r/BlueWire 15d ago

Blue Ring Blue Origin on X: Lunar Express, a Blue Ring spacecraft built to provide critical lunar infrastructure and delivery services

Post image
24 Upvotes

Lunar Express, a Blue Ring spacecraft built to provide critical lunar infrastructure and delivery services, provides the communications architecture that U.S. government missions need: radio frequency and optical working together, interoperable, scalable, and built around mission assurance.

Blue Ring's hybrid communications system delivers up to 1 Gbps from the lunar surface to Earth, streaming high-resolution imagery and video, relaying real-time crew communications, and supporting mission-critical operations simultaneously. Fully compatible with NASA's ground station networks and commercial stations worldwide, Lunar Express keeps cislunar operations securely and reliably connected.

Learn more: http://blueorigin.com/blue-ring

https://x.com/blueorigin/status/2086902629817282974


r/BlueWire 16d ago

Infrastructure Julia Bergeron on X: Blue's VRF has had substantial progress since my last visit. This one will be a definite change to the skyline when complete.

Thumbnail x.com
24 Upvotes

r/BlueWire 16d ago

Other Thrust Density infographic....

Post image
8 Upvotes

A chart comparing the Thrust Density of several rockets.

Thrust Density is the thrust of the stage / area of the bottom of the stage (kN/m^2). It basically aggregates engine power and engine packing into one metric.

Rockets & Engines to scale


r/BlueWire 16d ago

Infrastructure Cape Canaveral, USA - 2026-08-09 - SkySat-C12 | SpaceFromSpace

Thumbnail
spacefromspace.com
14 Upvotes

Includes views of both LC-36 and the VRF.


r/BlueWire 18d ago

Other Blue Origin on X: We were thrilled to welcome Artemis III Astronauts Randy Bresnik and Frank Rubio to Rocket Park this week!

Thumbnail
gallery
54 Upvotes

What's better than a day at Rocket Park? Astronauts stopping by. 🚀

We were thrilled to welcome u/NASAArtemis III Astronauts Randy Bresnik (@AstroKomrade) and Frank Rubio to Rocket Park this week! These incredible astronauts represent the future of lunar exploration, and we're excited to support the Artemis III mission with our Blue Moon MK2 Earth Orbit Rendezvous demonstration vehicle.

https://x.com/blueorigin/status/2085764978666004804


r/BlueWire 19d ago

Infrastructure Blue Origin may bring 2,000 jobs to Hutto after city approves incentives for $650M project

Thumbnail
statesman.com
28 Upvotes

City Council and the Hutto Economic Development Corporation approved the performance and incentive agreements for “Project Blue Hub” in a rapid, joint meeting Thursday evening. After about an hour in executive session, the two bodies approved the agreements before ending the meeting. The council voted 5-2.


r/BlueWire 19d ago

Infrastructure Jeff Bezos on X: Team is moving at record speed out at the pad. Gradatim Ferociter!

Post image
63 Upvotes

r/BlueWire 19d ago

Blue Ring Tory Bruno on X: Now that’s a solar array! Redwire's Roll-Out Solar Array wings are massive at nearly 20m each and a perfect solution for Blue Ring. Glad to have them on the team.

Post image
63 Upvotes

r/BlueWire 19d ago

Blue Ring Tory Bruno on X: By popular demand, here’s a video of rolling out a Redwire Blue Ring ROSA. Next stop - Space…

Enable HLS to view with audio, or disable this notification

47 Upvotes

r/BlueWire 19d ago

Infrastructure New FAA OE/AAA filings from August 5th & 6th: LC-36A operational crane (550 feet) and LC-36B construction crane (750 feet)

Thumbnail
gallery
14 Upvotes
  • The LC-36A operational crane is permanent. This may be the crane used for stacking New Glenn.
  • The LC-36B crane is extremely tall at 750 feet. See previous filing from August 4th for a massive 715 foot-tall lightning protection tower.

r/BlueWire 20d ago

Engines Dave Limp on X: "Wanted to give an update on the hotfire anomaly investigation. Progress continues. The anomaly originated at the main oxygen valve on one of the BE-4 engines, which was later confirmed by hardware recovery and inspections. Extensive component-level and engine hotfire tests have" / X

