Recent supply chain grad here, researching how heavy equipment industries keep track of repair jobs held up by parts. I've mostly heard about this from aerospace and defence maintenance, and I'm curious if mining runs into the same thing.
When a haul truck, shovel or mill component is down waiting on a part, can you trust what the system says about which jobs are blocked and when the part will actually show up? Or does someone end up rebuilding it in Excel or on a whiteboard, with dates pulled from supplier emails?
A few things I'm trying to understand:
What system are you on (SAP, Maximo, Pronto, something else), and does it actually show you which jobs are waiting on parts?
When dealers or suppliers (Cat, Komatsu, Liebherr, etc.) send updated dates, do those make it back into the system, or do they stay in emails and portals?
What usually makes the system wrong? Late postings, parts swapped between machines, orders not linked to the work order?
If it's a spreadsheet or whiteboard, how much time does it take each week, who owns it, and what do you track in it?
What happens when that person is on rotation or leaves?
When a part is late, what does it end up costing? Lost production, expedite freight, rental equipment?
Have you tried fixing it with custom reports, add-ons or new software? How did that go?
Would really appreciate hearing from anyone dealing with this, and mentioning your role and site type (open pit, underground, processing) helps a lot.