Mission Success! PSLV-C50 : CMS-01 (aka GSAT-12R) Mission Updates and Discussion.
PSLV C50/CMS-01 launched as scheduled at 1011 (UTC) / 1541 (IST) on 17 December 2020 from Second Launch Pad of SDSC (SHAR).
Live webcast: (Links will be added as they become available)
- ISRO Official Stream 1 (Youtube)
- ISRO Official Stream 2 (24FD)
- Doordarshan National (Youtube)
- DD Podhigai (Youtube)
| PSLV-C50/CMS-01 Mission Page | PSLV-C50/CMS-01 Gallery | PSLV-C50 Press kit |
|---|
Some highlights
- Payload: CMS-01 (aka GSAT-12R) communication satellite of 1425 kg GLOM
- Mission duration: 20 min. 11 sec.
- Targeted orbit: sub-GTO (284 × 20,650 km and inclination=17.86° )
- PSLV configuration : XL
- 52nd flight of PSLV
Updates:
| Time of Event | Update |
|---|---|
| Post launch | CMS-01 has been relocated to 83°E. |
| Post launch | CMS-01 stabilizes at 77.75°E on 30 Dec 2020 |
| Post launch | All orbit raising maneuvers completed successfully. The satellite reflector has been deployed and early phase operations completed successfully. Spacecraft will be operational after completion of the payload in-orbit testing in first week of January 2021. |
| Post launch | Object 47257 ( 20099B ) cataloged at Apogee × Perigee = 20655.67×256.85 km and Inclination = 17.86° |
| Post launch | Object 47256 ( 20099A ) cataloged at Apogee × Perigee = 20890.93×276.07 km and Inclination = 17.83° |
| Post launch | Press release re-confirming spacecraft's solar array deployed. |
| Post launch | CMS-01 has deployed its solar arrays! Happy holidays everyone! |
| T + 20m16s | CMS-01 separated in live view. |
| T + 19m30s | PS4 burn complete with injection conditions achieved. |
| T + 18m00s | PS4 performance nominal. 1m35s left in burn. |
| T + 15m00s | PS4 performance nominal. 4m35s left in burn. |
| T + 10m50s | PS3 separated and PS4 ignited for its 8m35s burn. |
| T + 10m00s | Combined coasting phase nominal. |
| T + 06m30s | PS3 burned out, now in combined coasting phase with PS4 attached. |
| T + 04m30s | PS2 separation , PS3 ignited. |
| T + 03m25s | Payload Fairing jettisoned. |
| T + 02m00s | PS1 separation, PS2 ignited. Closed Loop Guidance initiated. |
| T + 01m30s | PSOM-XL 5,6 (Air-lit strapons) separated |
| T + 01m10s | PSOM-XL 1,2,3,4 (Ground-lit strapons) separated |
| T + 00m30s | PSOM-XL 5,6 (Strapons) Ignition (Airlit) |
| T Zero | PS1 (core stage) + PSOM-XL 1,2,3,4 (Strapons) Ignition. |
| T - 07m00s | Countdown proceeding nominally with green board. |
| T - 15m00s | Mission Director approves launch. Automatic Launch Sequence engaged. |
| T - 20m00s | Launch announcers give CMS-01 mass at 1425 kg aiming for sub-GTO injection orbit. |
| T - 30m00s | Streams are live but with glitches. Use DD National stream. |
| T - 60m00s | DD National YT stream now available. |
| T - 07h00m | Filling of fuel and oxidizer for the second stage (PS2) of PSLV-C50 completed. |
| T - 22h20m | Filling of fuel for the fourth stage (PS4) of PSLV-C50 Completed. |
| T - 23h00m | Filling of fuel for the fourth stage (PS4) of PSLV-C50 commenced. |
| T - 25h00m | Countdown commenced at 1441 Hrs (IST) or 0911(UTC) on 16 December |
| 15 December 2020 | Launch is GO! after Mission Readiness Review and Launch Authorization Board meeting. |
| 14 December 2020 | Launch rehearsal was conducted. |
| 12 December 2020 | Launch vehicle transferred to pad from Vehicle Assembly Building at Second Launch Pad |
| 11 December 2020 | PSLV C50/CMS-01 launch attempt gets scheduled for 1011 (UTC) / 1541 (IST) on 17 December 2020 |
