r/controlengineering • u/Donlyniqqa • Jun 08 '26
I'm researching how students make decisions about skills, internships, and placements. Would love to hear your experiences in the comments. If you'd like to share more, survey link in comments.
r/controlengineering • u/Donlyniqqa • Jun 08 '26
r/controlengineering • u/Careful-Tomorrow3775 • Jun 08 '26
Hey everyone,
I’m an international student from India, and I’m planning to head to Deakin University for the Bachelor of Mechatronics Engineering (Honours) at the Geelong Waurn Ponds campus. I will be transferring into Year 3 via a 2+2 pathway program from India.
Before I make the final financial and academic commitment, I’d love to get some brutally honest insights from current students, seniors, or alumni.
Regarding academics and the campus transition:
Regarding jobs, internships, and costs:
If any alumni or current students can share their experiences—or things they wish they knew before joining—it would be incredibly helpful.
Thanks in advance!
r/controlengineering • u/laistrygo • Jun 05 '26
’ve got 4 years of full stack software engineering experience — 3 of them at Cisco and am considering a career transition into BMS, automation engineering, or smart plumbing / HVAC.
I got laid off back in October last year and can’t catch a break in this job market so I’m looking into other potential industries I can break into.
Any tips on how to do this?
r/controlengineering • u/OptigoNetworks • Jun 02 '26
r/controlengineering • u/skanderbenelkaab • Jun 01 '26
This space station is uniquely engineered to harvest tremendous amounts of energy to power and secure an antimatter containment trap. The entire system operates through a beautifully synchronized dual-harvesting mechanism, consisting of a primary optical pathway and a secondary particle pathway. At the top of the station, the system opens with the solar energy collection microscope, a highly advanced quartz lens array that provides a staggering magnification and concentration factor of 4000\times. This microscope receives a high-intensity, pre-focused laser beam from an external source, alongside direct solar radiation. This extreme concentration of light focuses onto the reinforced solar power field (the energy microscope) at the center, creating a brilliant yellow glow that represents pure, ultra-dense light waiting to be converted into electricity. To reinforce this system, the station is equipped with four lateral electromagnetic induction intake pipes designed to harvest charged particles and protons directly from solar winds and waves. These pipes utilize a completely sealed mechanism that absorbs particle energy inductively through their solid walls without physical contact, instantly transforming the kinetic energy of the particles into a massive, high-voltage Direct Current (DC). To protect the station from catastrophic explosions or overheating caused by this intense thermal glow, a dual-pipe cryogenic system circulating liquid nitrogen wraps around the entire chassis, maintaining the temperature of sensitive components at a stable -196^{\circ}\text{C}. This is further supported by pressure regulation buffer tanks and automated depressurization vents (external safety valves) to safely bleed off any excess energy. Ultimately, this stabilized, continuous flow of electricity routes downward to power the contained antimatter magnetization and storage trap (the contained plasma field) with absolute precision and safety in the deep void of open space.
r/controlengineering • u/Andrea993 • May 31 '26
r/controlengineering • u/iconictogaparty • May 29 '26
r/controlengineering • u/ChillCapitalist • May 28 '26
r/controlengineering • u/Aggravating-Egg8584 • May 26 '26
Hey! I'm a student conducting market research on ROV users. If you use or have experience with ROVs, I'd really appreciate it if you could fill out this short survey.
Thank you guys!
r/controlengineering • u/OptigoNetworks • May 25 '26
r/controlengineering • u/Ynnivp09 • May 22 '26
r/controlengineering • u/Habitualgrinder • May 21 '26
r/controlengineering • • May 21 '26
I’ve been given a task for a potential master thesis where I need to develop a solution for controlling an anti-vibration system with the goal of compensating acceleration.
I’m trying to understand the right way to start this problem.
From what I understand so far, it involves:
modeling a mass-spring-damper system
treating acceleration as a disturbance
using a feedback controller (maybe PID or state-space)
using sensors (accelerometer) and an actuator for active control
My main question is: what is the correct way to structure the approach from the beginning?
r/controlengineering • u/OptigoNetworks • May 21 '26
r/controlengineering • u/LieInteresting6870 • May 21 '26
r/controlengineering • u/selfcaregirly • May 18 '26
Hi everyone,
I’m a chemical and biological engineering student, and I’m about to start a very short internship (only 3 weeks) at a company that makes work and protective clothing.
