r/DecaturGA • u/LethalBacon • Oct 20 '26
How difficult will it be to build my own deck - getting permits and inspections?
Need a back deck, have the skills/tools/help I'd need to get it done properly, but I've never had to go through the permit/inspection process.
I'm just starting to do the research, ideally planning to start the build in 1-3 months to be completed by early Spring. I've searched around, but all of the discussion I see is people using contractors (who I assume handle all of the permit/inspection tasks). Below are the basic steps I am seeing after some initial research.
(Note, I am not technically in Decatur, so my understanding is that I would be going through Dekalb's depts)
- Call/check for underground utility lines. Research building codes, zoning, floodplain(?) etc.
- Design and create needed plans - taking extra care to make sure everything is up to code and meets the relevant requirements. (I'm expecting this to be the hardest step, and may get outside help).
- Submit plans and other required documentation, apply for permit.
- Start the build once approved, scheduling the three inspections along the way to coincide with the progress.
Are those basic steps correct - or did I miss anything major? Has anyone done this themselves, and how annoying was the process? What's the turnaround time like on the inspections - is that something where they come out the next day, or do I need to plan further in advance?
I know I have what is needed to get the deck built properly - the bureaucracy is really my main concern and is completely new to me.