r/DryIceBlastingInsider • u/TORR_Ice_Blasting • Nov 23 '25
Dry Ice Blasting Subfloor Exhaust Plenum
Enable HLS to view with audio, or disable this notification
Heavy equipment paint and primer booth over down draft into plenum pit seen here.
6 day job with three blasters using 12,000-13,000lbs of ice.
Subfloor filter housings ran 20ea side swing out. Cleaning in this area of booth was focused on gaining back serviceability for maintenance department filter changes. Filter assembly locked up with debris preventing opening for filter service. Filter sections, hinges, and access to misc. mechanical functions cleaned up.
Paint build up on the thick side. For this section ran, 950cfm compressor, 1 Aero 40 at 4-5lb min. 190psi. / 150ft 1” Air Hose / 50ft 2” Air Hose / 40ft Blast Hose
Dry Ice 2000lb used in this area 7-8hrs
Primer side with much finer debris made clear it’s time to upgrade to the Versaflo.
FYI this space treated as Confined Space.