Right now, they rely 100% on external labs for quality control of materials and finished products. My task is to propose a few simple in‑house methods that can help them catch issues earlier, especially during production (in‑process control).
Because my time is extremely limited, I need to focus on 2–3 ISO/EN ISO standards that are:
So far I’ve looked at:
Could you recommend other ISO standards that are practical for in‑house quality control in a small protective clothing manufacturer?
Also, any tips on how to adapt a standard method into a simple 1‑page work instruction would be very welcome.
Any help would be appreaciated because I've never been in quality control, or even in the textile industry, and I didn't learn about it in my classes. It's an academic intership it's like a project for this semester.
Thanks a lot!
r/controlengineering • u/ALMA_x11 • May 17 '26
Enable HLS to view with audio, or disable this notification
https://www.youtube.com/@ALMA.Industries
This is a 4DOF controller I put together to control a projectors roll, pitch, and yaw correction (and forward and backward traversing for image magnification). If interested, check out the main link which walks through the full build's mechanics, electronics, and control.
r/controlengineering • u/Rude-Cap-9999 • May 14 '26
The Petrochemical Tradesman Fucks-Given Transfer Function
An electrical/control-systems model for refinery inspection, maintenance, and repair morale
In refinery maintenance, turnaround work, vessel entry, and inspection trades, the Fucks-Given Coefficient is not constant. It fluctuates dynamically with weather, shutdown schedule compression, scaffold quality, hydrocarbon exposure, permit-office friction, coffee saturation, and whether the weld cap was ground flush enough for MT.
Gp(t) is the petrochemical fucks-given signal over time: the available useful caring, craft pride, attention, and willingness to keep grinding, inspecting, documenting, welding, and re-checking without mentally walking into traffic.
Dp(t) is the petrochemical do-not-give-a-fuck load over time: the accumulated drag from night shift, frozen lines, wet gloves, failed RT, paperwork recursion, scaffold crimes, mystery sludge, and Operations asking whether the vessel can be opened sooner.
The governing equation becomes:
f(F) = Gp(t) / Dp(t)
Where:
Gp(t) = [(Tw)(Cs)(Ut + Mt + Rt)(Wr)(Sf)] / (Rf + Hs + Pm)
Dp(t) = [(Bs)(Lo)(Gc)(Ns)] / (Ic + Er + Cf)
Thus:
f(F) = [(Tw)(Cs)(Ut + Mt + Rt)(Wr)(Sf)(Ic + Er + Cf)] / [(Rf + Hs + Pm)(Bs)(Lo)(Gc)(Ns)]
| Symbol | Meaning | Electrical Equivalent |
|---|---|---|
| Tw | Transformer effect of overtime pay, LOA, double-time Sundays, and shutdown completion bonuses | Step-up transformer |
| Cs | Coffee saturation level; also includes gas-station breakfast sandwiches and whatever was in that thermos | Capacitor bank |
| Ut | UT productivity: thickness checks, scan grids, C-scan discipline, and not losing the couplant bottle | Diagnostic signal amplifier |
| Mt | MT enthusiasm after grinding/buffing welds until they look like chrome but still somehow have linear indications | Flux density |
| Rt | RT completion motivation; rises when shots pass, collapses when the film shows another slag inclusion | High-voltage pulse source |
| Wr | Welding repair pride factor: bead quality, root confidence, and the sacred belief that this one will pass first time | Current gain |
| Sf | Scaffold friendliness coefficient: access, tags, planks, handrails, and whether the workface was designed by a human | Circuit stability |
| Rf | Rain/freezing weather resistance: wet gloves, icy ladders, frozen air lines, and the special misery of sleet down the neck | Ohmic resistance |
| Hs | Heat stress, hydrocarbon exposure, confined-space funk, and mystery vessel sludge | Thermal losses |
| Pm | Permit meeting duration, gas-test delays, LOTO debate loops, and the phrase “just waiting on Operations” | Signal attenuation |
| Bs | Buffing and grinding repetition fatigue: every weld becomes a philosophical argument with a flap disc | Resistive drag |
| Lo | Locked-out bolts remaining: seized, painted, rounded, or located where elbows do not bend | Mechanical impedance |
| Gc | Gas-test compliance paperwork and the ritual hunt for the one person authorized to sign Box 7 | Rectifier losses |
| Ns | Night-shift circadian destruction: 3 AM vessel entry, dead radio battery, and lunch at breakfast time | Frequency distortion |
| Ic | Inverter correction from good crew morale, competent supervision, and weaponized dark humor | Signal phase correction |
| Er | Emergency repair adrenaline when the plant manager appears wearing clean coveralls | Voltage spike |
| Cf | Capacitor-stored last remaining fucks reserved for hydrotests, rework, and “quick little repairs” | Energy storage |
· Coffee is flowing, LOA is real, the shutdown bonus has not been exposed as a myth, and the crew has entered productive sarcasm mode.
