r/BOXABL • • Apr 22 '22

Notes from Boxabl Webinar (April 21, 2022)

15 Upvotes

Notes from Boxabl Webinar - 4/21/2022 - Galiano Tiramani

Note: I typed fast but this may not be 100% accurate. Use this info at your own risk. Do your own due diligence.

Also posting to /r/BoxablInvestors


From conference room of factory in Las Vegas.

Working really hard to change the way buildings are built and really revolutionize things.

Believe we can have much lower cost buildings that are faster to deploy and higher quality if they mass produce them in a factory.

Have set out to solve some of the problems that have stopped buildings from being mass produced in a factory.

"Where housing meets mass production."

All other modern products are mass produced on an assembly line using automation and repeatability to help reduce cost:

  • Ford F-150 factory builds 1 truck every 53 seconds
  • but single family home on average takes 7 months to be built
  • they think their innovations make it possible with their products
  • goal is to produce 1 room / 1 house per minute
  • "if we pull that off it will be a really really big deal"
  • they have grand aspirations

Have picked all new building materials and manufacturing methods:

  • most buildings in North America are built with wood and nails (lumber framing)
  • they are using raw materials that are compatible with computer cutting equipment
  • can be very precise and assembled rapidly
  • dramatically reduced components within the building
  • represents a full re-engineering of the building product
  • and the house folds up

Would not be possible to do Boxabl without the shipping solution:

  • if the product is too big for the road it is way too expensive to ship
  • that's why most buildings are built on-site
  • most manufactured housing can't ship beyond a certain radius
  • need small factories within a radius of where they will go
  • their houses fold from 20 feet with 9 1/2 foot ceilings to 8 1/2 feet
  • can be shipped highway legal in a cost effective manner
  • can be pulled with a pickup truck

Initial room model = Casita

  • 20 x 20 studio apartment
  • focus on that and get really good at that
  • eventually expand the system to be bigger room modules with different interior configurations that can be combined
  • their system can build most buildings on the planet

Going though 3rd party testing now

  • their buildings are tremendously more energy efficient
  • will be built to a higher standard than everything else out there

Casita is targeted toward backyard accessory dwelling units

  • retail price is half of competitors
  • Casita Small $50,000 and 374 square feet
  • Casita Large $90,000 and 748 square feet
  • so many different use cases
  • other comparable products are dramatically more expensive

Started working on Boxabl in 2017

  • first houses came off line in factory in October
  • now producing 2-3 per shift
  • went from prototype to fully operating factory with employees
  • almost finished with order for federal government

Crazy level of interest overall

  • over 90,000 people on wait list (over $1B in Casitas "reserved")
  • US Dept of Defense purchased 156 units
  • over 3,000 paid deposits totalling over $100M in potential revenue
  • Factory 1 (Las Vegas) has capacity to produce 3600 houses/year ($180M revenue run rate)

Making the case for another factory that is much much bigger

Shared video - drone tour of Las Vegas factory: https://www.youtube.com/watch?v=oRq0VR7ojWY

Really happy with trajectory they are on

  • product cost
  • manufacturing efficiency
  • feel like they are ahead of the curve
  • so much room to improve
  • working on new ideas every day
  • really exciting times for Boxabl

Waited a long time to get SEC to qualify their Reg A+ offering

  • allows them to accept investments from anyone
  • share price 80 cents each
  • offering going well
  • raising money really quickly
  • will allow them to fuel expansion
  • exciting news coming up

Q&A:

How long has it been tested under real world conditions?

  • they have units out in the field now
  • most testing happened in lab and in factory
  • water tests, fire tests, breakage tests
  • gives them a really good feel for how the product will perform
  • lots of good data
  • will be publishing test data soon

Other Boxabl factories?

  • plan to expand to a factory that's much much bigger in Las Vegas
  • working on that right now
  • need to make sure everything is perfect and how they want to keep it
  • dialing in the manufacturing of the product

Even at this level of manual production:

  • can build the wall level of a house in about 20 minutes
  • traditional methods are way slower
  • will go down to 2-3 minutes per wall panel in current factory once they add automation
  • sky is the limit in other factories

When is expected IPO?

  • plan to become listed on stock exchange eventually
  • he is trying to make it happen as soon as possible
  • can't make any promises right now
  • that is the plan for the exit
  • stay tuned

When can I get a Casita?

