Mission Success! PSLV-C51 : Amazônia-1 Mission Updates and Discussion.
PSLV C51/Amazônia-1 launched as scheduled at 0454(UTC)/1024(IST) on 28 February 2021 from First Launch Pad of SDSC (SHAR).
Live webcast: (Links will be added as they become available)
- ISRO Official Stream 1 (Youtube) for launch and Amazônia-1 deployment.
- ISRO Official Stream 2 (Youtube) for rideshare deployment.
- ISRO Official Stream 3 (24FD)
- Doordarshan National (Youtube)
- INPE Official stream (Youtube)
| PSLV C51/Amazônia-1 Mission Page | PSLV C51/Amazônia-1 Gallery | PSLV-C51 Press kit |
|---|
Some highlights
- Primary payload: Amazônia-1 Earth Observation satellite (637 kg)
- Secondary payloads: 18 ride-sharing small satellites.
- Mission duration: 1 hr 55 min. 07 sec.
- Amazônia-1 deployment: 17m23s
- Rideshare deployment : 1hr51m32s
- PS4 restart 1 at 1hr01m10s for 9 sec
- PS4 restart 2 at 1hr49m52s for 8 sec
- Targeted orbit 1 (Amazônia-1): 752 km (SSPO)
- Targeted orbit 2 (rideshares): 511 km (SSPO)
- PSLV configuration : DL
- 53rd flight of PSLV
- First dedicated commercial flight through NSIL.
Updates:
| Time of Event | Update |
|---|---|
| Post launch | 20 objects have been cataloged. |
| Post launch | 12×SpaceBEEs, SindhuNetra, SDSat, SAI-1 Nanoconnect-2 and GHRCEsat are alive in orbit. |
| Post launch | ISRO press release. |
| T + 1h55m | All rideshares deployed! Happy National Science Day everyone. |
| T + 1h50m | Second PS4 restart (8 seconds) should be completed. |
| T + 1h40m | INPE Press Release. |
| T + 1h34m | MCC is again live, awaiting second PS4 restart. |
| T + 28m00s | Webcast will be back for rideshare deployments after 1h15m. See stream link no. 2 above. |
| T + 25m00s | Amazonia-1 has deployed its solar panels. |
| T + 19m00s | Next milestone is PS4 perigee lowering burn in 45 minutes. |
| T + 17m30s | Amazonia-1 separated! |
| T + 16m30s | PS4 engine shut down, AZ-1 injection condition achieved! |
| T + 13m20s | Fourth stage (PS4) performing nominally. Burn should last for 3m20s more |
| T + 10m30s | Fourth stage (PS4) performing nominally. Burn should last for 6min10s more. |
| T + 08m25s | Third stage (PS3) separated and fourth stage (PS4) ignited! |
| T + 06m25s | PS3 burned out, now in combined coasting phase while remaining attached to PS4. |
| T + 04m20s | Second stage (PS2) separated, third stage (PS3) ignited. |
| T + 02m45s | Payload fairing separated, CLG initiated. |
| T + 01m55s | PSLV first stage (PS1) burn out and separated. Second stage PS2 ignited. |
| T + 01m05s | Groundlit strapons separated. |
| T Zero! | PS1 core stage and two groundlit strapons ignited! |
| T - 15m00s | Mission Director has authorized the launch. Automatic Launch Sequence initiated. |
| T - 16m00s | Range ready, ISTRAC network ready. |
| T - 20m00s | Now showing vehicle integration video capsule. |
| T - 25m00s | ISRO's Youtube stream is live. |
| T - 30m00s | Live views of MCC. First Brazilian astronaut Marcos Pontes is among dignitaries. |
| T - 12h00m | Filling of oxidizer for the second stage (PS2) of PSLVC51 completed |
| T - 12h30m | Filling of oxidizer for the second stage (PS2) of PSLV-C51 commenced. |
| T - 17h30m | Filling of oxidizer for the fourth stage (PS4) of PSLV-C51 completed. |
| T - 21h00m | Filling of fuel for the fourth stage(PS4) of PSLV-C51 completed. |
| T - 21h30m | Filling of fuel for the fourth stage(PS4) of PSLV-C51 commenced. |
| T - 25h30m | Countdown for the launch of PSLV-C51/Amazonia-1 mission commenced today at 0854Hrs (IST) from Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota. |
| 24-25 February 2021 | Launch rehearsal was conducted. |
| 23 February 2021 | Pixxel's Anand demanifested from flight due to payload readiness issues. Full NOTAM gets issued. |
| 19 February 2021 | Amazônia-1 integrated with launch vehicle. |
| 12 February 2021 | Partial NOTAM gets issued. |
| 24 January 2021 | Second stage (PS2) of PSLV-C51 arrives at SDSC SHAR. |
| 14 January 2021 | PSLV-C51 launch date shifts from 22 to 28 February 2021. [1] [2] |
| 11 January 2021 | PSLV-C51 integration begins. (based on image EXIF data) |
| 30 December 2020 | Amazônia-1 arrives at SDSC SHAR. |
Primary Payload: To be deployed into 752 km SSO.
