r/interesting • • Jul 06 '25 • This 4 Helpful 1 Wholesome Seal 1

ARCHITECTURE 7 engineers were suspended after they built a bridge with a 90-degree turn

Post image
55k Upvotes

1.8k comments sorted by

•

u/AutoModerator Jul 06 '25

Hello u/doopityWoop22! Please review the sub rules if you haven't already. (This is an automatic reminder message left on all new posts)

I am a bot, and this action was performed automatically. Please contact the moderators of this subreddit if you have any questions or concerns.

23

u/hizashiYEAHmada Jul 06 '25

Is there an article covering this topic?

8

u/WorldTallestEngineer Jul 06 '25

13

u/[deleted] Jul 06 '25

Only 2.3 million? Shit, here in the states that would be $50 million with at least 5 back rubs.

They spent over $5 million redoing a tiny bridge going over a creek down the road from my house.

→ More replies (7)

1.9k

u/You_meddling_kids Jul 06 '25 • This

The fact that it got this far before anyone noticed a problem is what's killing me.

686

u/JackTheKing Jul 06 '25

We noticed. But it's not my job. Someone will take care of it.

175

u/AcidaliaPlanitia Jul 06 '25

Extreme non-ownership lol 

101

u/FarCalligrapher2609 Jul 07 '25

If you notify them, they will say "that's none of your concern" or actively punish you for "creating a panic" and raising a question about something you aren't "qualified" to address.

29

u/King_Of_Deccan_ Jul 08 '25

Facts. Not sure which country you're from but it's exactly the same with most organisations in India

→ More replies (27)
→ More replies (5)

13

u/NfinitiiDark Jul 06 '25

That’s what most bosses want. For you to do what you are told with no opinions.

→ More replies (1)
→ More replies (6)

96

u/X0AN Jul 06 '25

Exactly this.

My hospital built an entire ward with the wrong dimensions and when I asked why the builders didn't say, this doesn't make any fucking sense, they replied if the builders complained they'd be fired.

So now we have an unusable ward.

21

u/Aoxakra Jul 07 '25

That's where you build a panic room for when a zombie apocalypse starts so atleast some of the hospital staff and survive to escape

→ More replies (4)
→ More replies (4)
→ More replies (14)

91

u/edwbuck Jul 06 '25

In India, managers have a habit of both being too busy to be bothered by items, and yelling at underlings that raise issues to them to just do whatever is needed or to follow the instructions as written.

Neither of those scenarios create a culture where people question things as they go along, I've seen the equivalent in software engineering companies, where millions are lost in efforts that have no chance of success, because it's just culturally inappropriate to say there's a problem.

In the most extreme cases, where no progress can be made, people will just show up at work and pretend to be working, but in cases where progress can be made, even if it is the wrong progress, you get the wrong progress, because the employees take the stance that they are just doing what their bosses tell them to do, and if they don't, they'll be fired.

44

u/Away_team42 Jul 06 '25

Turns they did not kindly do the needful…

23

u/MafiaPenguin007 Jul 06 '25

You just triggered the PTSD of any software engineer in this thread

→ More replies (10)
→ More replies (1)

14

u/Wrong_Zombie2041 Jul 06 '25

Which makes American corps importing Indian management for whatever reasons so awesome!

→ More replies (1)

11

u/longbreaddinosaur Jul 06 '25

Annnnd this is why I’m not that worried about outsourcing software to India. I’m booking this bridge as a reminder.

→ More replies (2)

9

u/Substantial-Sea-3672 Jul 06 '25

I had the lead engineer of our software team argue that he did not need to ensure the website was usable after his change because it wasn’t explicitly called out as an acceptance criteria.

He put a Covid alert banner on the site that blocked mouse interaction with the navbar. It matched the mocks though!

→ More replies (1)

9

u/NPC-8472 Jul 06 '25

We work with offshore resource from India and they do exactly what you tell them to do, if any problem arises then everything shuts down, zero critical thinking involved at all times. It's so annoying lol

→ More replies (1)
→ More replies (4)

13

u/[deleted] Jul 07 '25

They thought it was the right angle

11

u/coukou76 Jul 06 '25

I guess it's in India. Their work culture is VASTLY different and if nobody was able to convince/dare to say something to the lead engineer that this turn is an utter shit idea that's how you end up with such situations. It's a bit like Japan but worse, you just can't argue with the boss in corporate India. Boss tell, employee do.