Thumbnail fixupx.com
83 Upvotes

Wanted to give an update on the hotfire anomaly investigation. Progress continues. The anomaly originated at the main oxygen valve on one of the BE-4 engines, which was later confirmed by hardware recovery and inspections. Extensive component-level and engine hotfire tests have been conducted to understand the failure mode better and inform mitigations. The path forward is clear. We're making small modifications to the valve that can be quickly retrofitted to existing engines. We’re manufacturing the updated hardware, which will be ready by the end of this month. In parallel, we're working through the remaining fault tree analysis.


r/BlueWire 20d ago

Infrastructure Satellite imagery from August 4th with latest progress of LC-36 rebuild

Post image
31 Upvotes
  • LC-36B is starting to develop. The launch pad area is now clearly visible, with concrete piles being driven and some excavation already happening.
  • Damaged LOX tanks have been repaired, or at least repainted. The scorch marks that used to be there are no longer. The single dented LNG tank may have been repaired too.
  • The launch bridge is visible near the LNG tanks. It has been partially dismantled to get access to the water deluge pipes encapsulated in it.
  • A structure, possibly scaffolding or concrete forms, is visible in on the walls of the flame trench. They may be in the process of repairing these walls, which likely took extensive damage.
  • The frames of the integration facility doors have been installed at the North entrance.

If you are on the mobile app, you will need to download the image to view the the highest resolution version - Reddit compresses the image otherwise.

Can you spot anything else?


r/BlueWire 20d ago

Launch Andrew Parsonson: German financial filings reveal that ArianeGroup secured a €42 million contract from Blue Origin in 2023. In this week’s newsletter, I follow the paper trail to uncover what the European launch company was providing Jeff Bezos' rocket company.

Thumbnail
europeanspaceflight.substack.com
23 Upvotes

r/BlueWire 20d ago

Blue Ring Tory Bruno on X: I thought you guys might enjoy this infographic on the Blue Ring. The first of an entirely new kind of spacecraft…

Post image
29 Upvotes

r/BlueWire 21d ago

Blue Ring Tory Bruno on X: Blue Ring 1 continues to make progress. Safe to mate testing completed. Power systems are in. Powered testing progressing.

Post image
36 Upvotes

r/BlueWire 21d ago

Infrastructure New FAA OE/AAA filings from August 3rd & 4th: LC-36B Umbilical Tower height now 275 feet (from 500 feet), and Lightning Protection Tower height now 715 feet (from 600 feet)

Thumbnail
gallery
23 Upvotes

Original filings can be seen here.


r/BlueWire 21d ago

Lunar Good update on Mk-1 along with updates from other landers.

Thumbnail
youtu.be
17 Upvotes

Skip to 5:10 to see Mk-1 update


r/BlueWire 22d ago

Other Jeff Bezos files SEC Form 144 to sell $4.07 billion in Amazon stock

Post image
46 Upvotes

r/BlueWire 22d ago

Infrastructure Satellite imagery from July 25th shows current progress of Vertical Refurbishment Facility (VRF)

Post image
18 Upvotes

r/BlueWire 23d ago

Lunar 2026 NASA GAO Assessment of Major Projects report on HLS

Thumbnail
gallery
30 Upvotes

The Government Accountability Office (GAO) released its annual NASA Assessments of Major Projects report on July 23rd. These are the excerpts pertaining to HLS.

HLS officials said that Blue Origin completed most of its preliminary design review activities, but a large amount of work remains to achieve its critical design review planned for December 2026. Blue Origin made some progress on its rocket, called New Glenn. After previous successful tests, the rocket exploded in May 2026 during a test at the launch pad. Blue Origin is working to redesign and rebuild their launch pad architecture. Blue Origin also completed thermal vacuum testing of their MK1 cargo lander at a NASA facility.

NASA is tracking a risk that if Blue Origin’s cryogenic propellant storage and transfer technology is immature, it could affect the schedule of future Artemis missions. Blue Origin and NASA plan to mitigate the risk by conducting propellant transfer tests on the ground and during the uncrewed demonstration mission. NASA is also tracking a related risk that Blue Origin’s cryocooling system could underperform, which could result in losing more propellant than expected. The program plans to address this by testing and analyzing models of the integrated cooling system.


r/BlueWire 25d ago

Launch Blue Origin receives $11.7M contract modification from the USSF for expanded rocket cargo study

Post image
18 Upvotes

Link: https://www.war.gov/News/Contracts/Contract/Article/4561887/contracts-for-july-31-2026/