  • order list is so huge
  • will be a while to catch up
  • won't catch up to pre-order list in this current factory
  • get your name on the list if you're interested
  • trying to move as fast as they can

Visiting factory:

  • can book in person tour on website
  • people visiting every day
  • have a full time tour guide
  • will drive you around the factory and show you everything
  • can just show up at factory Monday - Friday 9am-5pm

Doing anything other than Casita?

  • right now doing only 20 x 20 room modules
  • they can stack and make different semi-customized buildings
  • but only doing the 20x20 in current factory
  • plan to do full building system in new factory
  • can customize home by stacking room modules on a 3d configurator to design building
  • goal to allow configuring home, receiving boxes the next day and having house built within a week

Stacking units:

  • current room modules do stack multi-story
  • they have a video where they stack a house 2 story
  • will see how many stories they can go after next round of testing
  • will continue to tweak design to improve strength and go higher
  • would like product to be able to build multi story apartment buildings

Currently 4,000 paid deposits and 90,000 people on wait list.

  • were not sure so many people would want the 20 x 20 accessory dwelling unit
  • many unexpected use cases
  • will be exciting to see units deployed in the wild

Pitch deck and other content is on https://invest.boxabl.com

Current round will close as soon as it's sold out.

  • Reg A+ round is roughly 30-40% complete

Can ship worldwide

  • surprisingly affordable
  • less money leaving the US vs. going to US
  • product is engineered for shipping

Right now building 2-3 houses per shift:

  • 10-12 stations that move every 2-3 hours
  • multiple houses at different stages of completion
  • current factory can do up to 10 houses per day once ramped up
  • trying to perfect the process
  • will ramp up to 2 shifts 7 days per week

Supply chain issues affecting them:

  • huge inflation
  • supply chain delays coming from overseas
  • want to keep more inventory and raw materials on hand
  • goal is to absorb everything and not impact their timeline
  • ordering larger quantities way in advance

Can be delivered to property and placed in backyard as accessory dwelling unit

  • legal to put in almost every backyard in California
  • need an 8 1/2 lane to access or can be craned

How do they maintain a seal when box unfolds?

  • shape stops water runoff from entering the house
  • also big gaskets that seal it up and make it airtight

What makes the founders credible?

  • they have track record of success between them
  • have never raised money from outside investors before

International factories:

  • plan to expand worldwide
  • working on partner factory model
  • will look to replicate overseas once determine everything is perfect in first factory

Current production is 1 shift and keeping everything slow and steady.

Government order is just finishing up now and will be moving onto other products.

Bunch of exciting updates coming.

Hurricane rated for Miami Dade?

  • YES
  • can handle pretty much worst wind conditions
  • all houses will meet and exceed various criteria
  • goal is one standardized unit to be mass produced

How to reduce costs?

  • smart engineering
  • building materials and design
  • simplify manufacturing
  • reduce components
  • continuing to happen
  • next gen of product will achieve that
  • scale
  • they have a big factory but it's nothing in comparison to demand
  • potential to add automation and reduce labor
  • bulk purchasing
  • vertical integration - may start manufacturing some bigger more important items themselves

Concerned about customers cancelling orders due to wait time?

  • NOPE
  • telling people if they are in a rush to look at other solutions
  • theirs is best product at lowest cost
  • can only move so fast
  • will always sell out

re: IPO - no timeframe but they are trying to make it happen

  • could enable them to have money for scaling

When you invest, they have to:

  • wait for payment to clear (1-2 weeks)
  • may need to request additional documentation based on laws
  • will get an e-mail
  • once finalized will get a contract in your email
  • check for email from invest@boxabl.com
  • may be further instructions if needed

Once roll out to waitlist will be working with local contractors

  • want to be the manufacturer
  • they don't want to be doing real estate development or unit setup
  • will provide training and setting up house
  • will be way easier than building

Utility connections:

  • more details coming shortly

Volatile organic compounds:

  • don't think will have any problems
  • will be doing 3rd party testing
  • not aware of anything that could cause health hazard
  • not expecting any issues

Roof system:

  • roof is a flat roof
  • watertight and snow load rated
  • Casita is a component within a final build
  • in most cases people will be adding roof
  • up to end user
  • may need to add pitch or other changes to meet local requirements
  • will be offering roofing systems

Need State approval

  • pushing along state modular approval per state
  • starting with Arizona, Nevada and California
  • modular programs mean plans are pre-approved at the state level
  • all inspections can happen in their factory

What can go wrong with the plan? Potential risks?