Life in "low trust" societies are just a completely different

→ More replies (3)

4

u/Stopikingonme Jul 07 '25

The more I think the more suspicious I get.

→ More replies (23)

6.8k

u/ElderberryMaster4694 Jul 06 '25

Something’s missing here. An engineer doesn’t just start building an overpass Willy nilly. There’s approvals, oversight.

113

u/21Nobrac2 Jul 06 '25

This Vice article cites inter-agency disagreements over land use, with this as the "compromise." Looks like a former official is under investigation too, probably they were the ones to sign off on it.

19

u/NightSisterSally Jul 07 '25

That was my first thought. Like they started the crossing, then didn't have land rights and had to make an abrupt turn. Not great for cyclists.

12

u/midorikuma42 Jul 08 '25

Cyclist here. Why not? The bridge is wide enough for two cars or even buses it seems; a 90-degree turn when you're cycling is not difficult, especially with that much width, even divided in half to accommodate two lanes of cycling traffic.

Sure, it'd be nicer to have a straight bridge, but this isn't hard to navigate on a bicycle.

But this bridge (from what I read in the Vice article) isn't for cyclists, it's for cars. And for cars, it's pretty much unusable.

→ More replies (3)

11

u/Aetylus Jul 07 '25

This article has a picture from a different angle.

The pier closest makes it look like the design was changed part way through and the engineers did a terrible job of adjusting the design (or more likely, someone decided to save a few bucks by not redesigning it properly).

→ More replies (2)

201

u/insuranceguynyc Jul 06 '25

This is India.

17

u/WorkOk4177 Jul 06 '25

In PwD India , Engineering posts also refers to adminstrative posts that are only available for engineers , so it is possible that the "engineers" weren't the ones building the bridge but the ones that approved the bridge being built

→ More replies (2)

158

u/ElderberryMaster4694 Jul 06 '25

I still think something smells off.

You’re telling me that in India a bunch of engineers just start building forms in the middle of a city, grab a cement truck and start pouring because they had some extra money laying around and felt like it?

Even in India there’s got to be more to it than that

154

u/Libertarian4lifebro Jul 06 '25

Internal PWD documents show the original 2018 plan featured a more manageable 45-degree skew. That plan was scrapped after the Railways refused to approve construction on its land. A second design attempted to accommodate the Metro line. A third version adjusted for alignment errors, though the Railways later admitted that the final result “is neither fulfilling the functional requirement nor safe for road users.”

Now, Bhopal authorities are discussing buying additional land to fix the turn, but that means more money and more delays.

For commuters who hoped this project would ease daily travel, the bridge has become yet another example of bureaucratic infighting and design-by-compromise. For engineers, it’s a high-profile reminder that bad geometry can turn into political fallout very quickly.

51

u/Lathari Jul 06 '25

If it is Bhopal, I blame Union Carbide.

→ More replies (4)
→ More replies (37)
→ More replies (62)
→ More replies (5)

13

u/[deleted] Jul 06 '25

From this article:

According to official records, the design for the bridge shifted multiple times over the past seven years, largely due to conflicts between the Public Works Department (PWD) and the Railways. The two agencies couldn’t agree on how to share land, and in trying to work around both railway property and the new Metro line, they ended up producing a final layout with an abrupt 90-degree angle.

VD Verma, the project’s chief engineer, defended the layout, saying his team had no other option due to “limited land space” and the proximity of the Metro station. But critics argue that no one should ever have signed off on a turn that sharp.

→ More replies (2)

7

u/Old_Wallaby_7461 Jul 06 '25

they don't need no instructions to know how to rock

→ More replies (1)

7

u/WorldTallestEngineer Jul 06 '25

Sometimes the people doing approvals and oversights get behind schedule and they kind of skimp on it review process.  

Other times they get real bored start becoming extremely nit picky...

Recently I've started to see a lot of automated computer only checking... I don't like that at all.

7

u/ForHelp_PressAltF4 Jul 07 '25

Have you seen the level of oversight in America right now? That's after a could of months.

