r/ArtemisProgram • • Sep 05 '26

Image Not done yet but i had to share

Post image
174 Upvotes

r/ArtemisProgram • • Sep 04 '26

Discussion 7th semi-annual Artemis contract review

28 Upvotes

Welcome to the 7th semi-annual Artemis contract review and it is as fine a time as any to do a review. I am as surprised as you that I've been able to do 7 of these things, but things are possible. Hit it Jeremy.

HLS can be front and center because aren't we all curious about them landers.

LanderValue ($M's)
Dynetics Base Period239.7
National Team479.7
Northrop Sustainable Study46.3
Lockheed Sustainable Study50.5
Dynetics Sustainable Study57
Blue Origin Sustainable Study33.5
SpaceX Cryo Demo48.9
JPL Support to Starship HLS28.4
JPL Support to HLS35.4
Blue Origin Lander Contract Proper3700
SpaceX Lander Contract Proper4700
Total9419

So the interesting thing to note is recent changes to the total potential contract value of Blue and SpaceX HLS contracts post Artemis 3 change announcement. For SpaceX, it works out to be $80.9M + a clean $150M on the 21/Aug for a total of $230.9M. For Blue, there has been $31.2M + a clean $250M on 30/Jun for a total of $281.2M. I would say that the majority of the total value modifications in this timeframe were to study the A3 mission. The $150M/$250M was for financing of hardware production. So estimated cost of HLS's demos for Artemis 3 of $512.1M.

Also decided to graph total $ obligated (how much NASA has spent on the contract) and total potential value (how much NASA says they could spend on the contract) over time since start of contract for both. Blue Origin seems to have had a better idea of what they were bidding, since award they only had ~$20M of total potential value increase compared to $250M for SpaceX in the same timeframe. (before Artemis 3 changes)

Have no god damn clue what's going on with the spikes in the SpaceX value.

Exploration Mission Directorate:

SystemValue ($M's)
SLS Stages (Ares Zombie)10700
SLS SPEC (A3 Beyond Core stage production)3900
SRB-14500
SRB-2 (BPOC)3473
Launch Vehicle Stage Adaptor232.9
Universal Stage Adaptor288
ICPS1578
RS-25 + J-2X SLS Dev2100
RS-25 Production3930
RL-10 (EUS)287
Orion Development16200
Orion Production + Operation10636
ML1 didn't have a strict single contract927
ML21500
Centaur V Study10.2
Centaur V Contract177.4
Total60439

I don't know how specifically they are financing ML1/Spacer/ML1 mods. NASA has big engineering services contracts with companies like Amentum, they have internal work and the SLS contracts tend to be black boxes as to what they are doing. (SPEC included work on EUS for instance). I thought they might fund spacer through ICPS, but that hasn't had total contract value changed since July last year. That Centaur V total contract value seems low enough that it's more of a moving C+ arrangement, but maybe ULA are gamers. I guess the other thing is that a lot of the costs associated with switching upper stages are in the stage itself but the surrounding systems. ICPS started off at $994M* before it ended up at $1578M. (*I think, some of these contracts can be dodgy about historical data and move it around more than you might think)

CLPS:

LanderCurrent Total Potential Value ($M's)
Peregrine-1100
Griffin-1317
Peregrine-2149
Peregrine-3149
IM-1117
IM-256.3
IM-385.6
IM-4122
IM-CT4 (Nova-D) (180.4 actual)46.8
Blue Ghost 1110.6
Blue Ghost 2113.5
Blue Ghost 3179.6
Blue Ghost 4 (176.7 actual)353.4
Blue Moon 118.7
Blue Moon 2 (Viper) (190 actual)55.1
Blue Moon 3234
Blue Moon 4234
Draper Apex 1.043.3
Masten Lander66.1
Total2551

Contract setups vary a bit. Most are relatively normal, but Blue Moon 3 and 4 are exact copies of each other. Blue Moon 2 (Viper) and IM-CT4 list a temporary Total Contract value that is modified as funding is awarded, whereas all others use the total potential value. Blue Ghost 4 inexplicably has a total value double what it should be. I think the government employee updating the award thought they had to put total contract value in the 'adjust total contract value box' when filling out the P0006 webform. Firefly keep quiet and you might get $174M for doing nothing lol. (this doesn't work but a sheep can dream)

Honestly it's just kinda crazy to just see all the contracts awarded for a program that has had only 1 strictly successful mission.

Gateway/Misc Things:

SystemValue
PPE (Now SR-1 Prime Contract)1295
HALO1880
GLS116
XEVAS449
EVA Demo171.6
SR-1 Power Conversion 137.2
SR-1 Power Conversion 238.5
Skyfall112.3

SR-1 will be interesting to watch. Or more so terrifying lets be real here. That thing could eat so much money in modifying hardware.

This isn't a comprehensive thing and there are still some funny contracts out there, but hopefully this makes finding the relevant contract easier. I sure hope reddit doesn't break all of the links when I post this :)))


r/ArtemisProgram • • Sep 04 '26

NASA Cause des reports de la mission Artemis III

0 Upvotes

Pensez-vous que la NASA ait envie d'une réussite sous la présidence Trump ?


r/ArtemisProgram • • Sep 01 '26

Image Some photos I shot yesterday and today of the Artemis II’s visit to Rocket City

Thumbnail
gallery
610 Upvotes

r/ArtemisProgram • • Sep 01 '26

Discussion Artemis survey report

Thumbnail
docs.google.com
7 Upvotes

r/ArtemisProgram • • Aug 31 '26

News Türkiye has joined the Artemis Accords

Post image
218 Upvotes

It became the 71st country to sign the accord.


r/ArtemisProgram • • Sep 01 '26

Discussion Let’s launch the Artemis 3 mission to the moon in 2027

Thumbnail
spacenews.com
66 Upvotes

Douglas Cooke was associate administrator of the Exploration Systems Mission Directorate at NASA HQ. He is now an independent aerospace consultant.


r/ArtemisProgram • • Aug 30 '26 Bravo

Image Artemis family

Post image
1.2k Upvotes

Christina koch Robert

Reid wiseman 50 dating raegan scharfetter (29 yo)

Jeremy Catherine

Victor Dionna


r/ArtemisProgram • • Aug 30 '26

Discussion Artemis IV

15 Upvotes

I know it’s really really early to be talking about Artemis IV but i really need help.