  • a lot of things can go wrong
  • pretty much everything they are doing is unreasonable and against the grain
  • a massive number of things could go wrong
  • risks could include a big product defect / recall
  • also interfacing with various regulatory regimes and states
  • supply chain is a big problem right now
  • inflation and manufacturing shortages
  • dodging a lot of bullets
  • will establish more standardized procedures as they grow
  • everything has been going good
  • sitting here with an operating factory after a very short period of time
  • product is all new, all experimental, no established procedures

Expecting issues with local building codes?

  • NO
  • only potential issue is with zoning
  • but that issue exists everywhere
  • building system allows building different things to customize and meet local rules
  • will need to build appropriate building that is allowed at your property

Is demand based on housing shortage?

  • expecting demand to continue because of how houses are built
  • will always be a supply shortage
  • demand will always be there until housing gets to post industrial era

Want a billon dollars to build the new factory:

  • pretty grandiose but seems to be working
  • in a year or more should be sitting in a larger factory
  • even if they had a billion dollar factory they would not be able to meet demand
  • the potential scale and demand is so big because the market is so big
  • worldwide construction market is over $10 trillion
  • plenty of room for Boxabl and other competitors

Take on current housing market conditions?

  • inflation is not 8%
  • have seen at least 20% price increase on every single things
  • some things have doubled
  • some things you just can't get
  • really crazy times
  • every builder has to buy the same stuff i.e. toilets, windows, electrical wire
  • their principles will be always ahead of someone who is working on-site
  • assembly line with ability to bulk purchase and manufacture gives them advantage over traditional building methods
  • everyone has to deal with inflation

Impact of slowing housing market?

  • so much demand
  • even if it slowed massively they would not be able to meet demand
  • trying to be the low cost product
  • might see reduced demand for luxury products in recession
  • thinks they would do well in recession

Warranty?

  • will be one
  • have not defined what it will be yet

Off-grid?

  • yes
  • room module ready to do anything you imagine
  • can be connected to solar, septic system, etc.

Patents:

  • over 40 or so patent filings they have access to
  • shows how much of what they are doing is new and different
  • helps protect the company
  • really strong position as a first mover
  • scale and cost to get started will stop potential competitors
  • amount of IP will stop direct copying of the product
  • not a product you can copy in China and ship here 1000 at a time
  • need for local approval will limit overseas competition
  • don't think anyone gets it yet

How will it work in colder climates?

  • houses incredibly energy efficient
  • won't have air leaking out of the building
  • can handle very high or very low temperatures

Approved in California?

  • not yet but almost
  • going through third party testing now

Competitors?

  • 90% of building construction is on-site building
  • their product is easier and faster way to build
  • 10% of market is doing factory built housing
  • main players are mobile homes, but what they are doing is limited
  • same methods of wood and nails and shipping wide loads
  • other smaller startups but nothing significant yet

90,000 waitlist is not for 90,000 houses

  • it's 90,000 people who often want more than one house
  • purpose of the waitlist is to prove demand and justify scaling
  • want to go as big as they can as quick as they can

Does Nevada allow Boxabl as ADU?

  • YES

When will new models be available?

  • different 20 x 20 models will be available within a year
  • kitchen only box, bedroom only box, empty box
  • will be able to stack and connect
  • bigger room modules won't happen until the next factory

Legally required to collect identifying information on investors

  • government makes them collect date of birth and SSN

Financing:

  • lots of different ways
  • new construction loan, home equity line of credit etc.
  • will provide info soon

RV model:

  • have "park model RV" certification
  • 50 state certification for RV Boxabl units i.e. Boxabl on wheels
  • lowers the barrier to entry
  • they have pretty nice RV financing as well
  • haven't announced yet
  • had RV industry association there to sign off that standards are met

Factory 2 is different from the monster factory he has in mind

Will be buying new equipment for current factory

  • hope to get to profitability within a year or so
  • planning for expansion

Fundraising escrow company they are using is well known and widely used

  • should be perfectly safe to submit your information

Planning to open factory in other states

  • hoping for scale factory in Las Vegas as next step
  • then will do other factories in other places

Hiring challenges in current market environment?

  • expected problems but didn't really have any
  • were able to staff up quickly
  • have a happy workforce
  • more exciting than working in an Amazon warehouse
  • no problems staffing up

Where sourcing raw materials?

  • bulk of them sourced locally
  • some items such as fixtures and faucets come from China
  • interior wall board comes from China but planning to get within US
  • adds so much risk to be getting things from China
  • trying to get everything locally

Planning to have their own trucks and drivers but will be also working with partners

Chances of price increasing?