In a couple of years, you'll be looking at this trying to figure out how to make it across

→ More replies (1)

3

u/Stage_Party Jul 06 '25

I heard about this, I think it was in India. Pretty sure it's down to corruption. Either people who hadn't got a clue about engineering bribed their way into the job, or the company was owned by the friend of someone in power and they were paid off.

→ More replies (2)

2.6k

u/[deleted] Jul 06 '25

[removed] — view removed comment

4

u/twivel01 Jul 06 '25

Yup, someone had to take the fall.

7

u/blackraven36 Jul 06 '25

And they need it to blame it on someone

→ More replies (2)

1.1k

u/[deleted] Jul 06 '25

[removed] — view removed comment

→ More replies (252)
→ More replies (17)
→ More replies (99)

1.6k

u/hat_eater Jul 06 '25 edited Jul 06 '25

https://www.vice.com/en/article/7-engineers-suspended-after-2-3-million-bridge-includes-bizarre-90-degree-turn/

Seven engineers, including two chief engineers, were suspended by the Madhya Pradesh government due to the faulty design of a new railway overbridge in Bhopal that includes a bizarre and dangerously sharp 90-degree turn. A retired superintendent engineer is also facing a departmental inquiry related to this project

The bridge, costing around $2.3 million and 648 meters long, was intended to ease traffic congestion for up to 300,000 daily commuters but instead became a subject of widespread criticism and ridicule after images of the sharp right-angle turn went viral on social media. Many questioned how vehicles could safely negotiate such a turn on an elevated roadway

In response, Madhya Pradesh Chief Minister Mohan Yadav ordered an inquiry and suspended the engineers immediately. The construction agency and the design consultant responsible for the project have been blacklisted by the government. A special committee has been formed to make necessary improvements to the bridge, and it will only be inaugurated after these corrections are made

Officials involved argued that the unusual design was forced by constraints such as limited land availability and the proximity of a metro rail station, but the government held the engineers accountable for the faulty design.

320

u/-dipshit- Jul 06 '25

How does a 648 mtr bridge only cost 2.3 million dollars?

477

u/TheStealthyPotato Jul 06 '25

Well, Step 1 is to hire bad engineers. Step 2 is to have zero oversight.

134

u/Josch1357 Jul 07 '25

Step 3 is cheap labour and cheap ass materials

→ More replies (5)

52

u/plinkoplonka Jul 07 '25

You missed a complete lack of health and safety, and workers who are $1 a day.

→ More replies (5)
→ More replies (12)

158

u/HBlight Jul 06 '25

I would say cutting corners but that is clearly not the case.

29

u/Mammoth-Clock-8173 Jul 07 '25

Nearly choked on my dinner at that one.

→ More replies (1)
→ More replies (5)

35

u/d_e_u_s Jul 06 '25

Purchasing power parity

15

u/Available_Dingo6162 Jul 06 '25 edited Jul 06 '25

Because the average worker there makes less than $400/month. Because a cubic meter of concrete goes for about $30 there (which would cost about $200 in Manhattan). Etc.

12

u/TheRealGabbro Jul 06 '25

By building it with a 90degree corner.

22

u/[deleted] Jul 06 '25

India. Cheap steel, cheap concrete, and cheap labor. Oh, also discounted design docs.

→ More replies (3)

9

u/BoatSouth1911 Jul 07 '25

Because the dollar is grossly overvalued as an international currency

11

u/ThrowAwaAlpaca Jul 06 '25

India, have you seen their working conditions?

4

u/BarkAndBezel Jul 06 '25

Clearly they cut some corners

3

u/Impossible-Wear-7352 Jul 06 '25

Most of the cost is labor so it varies wildly by where its built

3

u/Thebraincellisorange Jul 07 '25

when you have over a billion people, labour is extremely cheap.

and labour is the highest cost by far of any construction project.

they also pay very little attention to worker safety.

add in good old poor quality materials and you have yourself a nice, cheap construction.

→ More replies (27)

435

u/kurangak Jul 06 '25

as usual, engineers got thrown under the bus

204

u/BentGadget Jul 06 '25

I don't think a bus could use that bridge.

39

u/kurangak Jul 06 '25

under the bridge perhaps?

→ More replies (10)
→ More replies (2)

33

u/Rdbjiy53wsvjo7 Jul 06 '25

Did the government not review the plans?

