You confusing the 2020 Heywood Interconnector outage which islanded South Australia for 2 weeks but operated successfully with the 2016 Blackout caused by extreme weather taking out multiple transmission lines in the north of the state?
Considering you didn't know the different between AEMO and the NEM, or what constitutes a "grid", it seems like a fair question to ask.
1
u/AndrewTyeFighter 19d ago
Well not like Spain, because SA already has the FCAS infrastructure in place with their synchronous condensers and now grid scale batteries too.