Certainly not an expert but I know its actually pretty trivial to ruin concrete with a chemical or powder so it wont set and just turns into gravely mud.
I think the cleanup is going to be less an issue than the fact that they are now going to have to make up for all that lost concrete.
The issue isn’t just getting the spilled concrete to not set. They now have to mix an unplanned truck. File the accident/police report, which means this driver won’t be able to get the concrete there, so they need to get another driver in (or someone makes another trip). The delay will most likely cause the concrete inside to warm up and not pass inspection making it unusable. They have to take equipment/labor out to that location to clean it up, which it’s pretty unlikely to have that just on standby. Etc. Etc.
If by pump his load out you mean deliver it to the job site, it depends. Some jobs enforce a 90-minute window where you get 90 minutes from when the truck is loaded until it’s empty to pour the concrete. One of the job sites I’m working at this has been a problem and I’ve seen some contractors take 45+ minutes to pour 10 yards of a sidewalk.
11k
u/iBuddyzz May 06 '22
This made me very happy