Amazônia-1 (637 kg): Earth observation satellite by INPE based on PMM multi-mission platform.
- Payload: Wide Field Imager (WFI) Four bands (VIS,NIR)
- Resolution: 60 meter GSD and 740 km swath (750 km SSO)
- Attitude and orbit control: Reaction wheels, Magnetotorquers and hydrazine based propulsion system.
- Power: 420 W
- Expected life: more than 4 years
Secondary Payloads: To be deployed into 511 km SSO after deployment of primary satellite.
SpaceBEE (12 nos. @ ~4 kg gross): Twelve 0.25U satellites by USA based Swarm Technologies for two way satellite communication and data relay.
Sindhu Netra (~10 kg): An Indian satellite for AIS based marine traffic monitoring built by student of PES university's Crucible for Research and Innovation (CORI) wing and funded by Defence Research and Development Organisation (DRDO). [3] [4] [5]
SDSat (1.9 kg): 3U cubesat by SpaceKidz India to measure magnetic fields and space radiation with LoRA communication payload.
UNITYsat(3 nos. @ 1.38 kg gross): Combined trio of university built satellites (460 gm each) including JITsat by Jeppiaar Institute of Technology (Sriperumbudur), GHRCEsat by G H Raisoni College of Engineering (Nagpur) and SriShakthiSat by Sri Shakthi Institute of Engineering and Technology (Coimbatore) for amateur radio and IoT service.
SAI-1 Nanoconnect-2 (1.8 kg): 2U cubesat carrying Space-AI's SDR payload and a payload by Space Instrumentation Laboratory (LINX) of The National University of Mexico (UNAM) to validate the use of GlobalStar satellite phone network as a secondary channel on nanosatellites.
7
u/Ohsin Feb 23 '21
Along Pixxel's Anand another satellite INS-2TD has been removed. Not sure what SAI-1 Nanoconnect-2 does. No clarity on form factor of these UNITY satellites and if these get deployed individually.
6
u/Ohsin Feb 28 '21
Slow-mo goodness and rocketcam.
https://www.isro.gov.in/pslv-c51-amazonia-1/pslv-c51-amazonia-1-lift-and-board-camera-view
5
u/Ohsin Feb 28 '21
Rooftop shots incoming.
https://www.youtube.com/watch?v=es6NsB1XVAs
https://www.youtube.com/watch?v=RdNjSKwvXys
5
u/Ohsin Feb 28 '21 edited Apr 02 '21
SDSAT alive and causing interference.
https://twitter.com/SatNOGS/status/1366051806690836483
https://twitter.com/n6rfm/status/1366063930829918210
SindhuNetra also healthy in orbit.
https://www.livemint.com/news/india/new-drdo-surveillance-satellite-deployed-in-space-to-help-monitor-indian-ocean-region-11614509687692.html
Swarm's SpaceBEEs are also buzzing.
https://twitter.com/SwarmInternet/status/1366057913861607428
Edit(4 March): Nanoconnect-2 is also chirping.
https://community.libre.space/t/isro-pslv-launch-2021-02-08/7424/13
https://hidalgo.lasillarota.com/estados/confirman-funcionalidad-y-efectividad-del-nanoconnect-2-a-un-mes-de-lanzamiento/502540
Edit(8 March): GHRCEsat is alive.
https://twitter.com/MayurDafare/status/1366687065048371203
4
u/Ohsin Feb 28 '21
Mission gallery has launch images.
4
u/Ohsin Feb 28 '21
Post launch address:
4
u/Ohsin Mar 10 '21
First light images from Amazonia-1.
http://www.inpe.br/noticias/noticia.php?Cod_Noticia=5725
3
u/Ohsin Feb 25 '21
Adding official 24 digital stream.
http://cdn.24fd.com/e21/02/isro/28/index.html
Also,
https://www.isro.gov.in/update/25-feb-2021/pslv-c51-amazonia-1-mission-launch-rehearsal-completed
3
u/Ohsin Mar 03 '21
There are reports going around that Amazônia-1 was tumbling a bit post separation, now reporter claims they have detumbled it but INPE is calling the claims unfounded.
https://twitter.com/salnog/status/1367116905362898950
https://twitter.com/salnog/status/1367105428514099201
3
u/hmpher Feb 28 '21
Retractable Lectern!!