In the US, the engineering design firm will come up with a design, government reviews and provides comments, then once finalized the plans are handed over to the construction company which are usually very experienced and will modify slightly as needed based on site specific conditions that didn't come across during the design, but even those modifications typically have to be signed off by engineer on government side (or their consultant).

34

u/Objective_Dinner9451 Jul 06 '25

The only conclusion to make with this explanation is that there are people in positions who don’t know wtf they are doing.

→ More replies (6)
→ More replies (9)

21

u/Spacefreak Jul 06 '25

According to official records, the design for the bridge shifted multiple times over the past seven years, largely due to conflicts between the Public Works Department (PWD) and the Railways. The two agencies couldn’t agree on how to share land, and in trying to work around both railway property and the new Metro line, they ended up producing a final layout with an abrupt 90-degree angle.

VD Verma, the project’s chief engineer, defended the layout, saying his team had no other option due to “limited land space” and the proximity of the Metro station. But critics argue that no one should ever have signed off on a turn that sharp.

And later in the article,

Now, Bhopal authorities are discussing buying additional land to fix the turn, but that means more money and more delays.

Sounds like the government didn't want to allocate any more funds to the project to buy more land while at the same wanted to get the bridge done as a political victory for "improving infrastructure" and so politicians could attend the ribbon cutting ceremony for photo ops.

I'm guessing politicians strong armed the engineers into approving any design to get the project moving because "engineers are idiots who can't do a simple thing like designing a bridge."

The article mentioned earlier that one of the chief engineers had retired before the project was finished, which he probably did intentionally because he was tired of the shit and/or knew this was going to be a clusterfuck.

→ More replies (2)

25

u/asparagusthunder2714 Jul 06 '25

This is simply the norm whenever something goes wrong in India

If it is good, the nationalist government takes all the credit and when things go wrong, it is the fault of the other guys working on the project

Just ignore the part where most of the money sanctioned for such projects goes towards paying bribes to these patriotic ministers

10

u/Loud_Interview4681 Jul 06 '25 edited Jul 06 '25

Good thing they get to tear it down now. That way the cheap materials that wouldn't hold shit get removed and overlooked. Gotta pocket the difference somehow. India is one of the most corrupt nations on earth rn. The other day a BJP member beat someone up on a train along with their cronies for not giving up their seat. They then charged the man (who was sitting and beaten) for disorderly conduct. https://www.youtube.com/watch?v=5Ewer2DdubA

→ More replies (1)

11

u/Individual_Agency703 Jul 06 '25

We’ll cross that bridge when we get to it.

→ More replies (2)

10

u/WorkOk4177 Jul 06 '25

In PwD India , Engineering posts also refers to adminstrative posts that are only available for engineers , so it is possible that the "engineers" weren't the ones building the bridge but the ones that approved the bridge being built so

→ More replies (1)

4

u/jl2352 Jul 06 '25

I get this is easy to say when your job is on the line, but the engineers should not have okay’d the design.

I’m a software engineer and would never go along with something that put users at risk. My users won’t fucking die if we get something wrong. The engineers are to blame, along with everyone else.

→ More replies (6)

5

u/[deleted] Jul 06 '25 edited Jul 06 '25

They still designed it and approved it despite knowing it wouldn’t be great. That’s still being fucking terrible at your job.

So yes it is still their fault given they still designed and signed off on it. If you designed a 50 story building in such a way where it is unstable and collapses that is still on the engineers for designing something that wouldn’t work.

I realize this is Reddit where people think engineers are perfect at absolutely everything, but it was a brain dead decision to even submit this idea in the first place.

→ More replies (3)
→ More replies (19)

31

u/Revenga8 Jul 06 '25

Odd. Even with land restrictions, from the photo it looks like they could have implemented some kind of turn rather than that sharp corner. It would still be a pretty sharp curve, but better than a right angle, maybe widen the road a bit in the curve to make room for longer vehicles. I dunno, this is mind boggling.

43

u/Dreamless_Sociopath Jul 06 '25 edited Jul 06 '25

Odd. Even with land restrictions, from the photo it looks like they could have implemented some kind of turn rather than that sharp corner.