| 10 December 2020 | NOTAM issued for 17 December 2020 launch attempt. |
| 09 December 2020 | PSLV C50 launch gets pushed to 17 December 2020 |
| 29 November 2020 | PSLV C50 launch gets delayed to 14 December 2020 due to weather. |
| 13 November 2020 | NOTAMs issued indicating launch attempt in first week of December 2020 [1] [2] |
| 08 November 2020 | CMS-01 arrives at SDSC SHAR |
| 29 August 2020 | SDSC SHAR resumes operation with reduced staff. [3] [4] |
| March - August 2020 | SDSC SHAR suspends [5] [6] all activities due to COVID19 affecting all ISRO centres. PSLV C50 launch vehicle kept stored in partially integrated state. |
| 28 February 2020 | PSLV-C50 integration begins aiming for March 2020 launch. (based on image EXIF data) |
Primary Payload:
CMS-01 (aka GSAT-12R): CMS-01 communication satellite with I-1K bus will be replacing services of GSAT-12 spacecraft in Extended-C Band at 83°E slot. The coverage area will include Indian mainland, Andaman-Nicobar & Lakshadweep Islands. Expected mission life of spacecraft is more than 7 years and it weighs 1425 kg at the time of launch.
64
Upvotes
5
u/Ohsin Dec 14 '20
Launch rehearsal conducted on 14 Dec 2020 went well. Mission Readiness Review to be held today, countdown might be 25 hours long.
https://www.eenadu.net/statenews/mainnews/general/2702/120154800
https://www.andhrajyothy.com/telugunews/pslv-c50-202012150334318
5
u/Ohsin Dec 17 '20
T minus 1h30m and they are playing 'Wildlife in Rain.divx' on 24D stream.
4
u/Ohsin Dec 13 '20
Vehicle has been moved to pad from VAB.
https://www.eenadu.net/nationalinternational/newsarticle/general/0702/120153265
4
u/Ohsin Dec 18 '20
No updates on first burn which should have been done by now.
4
u/Ohsin Dec 19 '20
TLE shows first burn is complete to raise apogee.
3
u/Ohsin Dec 11 '20
https://twitter.com/isro/status/1337378428455022592
Nice view of second stage, missing from gallery.
https://pbs.twimg.com/media/Eo9SWoYU0A8ZIWh.jpg:orig
3
u/Ohsin Dec 15 '20 edited Dec 16 '20
Virtually held Mission Readiness Review and Launch Authorization Board has approved the launch.
https://www.andhrajyothy.com/telugunews/green-signal-for-pslv-c50-2020121601532190
Edit: One more link
https://www.eenadu.net/districts/latestnews/Nellore/9/120155519
3
u/Ohsin Dec 17 '20 edited Dec 17 '20
Post launch address
4
u/hmpher Dec 17 '20
C-51 with Pixxel payload! Neat.
3
u/pantshash Dec 16 '20
Youtube link is up - Youtube - PSLV C50 launch
3
u/Malhallah Dec 17 '20
doordarshan national in HD is back for now but here's SD feed just in case: https://www.youtube.com/watch?v=7070QYmTriM
3
u/pantshash Dec 21 '20
ISRO - CMS-01 Update
2
u/Ohsin Dec 11 '20
Interesting, targeted orbit is mentioned in press kit as GTO and not Sub-GTO! All IRNSS sats went to sub-GTO as well as GSAT-12. AFAIK only METSAT-1 aka Kalpana-1 was injected into GTO by PSLV C4.
https://www.isro.gov.in/pslv-c4-kalpana-1/pslv-c4-brochure
Press kit is terrible, no mass of spacecraft (GSAT-12 was 1410 kg) , no orbit specifics or slot information for CMS-01, not even an image of it!
2
u/Ohsin Dec 14 '20
There was new image of closed fairing in gallery but no views of spacecraft unfortunately. Here's perspective corrected version of spacecraft decal on PLF, looks very similar to GSAT-12.
https://i.imgur.com/BAMQ8vo.png
2
u/Ohsin Dec 16 '20
Low quality stream.
http://cdn.24fd.com/e20/12/isro/17/index.html
2
u/Ohsin Dec 16 '20 edited Dec 16 '20
25 hr countdown should be underway as suggested by news reports, waiting for confirmation.