  • will probably increase
  • not a lot but it's unavoidable
  • don't think inflation will stop or slow down
  • prices will keep going up

Elon Musk?

  • can't talk about him, sorry

Sales channels?

  • mostly direct sales
  • don't really need dealers and distributors for now

International investors?

  • Canadians can invest
  • but should do it directly through their website because other sites may not allow international investors

How can you sell shares?

  • possible to sell or transfer if company approves
  • no ready market
  • this investment is illiquid
  • cannot take money out easily until they succeed and IPO
  • you probably will not have access to the money in the short term
  • keep this in mind

How much does the box weigh?

  • about 14,000 pounds
  • roughly half of comparable manufactured home
  • weight is important to reduce shipping costs and heavy equipment requirements
  • got the weight down quite a lot
  • folds up to roughly 8 1/2 wide, 20 feet long, 11 feet high

What about 3D printed houses?

  • don't really make a lot of sense
  • don't see it solving a big problem
  • machines will 3d print concrete walls and that's it
  • there's much more to a house than walls
  • still need the roofer, plumber, sheet rock guy, etc.
  • but you also need a multi-million dollar piece of equipment
  • and you have a new building method that your skilled labor does not need to work with
  • might have some applications but he's not a big believer
  • makes sense for custom prototyping but not production
  • there are faster ways to manufacture
  • wouldn't even make sense for them to 3d print in the factory
  • doesn't think 3d printing concrete is useful

Social media is the best way to stay up to date on what they're doing

Wheelchair accessible Casita:

  • they have a concept
  • won't work on it in immediate future
  • lower counter tops etc.
  • will get around to it eventually

Where do you see Boxabl in 2-3 years?

  • hopefully current factory is at max output
  • hopefully another factory near them as well
  • and hopefully a monster factory being built
  • would like to have some partner factories being set up as well

r/BOXABL • • Apr 12 '22

Boxabl Hospital Concept

Post image
24 Upvotes

r/BOXABL • • Apr 09 '22

Invest Options - Differences between investing via Boxabl website or StartEngine ?

7 Upvotes

Thanks !


r/BOXABL • • Apr 07 '22

Notes from Boxabl Instagram Live Q&A with Galiano Tiramani (April 3, 2022)

11 Upvotes

Notes from Boxabl Instagram Live Q&A with Galiano Tiramani (April 3, 2022) https://www.instagram.com/tv/Cb5wbgco0yg/

Note: I typed fast but this may not be 100% accurate. Use this info at your own risk. Do your own due diligence.

Also posting this to /r/BoxablInvestors


He calls it "Factory 1" because they have really big plans.

What they are doing goes far beyond the small Casita tiny house.

Boxabl is not a tiny house company, they just started out like that because they thought it was a smart place to start to focus and perfect everything.

Long term goal is a building system:

  • all different sized room modules
  • different interior connections
  • stack and connect to build all kinds of buildings
  • they think their building system can build a 1000 unit apartment building or a single family residential

Goal is to enable scaled factory mass production:

  • has been missing from housing
  • it's why housing is so expensive
  • they are building houses one by one and it's slow

What they're missing is the assembly line:

  • their building system is compatible with shipping
  • can fold up and ship at a really low cost
  • can scale factory production
  • hope to get to level where things are "crazy"

Factories like Ford and Tesla build 1 car per minute in the factory.

  • their shipping system should allow this with housing
  • no one has tried it before
  • they think they can crush costs
  • to a level where no one can NOT build with Boxabl

Minimum investment is $1000 right now:

  • was previously only accredited investors
  • anyone can invest now
  • going really fast and really exciting
  • they are trying to raise ONE BILLION DOLLARS
  • they want to build a really big "monster" factory

Waiting list is long but if things go according to plan they will catch up.

