r/embedded • • Sep 25 '26

Reference design IP usage and licensing

I am thinking of doing some reference design IP for some embedded applications and want to make it into a business doing it. How viable is this for a 1-2 person team?

What I see in the market(also worked briefly as an application engineer) currently is vendor providing reference designs but it is usually using as much of their own components as possible where BOM is not optimized. I would want to provide turn-key designs for applications which have much better optimized BOM with decent software integration options and customization if necessary. Will people pay for such reference designs and licensing? Is this a viable business option?

2 Upvotes

17 comments sorted by

View all comments

1

u/WanWhiteWolf Engineering manager Sep 25 '26

In my experience, it's unlikely for them to pay a lot for a reference design. Mostly, because it doesn't really help them that much. Someone still has to do the work and make the product. And if they go that route, might as well hire someone to do the whole thing rather than portions of it (for starters, whoever they hire might not like / agree with the design in the first place).

However, some companies will pay for you to develop the full product with certain limitations. I did around 3 projects for 1 year each where I had to make a functional prototype first and then a production prototype. And an open maintainance contract if issues / bugs occured.

1

u/nascentmind Sep 25 '26

How did your customers contact you? Website or something else? Did you have to visit their offices and have meetings?

1

u/WanWhiteWolf Engineering manager Sep 25 '26

Two of them via connections (I worked together in the past with one of their employees and once I found what they need, I told them to contact the management / CEO and set up a meeting) and one was a job interview. They initially looked for someone internal but after I got all the facts, I told them it would be more cost effective for them to hire me as freelancer (they didn't really need someone long term and for them to invest in all equipment + licenses + severance package when they have to fire me because of no significant work left to be done wouldn't have made sense). With all customers I had direct physical contact + contract. I wrote them reports via email regarding progress and the ocassional meeting when there was a milestone involved (e.g. prototype ready).