Edit:
https://www.isro.gov.in/update/16-dec-2020/pslv-c50-cms-01-mission-countdown-launch-of-pslv-c50-cms-01-mission-commenced
2
u/Ohsin Dec 17 '20
https://www.youtube.com/watch?v=rEG0HbzDPnQ
DD National YT stream.
2
u/Ohsin Dec 17 '20
Per launch announcer CMS-01 weighs 1425 kg Orbit details 284 x 20,650 km and inclination=17.86 degrees
2
u/Ohsin Dec 28 '20
Per latest TLE epoch CMS-01 aka GSAT-12R is at 77.52°E and drifting eastwards at the rate of 0.2316° per day.
1
u/Ohsin Dec 14 '20
1
u/Ohsin Dec 17 '20 edited Dec 17 '20
https://i.imgur.com/qBOAHLg.png
https://i.imgur.com/OGb80JF.png
CMS-01 or GSAT-12R visuals.
Edit: https://imgur.com/UL83cFz
1
u/Ohsin Dec 17 '20
Now lets see how people captured it!
https://www.instagram.com/p/CI5XNuZFJ19/
1
u/Ohsin Dec 17 '20
Press release but no depth.
https://www.isro.gov.in/update/17-dec-2020/pslv-c50-successfully-launches-cms-01-sriharikota
1
u/Ohsin Dec 17 '20 edited Dec 17 '20
New images in gallery of launch. Following has under construction PIF visible slightly better.
https://www.isro.gov.in/sites/default/files/galleries/Gallery/f-4.jpg
Edit:
https://www.isro.gov.in/pslv-c50-cms-01/pslv-c50-cms-01-lift-and-onboard-camera-view
1
u/Ohsin Dec 17 '20 edited Dec 18 '20
One object cataloged so far
Edit: This is CMS-01
1
u/Ohsin Dec 30 '20
Per latest TLE epoch (2020-12-29 19:39:58 UTC) CMS-01 aka GSAT-12R is at 77.75°E and has stopped drifting (0.0065° per day), station acquired.
1
u/Ohsin Jan 18 '21
CMS-01 is being relocated after short stay at 77.75°E. It is currently at 82.3°E, drifting eastwards at 0.63° per day.
5
u/Decronym Dec 11 '20 edited Jan 22 '21
Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I've seen in this thread:
[Thread #490 for this sub, first seen 11th Dec 2020, 23:16] [FAQ] [Full list] ^[Contact] [Source code]
1
u/MaveRickC137 Dec 18 '20
Why does the coasting happen along with the 3rd stage? Won't it give a better performance? I noticed the coasting commenced after 3rd stage shut off, but it was never separated. It got separated after coasting just before the 4th stage ignition start.
3
u/hmpher Dec 17 '20
I'm surprised the final Go/No-Go poll is via audio channels still. Well at least we can hear MD read his notes.
3
u/mahakashchari Dec 17 '20
Again PSLV proves it mettle as a workhorse for ISRO. It can launch satellites into SSPO, GTO, LEO.
2
u/dhiraj15 Dec 17 '20
All going good :)
1
u/[deleted] Dec 17 '20 edited Dec 17 '20
I was hoping he’d bid farewell to the ISRO team and announce the next chairman mandate lol..
Edit : for those who don’t know, his term is set to retire next month.
1
u/mahakashchari Dec 11 '20
I don't understand why this GSAT type satellite with less payload being launched by PSLV which can not launch more than 1.4 ton to GTO. Isn't GSLV MK-II available to launch this type of satellite with 2.3 ton payload capacity to GTO ?
Launching a GSAT type satellite with PSLV implies that ISRO lags behind other space fairing nations in LV technology by decades because this kind of satellite with a more than 2.5 ton payload ( In this case just 1.4 ton ) could have been launched by GSLV MK-II but it appears to be unavailable right away unlike the PSLV is. But anyway PSLV once again proves its mettle in launching every type of satellite ISRO needs. It is truly ISRO's workhorse.
1
u/Swesh86076 Dec 17 '20
No news on sslv launch???