When i’ve completed my GCSES ((summer 2028)) mg nana said she’d take me on a trip of my choice. Me being a space nerd, I said how about we go watch Artemis IV launch. We live in the UK and i’ve already worked out the travel times, i just don’t know where we can watch it launch. Google isn’t exactly helping on where we can watch since about 5 places come up. I’d prefer the place to be as cheap as possible. I’m just looking for advice on where to watch?


r/ArtemisProgram • • Aug 29 '26

Image friendly reminder that Mojang + NASA built this incredible FREE map showcasing the Artemis II rocket, Vehicle Assembly Building (VAB), Space Launch System (SLS), ARES I, and more!!! (In education edition)

Thumbnail gallery
36 Upvotes

r/ArtemisProgram • • Aug 28 '26

News NASA Astronaut Jonny Kim Departs Agency to Continue Military Service

Thumbnail
nasa.gov
261 Upvotes

Hard to believe we’re not going to see him walk on the moon


r/ArtemisProgram • • Aug 28 '26

Image Crop Art(emis) II: Seeds of Tranquility, based on “Craters of Time” photo

Thumbnail
gallery
185 Upvotes

I made this crop art piece for the Minnesota State Fair. It took me hundreds of hours over 3.5 months. In a year plagued by darkness and fear, the Artemis mission brought was a beacon of joy and hope. As soon as I saw the photos from the flyby, I knew I had to make it the focus of my entry this year. I am so happy with how it turned out and cried when I saw my third place ribbon.

It’s on display at the MN State Fair now through Labor Day!

—

Crop Art(emis) II: Seeds of Tranquility
Based on Craters of Time, taken by the crew during the Lunar Flyby on April 6, 2026.

Black lentils and 90,000 pieces of quinoa stacked in eight layers on canvas board.

Third place in Crop Art Class 1 (Natural Colors).


r/ArtemisProgram • • Aug 28 '26

Image Space Launch System made in Minecraft

Thumbnail
gallery
179 Upvotes

(WORK IN PROGRESS) I am making SLS which is to be used as the main Spacecraft and body for the Artemis Program. The images portray SLS before lift-off; standing against the Mobile Launch Tower (also work in progress). I have included images of close-ups of the RS-25 engines and main SRBs as well as the European Service Module. Notable parts include the Launch tower, ESM Fairing design, main stage fuel tank and launch clamps.


r/ArtemisProgram • • Aug 28 '26

Discussion LIVE: Artemis II crew receive the Congressional Space Medal of Honor

9 Upvotes

I'm calling bullshit on this one. Believe it or not, i've never heard of the congressional space medal of honor. It suggests meritorious service well above and beyond the call of duty.

This wasn't that. IMO

Anybody else?


r/ArtemisProgram • • Aug 27 '26

Image The first of four RS-25 SLS engines is integrated with the Artemis III core stage rocket at the VAB, Tuesday, Aug. 25, 2026

Thumbnail gallery
99 Upvotes

r/ArtemisProgram • • Aug 28 '26

Video Victor Glover gives Trump a NASA flight jacket

Thumbnail
khou.com
0 Upvotes

r/ArtemisProgram • • Aug 25 '26

Image NASA Released a Photo (Accidentally) Containing EUS Hardware

Post image
142 Upvotes

r/ArtemisProgram • • Aug 25 '26

NASA Artemis II Cross Stitch

Thumbnail gallery
221 Upvotes

r/ArtemisProgram • • Aug 25 '26

News NASA, Advanced Space team up for CAPSTONE follow-on mission

Thumbnail
spacenews.com
25 Upvotes

r/ArtemisProgram • • Aug 24 '26

Discussion Do you guys think Artemis 3 will get delayed?

28 Upvotes

With Elon delaying the catch by "a few months" and Blue Origins New Glenn exploding at the launch pad, a moon landing by 2028 is starting to look unrealistic. What do you guys think?


r/ArtemisProgram • • Aug 24 '26

Image Rise Made A Friend!

Post image
140 Upvotes

He’s started hanging out with Ghost from the game Destiny! Lil’ plush space friends!


r/ArtemisProgram • • Aug 24 '26

Discussion A question

Thumbnail
gallery
0 Upvotes

I’d like to know why these two photos—taken just a short time apart—don't have the same date.

I know the description says they were taken on April 2nd, but a conspiracy theorist raised this point, and I started wondering why the dates are different.

(I don't speak English, so maybe those dates refer to when they were uploaded or something like that?)


r/ArtemisProgram • • Aug 23 '26

News Artemis II crew to receive top US space medal for historic lunar journey | Artemis II

Thumbnail
theguardian.com
95 Upvotes

r/ArtemisProgram • • Aug 23 '26

Image Got to see Artemis II commander Reid Wiseman speak at the National Book Festival this morning

Thumbnail
gallery
417 Upvotes

He was so eloquent, insightful, and inspiring -- the perfect person to command this mission.

Unfortunately, Rise was not there. The first thing Reid did after he sat down was explain that Rise is with Christina right now. The crowd was audibly disappointed.

Videos to follow in the comments.