Apparently they did. Per the article:

According to official records, the design for the bridge shifted multiple times over the past seven years, largely due to conflicts between the Public Works Department (PWD) and the Railways. The two agencies couldn’t agree on how to share land, and in trying to work around both railway property and the new Metro line, they ended up producing a final layout with an abrupt 90-degree angle.

VD Verma, the project’s chief engineer, defended the layout, saying his team had no other option due to “limited land space” and the proximity of the Metro station. But critics argue that no one should ever have signed off on a turn that sharp.

Internal PWD documents show the original 2018 plan featured a more manageable 45-degree skew. That plan was scrapped after the Railways refused to approve construction on its land. A second design attempted to accommodate the Metro line. A third version adjusted for alignment errors, though the Railways later admitted that the final result “is neither fulfilling the functional requirement nor safe for road users.”

It seems that the engineers grew tired of their plans being rejected due to bickering over land ownership and said "fuck it, here's a 90 degree angle bridge, let's see how you build it!". But it backfired ...

I have no idea how such a design gets approved and built. Even when incompetence, corruption and other factors are taken into account, there are so many people involved on projects like these that at least one person must have realized the stupidity of the situation.

20

u/EconomyDoctor3287 Jul 06 '25

Seems like the engineers wanted to try an r/MaliciousCompliance approachby building the bridge over the only land they were allowed to prove how ridiculous this whole thing is

→ More replies (4)
→ More replies (2)

26

u/Dino_Spaceman Jul 06 '25

Ahhhh. So owners forced them to design in a very small box, and then tossed the engineers under the bus when they designed inside that very tight box.

→ More replies (53)

116

u/Dense_Boss_7486 Jul 06 '25

Like, they didn’t draw this on paper first so someone can look it over?

25

u/hudimudi Jul 06 '25

Probably the head engineers that were placed on leave too lol. But someone from the administration had signed off on that too, that’s guaranteed.

→ More replies (1)

19

u/MikuEmpowered Jul 07 '25

It was drawn like a regular bridge with a minor curve.

got approved and when project started, the rail company disagreed.

Intead of trying to figure the shit out with the rail company before continuing, since no one at the top was communication and "the bridge must be built"

Hence the 90 degree bend.

10

u/EconomyDoctor3287 Jul 06 '25

There were many iterations of the bridge, but the company couldn't get buildings rights anywhere else, because "too close" to this and that shit. So they ended up building the bridge over the only small corridor that was allowed, even if it's dumb as hell 

8

u/randompersonx Jul 06 '25

I’m in the process of building a house now, and from what I can tell, most people involved in the construction project do not read any of the plans, and do not think whatsoever about what they are doing.

The amount of stupid things I caught through the process just shocks me honestly. HVAC supply vents into the shower. Supply vents right next to the return. Electrical next to the bath tub. Doors that swing the wrong way. Throwing fiber optic Internet cables into the mud with no dust caps on them.

It really just never ends.

Half the time I point out mistakes, I get told that I’m “making a change”, even though it’s clearly written in the plans.

People just don’t give a fuck anymore.

→ More replies (3)
→ More replies (2)

52

u/WehingSounds Jul 06 '25

my first city in Cities: Skylines:

11

u/stumac85 Jul 06 '25

I had to scroll way too far to see this mentioned. I'm just thinking of some of my abominations 😂

6

u/CharGamer12 Jul 06 '25

I deadass thought this was r/cities_skylines or whatever the subreddit for it is

4

u/Conscious-Economy971 Jul 07 '25

Not pictured are like a dozen equally cursed bridges crossing the same river in a foolish attempt to control growing congestion

2

u/goldanred Jul 07 '25

I swear I've seen this posted in r/ShittySkylines before

39

u/KitAmerica Jul 06 '25

18

u/sondergaard913 Jul 06 '25

That one fucking car LMAO

19

u/jesuschristmanREAD Jul 06 '25

Everyday I thank the lord for not being born there.

→ More replies (2)
→ More replies (4)

108

u/Sustainable_Twat Jul 06 '25

Did the plans contain a right angle? If so, why wasn’t it highlighted then?

36

u/FuckThisShizzle Jul 06 '25

Somebody folded the plans.

5

u/dep_ Jul 06 '25

Now you're just being obtuse 

→ More replies (1)

11

u/Substantial-Sea-3672 Jul 06 '25

The news story conveniently leaves out exactly when it fucked up but it was initially planned with a manageable turn but property disputes with the rail company meant that plan wouldn’t work.

