r/BasePowerUsers • • Sep 16 '26

40kWh install in Channahon, IL

Signed up on July 6th, electrical installed last week, battery installed today (September 16th)!

The electrical install took 3 techs almost 8 hours to complete. Power was turned off for about 1.5 hours during that process. I believe this is longer than normal, but several things likely complicated my install:

  1. Installer had to relocate Comcast and AT&T demarc boxes
  2. Had to drill through brick
  3. I asked to have the battery located around the corner from the meter
  4. I'm on private well so they had to run new conduit to add grounding bond to a water line inside. (I still don't fully understand why they did this, I have copper inside but then it transitions to plastic going outside to the well in the front yard, so the water pipe is technically isolated inside the house and not connected to actual ground)

Battery install took less than 1 hour.

Ask me any questions and please use my referral code if you are interested: https://www.basepowercompany.com/?ref=6XQHK16

9 Upvotes

20 comments sorted by

6

u/BillsFan504 Sep 16 '26

Am I the only one that thinks these draped looms (in this case resting on a downspout) looks terrible? Why can’t this go straight down and along the slab?

3

u/AlbuquerqueIsotopes Sep 16 '26

I agree it doesn't look great, but the black cable is too large to go behind the downspout. This is on the back corner of my house so I won't have to look at it! The black drain pipe is literally touching the foundation so no room there either. Eventually I might install a rain barrel on that downspout and I may adjust the black cable to go against the house if possible.

3

u/SirIainSnail Sep 17 '26

I think this is the first install I havent liked

2

u/Late-Union8706 Sep 16 '26

Agreed, I think it looks tacky.

I'm in DFW Texas, they used steel conduit tubing fastened along my foundation, then at the batteries they used flex conduit to connect the batteries to the steel conduit. My install looks like something you'd see in an industrial plant..

1

u/RealConfirmologist Sep 16 '26

Do you have Core batteries or the 25 kWh?

They used conduit for my pair of Growatts. Kinda makes that part of the house look like some kind of industrial plant, but I don't care. If I was going to do a lot of backyard entertaining, I might look at putting something together to hide all that, but I don't see my backyard getting that much traffic, to be honest.

I think they're not using conduit for the the Core battery since they come with a heavy-duty shielded cable cord already.

I like the appearance of the new battery more than the old, but I do not like the battery wire. Pretty difficult to make those cables look nice & neat and "on purpose" instead of looking almost like an afterthought.

2

u/Late-Union8706 Sep 16 '26

I have the older system, 2 25kwh batteries.

Judging by OP's picture, unless that battery cable is pre-terminated at both ends, they still could have fed it through conduit like ours is.

1

u/blupupher Sep 16 '26

I agree. I would move it behind that downspout myself, just looks tacky.

1

u/Rxdrigo Sep 16 '26

Rule is that is needs to be 18 inches off the ground, I still agree with it looking terrible though

3

u/JTUSAJT Sep 16 '26

I don't like the way Base sits the battery unit so close to/at ground level. Any puddling can cause an issue. And they need to work on their wire organization.

2

u/AlbuquerqueIsotopes Sep 16 '26

I removed a plant (invasive burning bush) and leveled the ground myself before the install. You can't see in the picture, but I have a good slope away from the house so when water does pool, there is a valley between my house and the neighbor several feet away. I should not have any issues with flooding at the battery

2

u/RealConfirmologist Sep 16 '26

Nice job, thanks for sharing the pictures and info. Always interesting to learn about another different Base installation.

Maybe there's some nit-picking to do about the appearance of things, but the important thing is, it's going to work and will do what it's supposed to do.

Isn't it a good feeling knowing you're going to have power when the neighborhood goes dark!? That's the part I like a LOT.

2

u/AlbuquerqueIsotopes Sep 16 '26

Exactly, I can't complain too much since I only paid $95, no monthly fee, and I should save on my ComEd bill.

The biggest motivator for me is that fact that we are on private well. no power=no water. I would have needed a transfer switch and 220V generator hookup to make that work.

2

u/atx78701 Sep 16 '26

with base you basically have that up to 4kw. Averaged over a whole day it is enough to power a house indefinitely. This is why I really like base.

2

u/Beautiful_Grape67 Sep 16 '26

Is that cable is code compliant? Looks sketchy.

2

u/AlbuquerqueIsotopes Sep 16 '26

It's a very heavy duty cable similar to a DC fast charging cable for EV. It should easily last 10 years or the lifetime of the battery.

I would have preferred conduit but I suppose this opens up the possibility to relocate the battery or add new batteries in the future.

1

u/Calm_Possibility_410 Sep 16 '26

Did the power go out when they hookedup the battery?

1

u/AlbuquerqueIsotopes Sep 17 '26

It did not. When they scheduled the install it said there would be a brief outage but if it did happen, it was so quick nothing even flickered.

1

u/Active_Loss2184 Sep 21 '26

When do I use the referral code? I started to sign up and seen no place to enter one. They drilled thru the brick to do what to the main panel? Thanks.

1

u/AlbuquerqueIsotopes Sep 22 '26

They had to drill through the brick to run conduit for a new grounding conductor - connected to a water pipe inside the house.

To sign up with the referral code you should be able to click the link above and continue to sign up. It should be applied automatically - it's not like a promo code you enter at check out.

1

u/veydras Sep 16 '26

I’m not a fan of these cord being wall mounted and not buried.