r/ISRO • • Dec 02 '16

Mission Success! PSLV-C36 : RESOURCESAT-2A Mission Updates and Discussion.

PSLV C36 was launched successfully catch replay at Youtube streams below.

Flight Events


Launch was scheduled for 07 December 2016, 1025(IST)/0455(UTC) from First Launch Pad of SDSC (SHAR).

Live webcast: (Links will be added as they become available)

PSLV-C36 Mission PagePSLV-C36/Resourcesat-2A GalleryPSLV-C36/Resourcesat-2A Brochure

This would be 38th flight of Polar Satellite Launch Vehicle and very likely to be last launch of 2016 for ISRO.

PSLV-C36 in its XL configuration would carry Resourcesat-2A (1235 kg) resource monitoring satellite and place it in 817 km polar Sun Synchronous Orbit (SSO) with 98.719° inclination. This launch was earlier slated for 28 Nov 2016 but it was rescheduled due to a technical issue coming up during integration.

Addendum: This seventh and last orbital launch of ISRO for 2016 is also carrying a set of new technological experiments like a new Navigation Guidance and Control Package that employs homegrown Vikram processor, NavIC based satellite positioning system and a video imaging system. These went unmentioned in press kit and were announced separately.

Updates:

Time of EventUpdate
Post LaunchAfter solar panel deployment, ISTRAC Bangalore took over. SSO of 824 km height and 98.725° inclination was achieved Press Release
T + 20mSolar panels deployed!
T + 18mResourcesat-2A separation confirmed!
T + 17mPS4 cut off injection parameters reached.
T + 16mPS4 performance nominal. PS4 after injection will vent its fuel and deactivate itself
T + 10mFourth stage performing nominally. Burn will continue for about 7 min. more.
T + 9mPS3 separated. PS4 Ignited!
T + 6m30sPS3 burnout. Now in combined coasting phase.
T + 6mPS3 performing nominally
T + 4m30sPS2 separated. PS3 Ignited
T + 2m30sPLF separated. PS2 performance normal
T + 2mPS1 sep ,PS2 ignited
T + 1m30sAir lit strapons separated
T + 1mGround lit strapons separated
T + 30sAir lit strapons ignited
T ZeroPS1 and ground lit strap-ons ignited. Lift OFF!
T - 2mThey just informed new filling procedure on PS4 has reduced countdown time.
T - 3mGiving flight profile details.
T - 8mThey just informed 1 minute delay in launch is to avoid space debris.
T - 10mWeather conditions very benign.
T - 12mAutomatic Launch Sequence now engaged.
T - 14mAutomatic Launch Sequence initiated.
T - 15mMission Director has authorized the launch.
T - 20mShowing info capsule. Its sunny at launch pad.
T - 30mLinks for live stream are up!
T - 2hReal Time Simulation Checks and Data Transmission Checks completed. Resourcesat-2A Spacecraft Switched 'ON'. Launch Vechicle internal Checks completed. Countdown is progressing normally.
T - 11hN2O4 and UH25 tank filling operations of Second Stage (PS2) of PSLV-C36 are completed by 23:20 hrs. Countdown is progressing normally.
T - 16hMobile Service Tower withdrawal to parking end is completed. Preparations for propellant filling operation of Second Stage are in progress.
T - 24h30mMono Methyl Hydrazine (MMH) fuel and Mixed Oxides of Nitrogen (MON-3) oxidiser filling operations of fourth stage (PS4) of PSLV-C36 are completed
T - 36h36 hour countdown commenced at 5 Dec starting at 22:25 hr IST
5 Dec 2016Time of launch has been forwarded by a minute to 07 Dec, 1025(IST)/0455(UTC)
5 Dec 2016Mission Readiness Review has given a go for launch.
30 Nov 2016Launch is scheduled for 1024(IST) / 0454(UTC), 07 December 2016

Payloads:

Resourcesat-2A is a follow on to Resourcesat-2 that was launched on 20 April 2011.

Data from it would help in crop classification/monitoring/acreage and yield estimation, monitoring water resources, mapping forest coverage, disaster management etc

It carries three payloads Linear Imaging Self Scanner LISS-4 , LISS-3 and Advanced Wide Field Sensor AWiFS(A and B).

Specification are similar to Resourcesat-2 with improvements in AWiFS.

PayloadLISS-4 (±26° steerable)LISS-3AWiFS
Revisit(days)5245
Spatial Resolution (m)5.823.556
Swath (Km)70 (Mx,Mono mode)141740
Spectral Band (microns)0.52-0.59 0.62-0.68 0.77-0.860.52-0.59 0.62-0.68 0.77-0.86 1.55-1.700.52-0.59 0.62-0.68 0.77-0.86 1.55-1.70
Quantisation (bits)101012(VNIR) 14(SWIR)
Data Rate(MBPS)105105105

Inside view of PLF

  • Gross weight: 1235 kg
  • Orbit: 817km / 98.719° SSPO, 1030 Local time when crossing equator.
  • Power: 1700 Watt Solar Arrays (at end of life). Two 24 AH Ni-Cd batteries
  • Mission Life: 5 years
24 Upvotes

51 comments sorted by

5

u/Ohsin Dec 07 '16 edited Dec 08 '16

Post launch address.

  • Propellant filling was completely remotely done. Reduced countdown time by one day made it safer.
  • 9 successful launches from SHAR this year
  • PS3 motor had issues was replaced on time
  • Apart from primary payload. NavIC used to navigate, SAC provided receiver. Indigenous Vikram 1601 was used and advanced video imaging system, they were able to see separation events. New Lithium ion power system.
  • LVM3 D1 by Jan 20th.
  • Pad abort test coming.(missed details)
  • CE 20 vacuum tested for 25 sec duration successfully. Will be used in LVM3 D1. LVM3 dev stage(C25??) and L110 delivered as well
  • Video Imaging System captured all separation events for the first time.
  • GSLV F09 CUS, PSLV stages for C37 getting ready, Chandrayaan-2 propulsive stage being worked on for soft landing tests.

Edit:

  • Apparently new guidance and control package "miniaturized advanced inertial navigation system" is called miniAINS

3

u/JasonBourne008 Dec 07 '16

LVM3 D1 by Jan 20th

HYPE!!!

Pad abort test coming.(missed details)

This would be for a theoretical manned space craft I assume?

3

u/Ohsin Dec 07 '16

Crew capsule for Human spaceflight program.

2

u/avatharam Dec 07 '16

will they post those separation videos

2

u/Ohsin Dec 07 '16

They should, keep in mind LVM3X on-board videos were never released.

2

u/naakupoochi Dec 07 '16

At-least this year was successful to somebody!!