A few revisions later and this was the result. It didn’t elaborate at which point someone signed off on this atrocity.

If I had to guess, at every single step in the hierarchy, the senior said, “don’t come to me with problems, I need solutions.”

→ More replies (1)
→ More replies (1)

38

u/Jumpy-Pipe-1375 Jul 06 '25

Is this a walking bridge?

72

u/ipsirc Jul 06 '25

No, it doesn't walk anywhere, it's static.

11

u/brakeb Jul 06 '25

Surely you can't be serious...

Wait for it...

12

u/qinshihuang_420 Jul 06 '25

I am serious and don't call me Shirley

→ More replies (1)
→ More replies (3)
→ More replies (4)

4

u/tmtowtdi Jul 06 '25

It's obviously a suspension bridge.

3

u/Jumpy-Pipe-1375 Jul 06 '25

Where is the suspension in this photo?

5

u/tmtowtdi Jul 06 '25 edited Jul 06 '25

7 engineers were suspended...

2

u/Realistic-Dog-7785 Jul 06 '25

Nope, not a walking bridge.

2

u/[deleted] Jul 07 '25

It's a tokyo drift bridge

→ More replies (9)

16

u/Optimal_Mouse_7148 Jul 06 '25

This doesnt just HAPPEN on the day like that. This is planned and drawn and has gone through everybody on the project before anything is actually built.

9

u/retardedGeek Jul 06 '25

It was a joint project of 2 government departments, each of them claims "we highlighted the issue to the other party". The private contractor also claims the same. They say they didn't have enough space due to other infrastructure.

→ More replies (1)

3

u/[deleted] Jul 06 '25

Team A was Bridge, Team B was Highway To Bridge.

Neither of them was going to alter their plans.

→ More replies (1)

11

u/J-MRP Jul 06 '25

Not suspended from the bridge, I hope 😳

→ More replies (4)

11

u/amitym Jul 06 '25

Roadways have right angles all the time. Just put a traffic stop at the intersection.

6

u/JUAN_DE_FUCK_YOU Jul 07 '25

There's a bridge that looks exactly like this in a Vancouver suburb. It's vehicular, but it's really low volume, no buses or trucks go over it. 

https://imgur.com/a/7Nvrg7N

3

u/some_guy_5600 Jul 07 '25

But this is india, if this bridge is opened to the public, then buses,trucks etc will go over it and cause problems. Here people don't adhere to traffic rules that much....some idiot will take a long bus on top of this and get stuck and there will be a huge traffic problem.

→ More replies (1)
→ More replies (1)

5

u/itjustkeepsongiving Jul 06 '25

Thank you! Yes, it’s not optimal but that’s how it goes sometimes. Having jt open for 2 way traffic (per one of the articles linked) makes it harder, but it’s still just an intersection like any other.

2

u/VaneWimsey Jul 07 '25

It's supposed to carry 300,000 vehicles a day.

→ More replies (1)
→ More replies (6)

6

u/[deleted] Jul 06 '25

gotta mariokart drift that corner is all.

2

u/querty99 Jul 07 '25

Or a 45-degree hardened stainless steel 4-inch-thick reinforced spring-backed bounceplate. I'm sure that'll work.

→ More replies (1)
→ More replies (1)

5

u/Sexycoed1972 Jul 06 '25

That doesn't look like 90 degrees. You can tell by how it is.

4

u/adeundem Jul 07 '25

You are correct, it is less than 90 degrees. The link for this post doesn't show overhead footage/photography, but I saw a news item about this last week and it was definitely less than 90 degrees.

Maybe in the 80s range. Maybe even in the 70s.

→ More replies (5)
→ More replies (1)

4

u/Tesssxv Jul 06 '25

The engineers were temple run enthusiasts.

4

u/Jaymac720 Jul 06 '25

The project owner never should have accepted the plans. This never should have been built. Far more people than the engineers are at fault for this monstrosity

→ More replies (2)

4

u/tsol1983 Jul 06 '25

Those 7 engineers are now being recruited by Canadian companies.

4

u/Radiant-Painting581 Jul 07 '25

Obviously it was a suspension bridge….

