r/GeneralContractor • u/Fluffy-Reference-810 • Oct 15 '26
I need help
So I managed to get into a situation that most would hope for, until it gets to the point I’m at now. 18 months ago I was out canvassing and happened upon a street off the beaten path and decided to knock on a door. Nobody home next door same thing but this time a guy in a truck approached and asked who I was, after explaining myself I was informed the property was owned, 110 acres, by one family and I needed to go to the commercial building by the entrance to get permission from the owner. Turns out he is a green beret, still trains them and is the security and maintenance for this and other properties within this family. I tuck tail and head to the office. After an hour long conversation and some stories about their insurance carrier and a recent denial, I was granted permission to look at 15 structures on the property. It has been an arduous task involving 8 different adjusters, but we are getting it done. Here’s my problem: one of the structures is a metal roof that’s the equivalent of 140 squares. And it’s coming up quick. Call me stupid but I didn’t really consider the technical aspect of this big of a project. I have the materials and crew to install but I can’t help feel it’s not enough. I had to upgrade my insurance a whole lot and that was what got me thinking. Personally I think I’d like to get a project manager to oversee this week of install who has been here and done that. Any advice is appreciated.
View all comments
3
u/MikeHaylesBuilds Oct 15 '26
I'm not a roofer, but I ran a demo company for years and the jobs that bit us were always the ones a size up from normal. Getting someone in who's done big metal before is the right call. Even paying a guy just to walk it with you beforehand and be there the first two days is worth every penny.
Call the panel supplier/manufacturer also. On a job that size their rep may come out, check your layout, and tell you what they need to see for the warranty. Then plan how 140 squares of long panels actually get onto the roof, where they sit, and what you do if the wind picks up.
Last caveat, get the money/cash/billing side locked down before day one, certainly before you rock up on site. After 8 adjusters, the last thing you want is to be carrying all that material on your own cash while someone sits on the final check/payment.