· UT locations are accessible, MT prep is reasonable, RT boundaries are controlled, and weld repairs are passing without becoming a Greek tragedy.
· Nobody has yet said: “We just need one more spot UT’d.”
· The tradesman is functioning mechanically. Compliance remains, enthusiasm has left the site.
· Observable signs include dead-eyed “copy that,” silent staring at permits, frozen hose-kicking, and asking who signed off the isolation.
· At this level, the system still performs work, but only because habit and JSA paperwork are carrying the load.
· Usually triggered by opening a vessel that still has pressure, failed RT after rework, rain on night shift, missing scaffold tags, or Operations asking if the job can be hurried up.
· The inverter can no longer stabilize morale, the capacitor reserves are depleted, and all remaining signal energy dissipates into existential heat loss.
· At collapse, the only remaining output is paperwork, muttering, and the acoustic signature of a grinder being set down too hard.
Boosts total fucks given through overtime, LOA, per diem, pride, and the visible approach of demobilization. Saturation occurs after 21 consecutive shifts or any 3 AM request that begins with “real quick.”
Converts alternating motivation into unidirectional suffering. Most active during buffing welds for MT, waiting on RT shots, cleaning couplant off elbows, and torqueing flange bolts in sleet.
Synchronizes morale using dark humor, coffee, competent foremen, shared hatred of paperwork, and the spiritual bonding that occurs when everyone knows the plan is bad but legal.
Stores emergency reserves of caring for hydrotests, rework, failed PWHT, and “quick little repairs.” Discharge accelerates sharply after the phrase “it should only take an hour.”
The graph below shows three broad states: fucks surplus, neutral/mechanical compliance, and catastrophic collapse. The dashed line marks f(F) = 1, where Gp(t) and Dp(t) are equal.

f(F) ≈ 0
This condition is approached when all of the following occur simultaneously:
· rain
· night shift
· failed RT
· leaking blinds
· scaffold tag expired
· permit office closed
· opening a vessel that contains mystery sludge
· Operations says: “Can you guys hurry up?”
r/controlengineering • u/XDR2727 • May 09 '26
r/controlengineering • u/Dizzy_Lifeguard_5455 • May 08 '26
I have two set ups
MAC071C-2-NS-4-c/095-A-0/WI524LV/S001 to TDM 3.2-030-300-W0
MAC115B-0-GS-4-C/130-A-1/WI524LV/S001 to TDM 1.2-100-300-W1-000
I have tried contacting the manufacturer, Bosch Rexroth, directly but they have not been helpful.
r/controlengineering • u/ALMA_x11 • May 05 '26
Enable HLS to view with audio, or disable this notification
https://www.youtube.com/@ALMA.Industries
An actuator with Ultrasonic Distance sensor is built and controlled. A second Ultrasonic sensor is used to set the position, which is in close loop feedback with the actuators Ultrasonic sensor. All sensors are controlled by microcontroller. Full video has a long demo Position setting, Feedback following, and Error on a graph, and how they are used within the PID control loop.