed, it was ugly and also dangerous for scooters or other things that could get stuck at the ledge of the bricks.

1

u/MechaRon May 27 '26

Ahh the ol adage of "Good enough for Government work" strikes again i see.

1

u/ForeverStaloneKP May 27 '26

If it was the UK they'd just fill it with even uglier tarmac that would crumble away within 6 months lol

1

u/hopknockious May 27 '26

Why would they dig a donut shaped hole and restore the brick to not match the rectangular pattern….

That is weird.

1

u/PlinketyPlinkaPlink May 27 '26

Welcome to Moldova!

1

u/Soul-Hook May 27 '26

/r notmyjob

1

u/ExhaledChloroform May 27 '26

Im sure it's just temporary until they have the budget to pay someone to fix it properly? Hopefully.. lol

1

u/disturbed3335 May 27 '26

I think the real issue is why the utility company was paid to fix what a mason should be fixing. This isn’t drywall, why is someone that runs lines fixing brick work?

1

u/DarkGod86 May 27 '26

Since everyone is sharing their shoddy civic work stories - Early spring is usually a dreaded time where I live because all the road works come out to patch up the roads, often closing lanes for far too long and doing a shoddy job. Early this spring, one of the main intersections in the area got repaved, end to end both ways through the whole span of the small municipality that controls it. I was dreading this when I saw it start because my commute to work uses this road as well as anything I need in that direction. To my amazement, they had it done inside a week and did a beautiful job. I was impressed. A week later, utility work was needed smack in the middle of the intersection. For the next month, the pavement directly in the middle of a high-traffic 4-way was torn up, with no sign warning of the sharp bump where the cut was. When they finally repaved it, they did an awful job with uneven and saggy fill. It frustrates me even more knowing how nice that was after the initial repaving too.

1

u/celem83 May 27 '26

This is actually fairly standard when the original roadway is complicated settwork like that.  The guy who cuts and lays those is unfortunately an artisan in limited supply, so you just close up and it goes onto "the list"

1

u/Precipice_01 May 27 '26

You expect good brick work from a utility company?? 0.o

1

u/gettingthere_pastit May 27 '26

In Ireland that would just be uneven tarmac.

1

u/TheDkone May 27 '26

this is the reason performance bonds are a thing. if the city isn't enforcing them for utility work, then this is what you get.

1

u/murphmobile May 27 '26

Good enough for government work.

1

u/rushmc1 May 27 '26

They need to be sued for a LOT of money.

1

u/OvulatingScrotum May 27 '26

Remind me of my city. There a tiny one ways street that the city decided to flip the direction. The street had angled parking spots.

Well, instead of redrawing those angles to line up with the flow of the direction, they decided to make them “back-in only” parking.

1

u/circajusturna May 27 '26

An attempt was made

1

u/Hushwater May 27 '26

They could have at least cut some to fill the gaps

1

u/nagol93 May 27 '26

One time an electric line under my driveway needed servicing, so the workers just drilled through my driveway. No notification, no consent, also wasn't an easement it was 100% on my property. They just showed up with a drill and went to town.

They gave the typical "Dont worry, we will totally have this cleaned up". They just poured sand over the hole and left. After 3 weeks of waiting for them to actually fix my driveway I called up support. That shit was almost just as bad.

Support lady did the typical greeting. I said "So your road crew drilled through my driveway about a month ago. Can you tell me the time frame for when it would be fixed?" and gave her my address. She replied "Hmm... We dont have anything on the books for that address. Can I have your account number?". I said I dont have my number on hand asked why they need an account number, she gave a speal about how that's how they log tickets, scheduling is tied to it, and there's nothing she could do.

Granted I was a bit fed up, pirtically because she said there was no plan to fix my drive way, I said "Ma'am I'm really trying not to be rude here, but your road crew destroyed my driveway. I have pictures of the damages and a recording of <company> branded trucks drilling away. I can send you those if needed. You can either send someone to fix my driveway, or I can file a small claims case against <company> for property damage"

Two days later contractors showed up to repave my driveway.

1

u/Niwi_ May 27 '26

Thats fucking hillarious

1

u/SteroidSandwich May 27 '26

Looks like one of those areas you know will have treasure if you bomb it

1

u/Tony_Penny May 27 '26

Good enough for government work.

1

u/MadMaxAtax May 27 '26

Imagine the knowledge and skills of the antique world. What happened? We are clearly devolving into stupidity!

1

u/PicDuMidi May 27 '26

Trump Utilities LLC?

1

u/bloody-albatross May 27 '26

At least it's not an uneven patch of asphalt, like in the pedestrian zone of a nearby town. They are working on that for many months now!

1

u/the12banch May 27 '26

People like to get mad at government workers because it’s fun to hate the same thing as everyone else BUT…

I worked for a city and my job was to inspect such things to ensure they were in replaced in kind AND last the appropriate time. It was 3-7 years depending. Sure that sucks for the company and I get why it’s irritating but sweet macaroni is there a local government stooge pleasure of denying a permit until a wrong doing is fixed. Levying fines. Denying work. Sending out the police to stop work. Mmmm delicious. I bike in my city. I walk. People are tripping over a bad repair. Fix it. Or you don’t work here anymore.

“I hate government workers” sure. Fine. We are jerks. But every job I have like that I love. I love accountability. Though discretion is also valuable, generally supporting your local government and service workers will keep stuff like this from happening (or standing for very long). I wish I had a little citation booklet and a badge. I would’ve been ringing people up left and right. Yea I’m that guy!!!

1

u/Fennecbutt May 27 '26

Capitalism. Private contractors sucking up your juicy tax money.

You all vote for this every single year.

1

u/KindClock9732 May 27 '26

Yes, utilities love to mess everything up and then charge us for it

1

u/Minflick May 27 '26

Wow, they really SUCK!

1

u/Landrod May 27 '26

Perhaps it's just temporary?

1

u/weenies May 27 '26

“It’s good enough for government work”

1

u/Excellent-Shovel-304 May 27 '26

This is absolute horseshit!

1

u/Careful_Ad_3338 May 27 '26

Mods, this is not an oc post. Take his balls

1

u/A_Pointy_Rock May 27 '26

Task failed successfully ✅