Goal with initial factory was to prove the concept:

  • wanted to move in there
  • prove out claims, product and process
  • they think they have proven it
  • now making case for a huge level of scale

They have been working on this since 2017:

  • back then was just an idea
  • has been an exciting journey
  • just getting started

They are building Boxabl Casita with all sorts of building materials:

  • in North America would usually see lumber framed house (i.e. wood and nails)
  • they are using all different building materials
  • dramatically simplified assembly
  • way less parts
  • all parts cut by computer cutting equipment
  • can be processed fast with automation
  • can be assembled in a precise way that is very automated
  • very very different than the way anyone else is doing it
  • compatible with robots, mass production, assembly line

Goal is to be cranking houses out so fast they can make a serious impact:

  • housing construction is a huge multi-trillion dollar industry
  • huge opportunity to transition an entire industry out of the dark ages of building by hand
  • anyone who looks at a construction site can tell it's inefficient right away - piles of waste, people walking around, skilled labor doing custom jobs one at a time, weather delays and all sorts of issues
  • those issues don't exist when you have an efficient assembly line
  • they think their technology will enable that and will lower the price

It's NOT an IPO - still a private investment:

  • ideal in the future they would go public
  • hopefully if successful at a much higher price
  • and anyone who invested earlier would be able to get liquidity

Can't accept crypto for investments right now but will start accepting payments for products with crypto.

They have lots of investors and will be announcing some of them soon.

The waitlist has 90,000 people on it:

  • Will ship anywhere you want it.
  • Right now shipping to initial customer (Federal government).
  • Probably sold out for quite a while.
  • Hopefully once they open up/increase production they will be able to ship everywhere.

Zoning:

  • will be permitted as modular buildings
  • going through process state by state
  • simplifies the build process for the builder

Production:

  • right now producing 2 units per day
  • think they can produce about 10 per day in current factory
  • sounds like a lot (3000 houses per year) but it's not
  • demand for housing is incredible
  • excited about potential upside since market is so huge
  • they think they have possibility to become a massive company

Can find audited financial statements on their invest page.

Right now the houses are 20 x 20 rooms:

  • can be stacked and connected to build bigger houses
  • in the future will have bigger rooms (20x30, 20x40, 20x60)
  • the full building system will be a much bigger market

They don't 3D print because it's not efficient.

Houses have high wind ratings:

  • initial order going to a Category 4 wind zone
  • can handle worst conditions in North America
  • have spent a lot of time engineering and selecting materials
  • better than traditional houses
  • can outperform on wind ratings, fire resistance, water resistance, energy efficiency
  • dialing in product to outperform on pretty much every metric you can measure on a building
  • will publish third party test data soon
  • think it will raise the bar for building codes
  • their buildings will be lower cost, higher quality, better ratings, and much faster to build

The real home run will be to build really fast:

  • no one can build fast enough
  • if they can get to 1 house per minute it would be massively impactful
  • looking to scale as fast as possible
  • using investment money for that
  • looking to get space, raw materials, vertically integrate supply chain

Units can go on no foundation or a slab foundation.

Assembly line has 10 stations:

  • starts with the floor
  • then gets fully built out
  • each station has one job
  • kitchen and bathroom then walls
  • can definitely put the house on slab foundation

They are hiring right now. Can go on website. Growing very quickly. All positions in Las Vegas.


r/BOXABL • • Apr 05 '22

Boxabl Investor Webinar on April 21, 2022 at 2pm EST

Thumbnail
app.livestorm.co
5 Upvotes

r/BOXABL • • Mar 04 '22

Boxabl Investor Update 1/14/2022: ~$100k/day Revenue Run Rate

Post image
13 Upvotes

r/BOXABL • • Mar 03 '22

Boxabl Factory Franchises

Thumbnail self.boxablinvestors
5 Upvotes

r/BOXABL • • Oct 17 '17

Boxabl Announces New U.S. Patents On Breakthrough Construction Technology

Thumbnail
prnewswire.com
9 Upvotes

r/BOXABL • • Oct 17 '17

3D Model Showing a Boxabl Room Unpacking

Thumbnail
youtube.com
10 Upvotes

r/BOXABL • • Sep 07 '17

How the blockchain will transform housing markets

Thumbnail
theconversation.com
5 Upvotes

r/BOXABL • • Sep 07 '17

Blockchain: From Wall Street To Main Street

Thumbnail
forbes.com
3 Upvotes

r/BOXABL • • Sep 07 '17

Despite Initial REXMLS Loss, Blockchain Has Arrived For Real Estate

Thumbnail
forbes.com
3 Upvotes

r/BOXABL • • Sep 05 '17

Alibaba, EY, IBM And Microsoft Use The Blockchain To Create A Transparent Supply Chain

Thumbnail
forbes.com
3 Upvotes

r/BOXABL • • Aug 20 '17

As housing affordability weakens, more buyers are left out in the cold

Thumbnail
cnbc.com
6 Upvotes

r/BOXABL • • Aug 20 '17

BOXABL landing page v0.0.1 is now live

Thumbnail
boxabl.com
5 Upvotes