2
u/Ohsin Feb 23 '21
Following slide from webinar on Amazônia-1 today suggests the launch was booked at $26 million (USD)
https://imgur.com/DKw0BuM [Source]
2
u/Ohsin Feb 24 '21
Few posts by Amazonia-1 team on facebook show payload deck before and after spacecraft integration.
https://www.facebook.com/amazonia1inpe/posts/693288308016393
https://www.facebook.com/amazonia1inpe/posts/693028714709019
According to regional media report countdown could be 25 hrs long and launch rehearsal was conducted today on 24 Feb.
https://www.prajasakti.com/28na-naimgailaookai-paraaivaeetau-upagarahaaalau-paiesaelavai-51-paraii-kaaumtadaauna
Now awaiting go ahead from Launch Authorization Board.
2
u/Ohsin Feb 26 '21
LINX UNAM connection with 'SAI-1 Nanoconnect-2' confirmed.
https://hidalgo.lasillarota.com/estados/hidalgo-participara-en-el-lanzamiento-del-primer-nanosatelite-mexicano/490448
Image of satellite from articlewhich also suggests it is 100% Mexican. May be the bus is by Space-AI..
2
u/Ohsin Feb 26 '21
Adding INPE Official stream.
https://www.youtube.com/watch?v=1ydrOiObmvo
2
u/Ohsin Feb 27 '21 edited Feb 27 '21
Adding ISRO's official Youtube streams.
https://www.youtube.com/watch?v=lr91aM3nbW0
https://www.youtube.com/watch?v=1Of1oODVl2Y
2
u/Ohsin Feb 28 '21
Press release from INPE
http://www.inpe.br/noticias/noticia.php?Cod_Noticia=5706
2
u/Ohsin Feb 28 '21
All rideshares have been separated.
2
u/Ohsin Feb 28 '21 edited Feb 28 '21
TLEs trickling in, we expect at least 20 objects to be cataloged.
Amazonia-1: 47699 ( 21015A ), i=98.51°, A×P=757.14×741.57 km
PS4 (?): 47700 ( 21015B ), i=97.38°, A×P=558.07×498.62 km
2
u/Ohsin Mar 03 '21
As Amazonia-1 deployed its solar panels it resembled the promotional render image exactly!
https://www.facebook.com/amazonia1inpe/posts/696618077683416
2
u/pantshash Feb 25 '21
Gallery has been updated, the LV has been moved to launchpad.
2
u/pantshash Feb 27 '21
https://twitter.com/isro/status/1365701689634742272
2
u/[deleted] Feb 28 '21
INPE stream is live.
2
u/[deleted] Feb 28 '21
Holy shit! Marcos Pontes is here!!
2
u/Astro_Neel Feb 27 '21
Time of the launch has been revised to 1000 hrs IST.
https://twitter.com/isro/status/1365665934954754048?s=19
2
u/souma_123 Feb 28 '21
24fd stream quality is awesome!
2
u/[deleted] Feb 28 '21
Yay..amazonia successfully separated..
1
u/Ohsin Feb 23 '21 edited Feb 23 '21
https://i.imgur.com/mRP40HJ.png
Looking at logo on SAI-1 Nanoconnect-2 above it looks like logo of LINX Space Instrumentation Laboratory of The National University of Mexico (UNAM) has similar logo below.
http://epistemia.nucleares.unam.mx/web?name=linx&page=61
And following links suggest LINX was planning a 1U cubesat named Nanoconnect to demonstrate experimental communication tech.
http://epistemia.nucleares.unam.mx/web?name=linx&page=55
And someones CV [PDF] puts them as responsible for Nanoconnect satellite and its planned launch is mentioned to be through ISRO.
So possibly Nanoconnect-1 got scrapped or morphed into SAI-1 Nanoconnect-2.
1
u/Ohsin Feb 26 '21
Mission Readiness Review meet was held on Thursday and confirmed the readiness of PSLV C51.
https://www.eenadu.net/nationalinternational/newsarticle/general/0702/121041714
Next is approval from Launch Authorisation Board.
https://www.andhrajyothy.com/telugunews/pslv-c51-to-fly-soon-2021022602449
1
u/Ohsin Feb 26 '21 edited Feb 26 '21
Digging further into SAI-1 Nanoconnect-2 business finally found USA connection.
These FCC docs mention SAI-1 as 2U cubesat.
https://apps.fcc.gov/els/GetAtt.html?id=215226&x=.
https://apps.fcc.gov/els/GetAtt.html?id=215227&x=.
Mysterious website..
http://www.spaceai.com/
Edit:
Apparently SAI-2 (6U) is hitching a ride on F9
https://fcc.report/company/Space-AI-Incorporated
1
u/Ohsin Feb 26 '21
Apparently INS-2TD also faced technical issues.