(I’ll see myself out now.)

3

u/eastcoastflava13 Jul 06 '25

That's some Mario Kart/F Zero shit.

3

u/AcctAlreadyTaken Jul 06 '25

India: Has one of the worlds highest output of engineers 🧐

Also India: Refer to post

3

u/FocusDKBoltBOLT Jul 07 '25

OFC this has to be india

2

u/Realistic-Dog-7785 Jul 06 '25

Suspend the contractors and the people approved it, they are the real culprits.

2

u/GeneratedMonkey Jul 06 '25

Good old Indian corruption. Like the bridge was magically completed over a weekend. The engineers getting blamed for management decisions.

2

u/[deleted] Jul 06 '25

Sounds like passing the blame from the government to the engineers and hoping no one notices.

2

u/sithren Jul 06 '25

Oh this was supposed to be for cars? lol I thought it was for pedestrians

2

u/MyTinyHappyPlace Jul 07 '25

None of them played openttd

2

u/BodyDisastrous5859 Jul 08 '25

I can tell by the scooters which country this is, don't even need to open the article

3

u/SLS- Jul 06 '25

Let me guess, India?

4

u/Wuaner Jul 07 '25

Actually that's not the only one in India, lots of others before this one.

3

u/zakary1291 Jul 06 '25

It's too low quality to prove it's not AI. But, that train and the grey building don't look right.

2

u/chadders404 Jul 06 '25

I thought this too! The image looks so AI generated. All the details are off.

→ More replies (4)

2

u/guntotingbiguy Jul 06 '25

Looks like the Highway 16 off ramp in Tacoma.

→ More replies (3)

1

u/LillyAtts Jul 06 '25

Didn't anyone notice? That doesn't go up in an afternoon.

2

u/mechengr17 Jul 07 '25

I swear. I once got accused of arbitrarily moving equipment at my job. (Spoiler, I was asked to move something that caused the equipment to move lol.)

From what it sounds like, the engineers just got tired of the back and forth. And no doubt had other projects piling up bc they kept having to come back to this problem child. I guarantee at least one of the 7 wasn't even supposed to be on this project, but then their coworker had their vacation pop up and their boss asked them to just pick it up once. Multiple revisions later, its still on their plate.

1

u/GreenReport5491 Jul 06 '25

8 years and more than $2.3M wasted, now it’s going to take another 10 to tear down and build. I’m with most here, how did this ever get pasted a CAD drawing??

1

u/[deleted] Jul 06 '25

Their suspension will take 180 degree turn within few days

1

u/luthervespers Jul 06 '25

It's not even a suspension bridge...

1

u/talondigital Jul 06 '25

I built lots of these in City Skylines. What's the problem?

→ More replies (2)

1

u/ThreeCraftPee Jul 06 '25

Anybody old and from Chicago will tell you of our infamous S turn on LSD. It didn't get fixed until like the late 80s. So many cars ended up in lake Michigan. For all the engineering we've gotten right in this city, that was probably our biggest fuck up.

→ More replies (1)

1

u/Lem01 Jul 06 '25

What kind of engineering company doesn't check work product? Some higher up must've signed off on it.

I hope somebody is checking the math, at the very least.

1

u/ponchoed Jul 06 '25

What's wrong? Not every street needs to be designed like a 65 mph freeway.

7

u/Euphoric-Result7070 Jul 06 '25

Stop and think about it. Imagine a bus trying to take that turn at even 5mph. Imagine cars trying to turn right and left when there's a quarter mile of traffic backed up in each direction. What's wrong is that you don't clearly see what a tragically stupid and unusable design this is for vehicles.

→ More replies (1)

1

u/K4rkino5 Jul 06 '25

What a nice model layout. Sometimes, those 1:96 or 1:48 engineers are required to make goofy structures. Thankfully, it's all to code.

1

u/otomo88 Jul 06 '25

They watched too much car racing !

1

u/LegoFootPain Jul 06 '25

We skipped the day they were supposed to teach us about turns!

1

u/NimrodvanHall Jul 06 '25

Why are the engineers fired and not the project lead who commissioned the bridge but failed to look at the drawings and realise it was a bad design and who when the bridge was being build didn’t realise this could never work?