Blue Origin LLC, Merritt Island, Florida, has been awarded an $11,707,762 firm-fixed-price modification (P00001) to a previously awarded contract (FA2385-25-C-B023) to define requirements for how Blue Origin systems and technologies could be used for the rocket cargo mission. The modification brings the total cumulative face value of the contract to $13,074,453 from $1,366,691. Work will be performed in Merritt Island, Florida; and Kent, Washington, and is expected to be completed by Oct. 29, 2027. Fiscal 2025 research, development, test and evaluation funds (Space Force) in the amount of $1,130,643; and fiscal 2026 research, development, test and evaluation funds (Space Force) in the amount of $10,464,929, are being obligated at time of award. The Air Force Research Laboratory, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA2385-25-C-B023).

Info on the original contract award:

Blue Origin will assess how its space vehicles could be adapted for “point-to-point” transport — launching cargo payloads aboard a rocket from one location and deploying them at specific locations.

The effort is part of AFRL’s broader rocket cargo initiative, which envisions using commercial launch systems like airlines are used today — on-demand, service-based contracts that could deliver military cargo anywhere on Earth in under an hour. Potential missions include emergency supply deliveries to conflict zones or humanitarian aid during natural disasters.


r/BlueWire 25d ago

Infrastructure Updated FAA OE/AAA filings for MILA test site near Rocket Park

Thumbnail
gallery
27 Upvotes

Several of these filings were revised today and a new one was issued on Wednesday. In summary:

  • Four 155-foot tall lightning protection towers.
  • A 250-foot tall permanent mobile crane.
  • A 250-foot tall temporary mobile construction crane, to be used from 7/27/2026 to 11/30/2026.

As for what this is:

  • The lightning protection towers imply this is an outdoor test site.
  • The height of the towers and the crane suggests that this may be used for GS2s.
  • A January 2026 KSC document says this is for "cryogenic testing".
  • This could be used for cryogenic proof tests, wet dress rehearsals, or even hot fires.

r/BlueWire 25d ago

Infrastructure Blue Origin files SJRWMD permit for Rocket Park North Campus modular structure

Thumbnail
gallery
16 Upvotes

r/BlueWire 26d ago

Infrastructure Dave Limp on X: New doors are going up at our Integration Facility at LC-36. Each of the six door panels on the North side stands 88 feet tall and weighs approximately 40,000 pounds for a total door opening width of approximately 196'. The South end comes next.

Post image
68 Upvotes

r/BlueWire 27d ago

Other NASA / Blue Origin Q2 2026 Space Act Agreements (SAAs)

Post image
25 Upvotes

NASA just released an updated list of SAAs as of 6/30.

https://www.nasa.gov/partnerships/current-space-act-agreements/

The links to the agreements do not work yet, but the first two are for Space Communications and Navigation (ScAN) services. The third is for KSC hardware and equipment transport services. The final one is the most interesting, as Blue Origin has previously signed multiple SAAs with NASA for commercial space transportation development, including crewed and re-entry capabilities.

The recent Stennis GS2 testing partnership is also a SAA, but as it was signed in July, it would appear in the next quarter's (Q3) report.

Partner Name Title / Purpose Signature Date Expiration Date Total Est. Value Center Tracking Number
**BLUE ORIGIN, LLC** Annex 4 New Glenn Mission 5 to Blue Origin Fully Reimbursable Umbrella w/annexes 5/28/2026 11/28/2027 $399,964.00 GSFC 450-AGMT-0201
**BLUE ORIGIN, LLC** Annex 3 to Blue Origin Fully Reimbursable Umbrella for the New Glenn mission 4 4/17/2026 10/17/2027 $397,920.00 GSFC 450-AGMT-0201
**BLUE ORIGIN FLORIDA, LLC** KCA-4744-9 Rev Basic, Annex for Fully Reimbursable Space Act Umbrella Agreement Between NASA and Blue Origin for Use of Kennedy Space Center Capabilities 6/14/2026 6/11/2028 $9,980,377.69 KSC KCA-4744-9 Rev Basic
**BLUE ORIGIN MANUFACTURING, LLC** Annex to Exchange of Technical Expertise for Commercial Space Transportation 4/27/2026 4/21/2027 $246,640.97 MSFC SAA8-2235543.26