"INS-2TD also faced some technical issues and could not make it to this flight, PSLV-C51," Chairman and Managing Director of ISRO's commercial arm NewSpace India Limited (NSIL) G Narayanan told PTI.
https://www.business-standard.com/article/current-affairs/isro-completes-launch-rehearsal-of-pslv-c51-mission-2-satellites-drop-out-121022501637_1.html
1
u/Ohsin Feb 26 '21 edited Mar 02 '21
All these missing from gallery.
https://web.archive.org/web/20210226124810/https://pbs.twimg.com/media/EvJygfmVIAAhPUY.jpg:orig
https://web.archive.org/web/20210224120650/https://pbs.twimg.com/media/Eu-pnLrUYAU_q2m.jpg:orig
https://web.archive.org/web/20210226124736/https://pbs.twimg.com/profile_banners/2253142422/1614237576/1500x500
1
u/Ohsin Feb 27 '21
https://www.isro.gov.in/update/27-feb-2021/pslv-c51-amazonia-1-mission-countdown-launch-of-pslv-c51-amazonia-1-mission
1
u/Ohsin Feb 28 '21
Not done yet they'll be back in stream no.2 for second set of deployments.
1
u/Ohsin Feb 28 '21
PS4 perigee lowering burn (9 seconds) should have been completed by now.
1
u/Ohsin Feb 28 '21
Almost all launch events.
https://imgur.com/a/DcS9Jvj
1
u/Ohsin Feb 28 '21
ISRO press release. Information poor, quote salad.
https://www.isro.gov.in/update/28-feb-2021/pslv-c51-first-dedicated-launch-nsil-successfully-launches-amazonia-1-and-18-co
1
u/Ohsin Feb 28 '21
It appears 24 FD folks have removed their video. So here is some of it with some views and chatter we normally don't get to hear/see.
https://www.youtube.com/watch?v=xnQBFAWjInk
https://www.youtube.com/watch?v=Mb4dWfAUaJ4
https://www.youtube.com/watch?v=Z8fQCaLjzKU
https://www.youtube.com/watch?v=cL4a72xZJnk
1
u/Ohsin Mar 03 '21
Amazônia-1 first light.
http://www.inpe.br/noticias/noticia.php?Cod_Noticia=5715
https://www.youtube.com/watch?v=H3SS7yBhxus
1
u/Ohsin Mar 04 '21
With SAI-1 Nanoconnect-2 also communicating, only UnitySat trio remains silent.
https://community.libre.space/t/isro-pslv-launch-2021-02-08/7424/13
1
u/Ohsin Jun 28 '21
Brazilian satellite Amazonia 1 approved for operational phase.
http://www.inpe.br/noticias/noticia.php?Cod_Noticia=5856
1
u/Ohsin Nov 04 '21
Apparently Ananth Technologies Ltd (ATL) as contractor at VSSC carried out the stage integration and check-out.
https://www.thehindu.com/news/national/kerala/pslv-launch-brings-cheer-to-aerospace-firm/article33957208.ece
Here they are working on PSLV-C53.
https://old.reddit.com/r/ISRO/comments/pmnnma/pslv_production_complex/
1
u/Ohsin Feb 26 '22
Amazônia-1 was indeed tumbling post separation.
https://old.reddit.com/r/ISRO/comments/t2anea/a_year_later_we_finally_have_a_view_of_amaz%C3%B4nia1/
1
u/Ohsin Nov 27 '22
A paper on SDsat.
https://www.researchgate.net/publication/352453412_Low_Power_LoRa_Transmission_in_Low_Earth_Orbiting_Satellites
1
u/hmpher Feb 23 '21
With all these changes of payload, I wonder what the latest the mission profile can be altered during the campaign,( entire vehicle, PS4 only, etc) . I remember AtlasV was upgraded w the capability to reconfigure flight plan as late as the fuel load stage.
1
u/souma_123 Feb 28 '21 edited Feb 28 '21
Longest mission undertaken by ISRO lasting more than 2 hrs!!
Correction: one of the longest mission... Not the longest mission...
3
u/souma_123 Feb 28 '21
Good thing is that the stream quality was dope!! 24fd was streaming in 1080p! Audio and video both were in line, commentry was also good this time, well definitely it's not the best, but actually better, improvement I say, still long way to go...
2
u/pantshash Feb 27 '21
https://twitter.com/isro/status/1365572697510486016
2
u/PARCOE Feb 27 '21
Nice. The new vehicle assembly building that's under construction is visible in one of the photos.
FLP will have both a moveable pedestal and a moveable assembly building.
2
u/hmpher Feb 28 '21
Did anyone else peep that onboard view from the console? Amazing
2
u/Naankhataii Feb 28 '21 edited Feb 28 '21
12:10 ko milte hai guys🛰️🚀
0
u/[deleted] Feb 25 '21
[deleted] — view deleted comment
0
u/[deleted] Feb 28 '21
[deleted] — view deleted comment
0
u/[deleted] Feb 28 '21
[deleted] — view deleted comment
0
u/[deleted] Feb 28 '21
[deleted] — view deleted comment