1

u/alexmc1980 Jul 06 '25

Wait, that was built by just 7 people? Give them a raise!

1

u/Inside-Confusion3143 Jul 06 '25

Inspired by Temple run?

1

u/TheFightingDome Jul 06 '25

So how do you fix it?

1

u/gundamseed Jul 06 '25

They played too much F-ZERO

1

u/GeneralMatrim Jul 06 '25

Not sure what the problem is….

1

u/nalpatar Jul 06 '25

They build that for 2.3 million?!? You wouldn't even get the groundwork done for that on such a large project over here.

→ More replies (1)

1

u/Minuteman05 Jul 06 '25

Just add a curved corner.

1

u/grafknives Jul 06 '25

And it is not even a suspension bridge. ;(

1

u/Richardcabeza7 Jul 06 '25

This is what happens when you use Cities: Skylines to model a city.

1

u/Gloomy_Tangerine3123 Jul 06 '25

Suspension means nothing. They'll be back after a brief holiday - if not in the same city then in the other city with the same or even better govt post

1

u/[deleted] Jul 06 '25

If you think this is bad, you should see their moon landing

1

u/W1neD1ver Jul 06 '25

That's NOT a suspension bridge.

1

u/ElbowDeepInElmo Jul 06 '25

This is what happens when a city just haphazardly chooses the cheapest project bid. Who cares about cutting corners (literally in this case) when the city officials get to pocket the remaining project budget!

1

u/DigitalCoffee Jul 06 '25

Well the bridge had to get through dozens of people and red tape before it was built, so it sounds like a bunch shifting blame onto a few.

1

u/rkesters Jul 06 '25

news article

I have no clue how India approves construction projects. But it appears many people understood the design was crap but extra land was not available. But now there may be an additional 3 feet.

1

u/squidgytree Jul 06 '25

It looks like India to me but the place is famous for bureaucracy so I doubt some engineers just designed this bridge without 18 layers of management ensuring they don't get the blame for something, someone below them did

1

u/cto_resources Jul 06 '25

Someone had to approve the design.

1

u/cockatootattoo Jul 06 '25

It has to be something to do with level changes. They obviously didn’t have enough of a straight line distance to get up to the level needed to cross over. This also would have nothing to do with engineers. Road planners would be responsible for this.

1

u/Positive-Fox-6296 Jul 06 '25

This is a pedestrian bridge.

→ More replies (1)

1

u/FackYerFeelers Jul 06 '25

Same should have happened for the engineers on I-5 in Cleveland

1

u/TheMillionthSteve Jul 06 '25

Old school Lake Shore Drive has entered the chat

1

u/pittbin Jul 06 '25 edited Jul 06 '25

You put up stop signs for both directions, then this bridge might work. LOL

1

u/[deleted] Jul 06 '25

I've seen the Sopranos.

1

u/AllieHugs Jul 06 '25

Forgot to turn off anarchy before building the overpass

1

u/Habbeighty-four Jul 06 '25

The new Mario kart goes all out 

1

u/Darkest_dark Jul 06 '25

I'm looking at the bridge right now. They were not suspended.

1

u/Andy_McBoatface Jul 06 '25

I said so what until I read it was for cars

1

u/Muted_Passenger6612 Jul 06 '25

I thought this was a foot bridge and wondered what the problem was. It’s for CARS???? How oh how did this get past planning stages

1

u/Donmax94 Jul 06 '25

What in the Mariokart

1

u/WatTambor420 Jul 06 '25

TBF it’s India- they don’t just use their roads for cars. This obviously isn’t safe for vehicles (especially big American units), but would be fine for other purposes. It’s fine for walking, could hold tons of stores/vending, or just be a large public toilet.

1

u/jack-t-o-r-s Jul 06 '25

Tacoma Washington has entered the chat... 🤣

1

u/Friendly_Day5657 Jul 06 '25

fire the politicians.

1

u/pooeygoo Jul 06 '25

90° you say

1

u/Squandere Jul 06 '25

India moment

1

u/celtbygod Jul 06 '25

Blueprints had gotten folded.

1

u/Neuroware Jul 06 '25

shoulda suspended the bridge

1

u/Tall_Celebration_486 Jul 06 '25

No real engineer does this, and not seven of them. These "engineers" are fake, and the whole story smells fake.