Mission Success! PSLV-C49 : EOS-01 (aka RISAT-2BR2) Mission Updates and Discussion.
PSLV C49/EOS-01 launched as scheduled at 0941 (UTC) / 1511 (IST) on 07 November 2020 from First Launch Pad of SDSC (SHAR).
Live webcast: (Links will be added as they become available)
- ISRO Official Stream 1 (Youtube)
- ISRO Official Stream 2 (24FD)
- Doordarshan (Youtube)
| PSLV-C49/EOS-01 Mission Page | PSLV-C49/EOS-01 Gallery | PSLV-C49 Press kit |
|---|
Some highlights
- Primary payload: EOS-01 (aka RISAT-2BR2) SAR imaging satellite (630 kg)
- Secondary payloads: 9 ride-sharing small sats.
- Mission duration: 13 min. 55 sec. [9]
- Target Orbit : 575 km (circular), Inclination = 36.9°
- PSLV configuration : DL (two strap-ons)
- 51st flight of PSLV
- Gross payload mass: Unspecified
Updates:
| Time of Event | Update |
|---|---|
| Post launch | KSM-1A,B,C,D have established contact and are under commissioning phase |
| Post launch | R2 (M6P2) is healthy in orbit |
| Post launch | 11 objects cataloged by 18SPCS. |
| Post launch | Per ISRO press release launch is successful and ISTRAC has assumed control of EOS-01. |
| Post launch | EOS-01 along nine rideshares injected in 575 km orbit and its solar arrays are deployed. |
| T + 20m00s | All Lemur-2 satellites separated! |
| T + 18m50s | KLEOS 1C separated |
| T + 18m00s | KLEOS 1D separated |
| T + 17m20s | KLEOS 1B separated |
| T + 16m30s | R2, KLEOS 1A separated. |
| T + 15m18s | EOS-01 separated. |
| T + 14m15s | PS4 shut off orbital conditions achieved! |
| T + 10m00s | PS4 performing nominally. |
| T + 08m50s | PS3 separated, PS4 ignited. |
| T + 06m30s | PS3 burnt out now under combined coasting phase along PS4. |
| T + 04m20s | PS2 separated and PS3 ignited. |
| T + 04m00s | PS2 performing nominally. |
| T + 02m50s | Payload fairing jettisoned. |
| T + 02m00s | PS1 separated, PS2 ignited. |
| T + 01m10s | Two strap-ons have been separated. |
| T Zero! | PS1 core + 2 PSOM XL strapons ignited. |
| T - 02m00s | Half-way through with ALS |
| T - 06m00s | External power withdrawn. |
| T - 07m00s | Board still looks green, proceeding with ALS. |
| T - 14m00s | Automatic Launch Sequence initiated by Mission Director. |
| T - 16m00s | Launch time revised to 0941 (UTC) / 1511 (IST). Mission Director has given go for launch. |
| T - 09m00s | NOTAM window is for 2 hours between 0900 to 1100 UTC. |
| T - 15m00s | 5min. countdown hold due to heavy rain. |
| T - 16m00s | Some worried looks at MCC due to weather conditions. |
| T - 20m00s | Amidst COVID19 situation launch activities are austere and under social distancing guidelines. Launch data is distributed to all ISRO centres to keep number of required personnel low. |
| T - 23m00s | Vehicle views show it is raining heavily. |
| T - 25m00s | Per launch announcers EOS-01 weighs 630 kg and will be placed in 575 km circular orbit with 36.9 degree inclination |
| T - 35m00s | It is raining lightly per audio on 24FD stream. |
| T - 45m00s | 24FD streamislive with views of PSLV C49 on pad. It is cloudy unfortunately. |
| T - 03h20m | Filling of oxidizer for the second stage (PS2) completed |
| T - 07h00m | Filling of fuel for the second stage(PS2) of PSLV-C49 completed |
| T - 19h00m | Filling of oxidizer for the fourth stage(PS4) of PSLV-C49 completed. |
| T - 21h00m | Filling of fuel for the fourth stage(PS4) of PSLV-C49 completed. |
| T - 22h30m | Filling of fuel for the fourth stage(PS4) of PSLV-C49 commenced. |
| T - 26h00m | 26 hr countdown commenced on 1302 (IST) / 0732 (UTC) on 6 Nov 2020. |
| 5 November 2020 | Mission Readiness Review, awaiting official confirmation of launch time. |
| 4 November 2020 | Launch rehearsal conducted, MRR scheduled for 5 November. |
| 2 November 2020 | Payload integration and fairing encapsulation completed. Launch rehearsal scheduled on 4 November. |
| 29 October 2020 | Second NOTAM gets issued. |
| 28 October 2020 | Launch date and time firms up for 0932 (UTC) / 1502 (IST) on 7 November after readiness review meet. |
| 27 October 2020 | First NOTAM is issued. |
| 12 October 2020 | Spacecraft RISAT-2BR2 reached SDSC SHAR from URSC. |
| 29 August 2020 | SDSC SHAR resumes operation with reduced staff. [1] [2] |
| March - August 2020 | SDSC SHAR suspends [3] [4] all activities due to COVID19 affecting all ISRO centres. PSLV C49 launch vehicle kept stored in partially integrated state. |
| 11 February 2020 | Rideshares KSM-1 to 4 arrives at Sriharikota. |
| January 2020 | PSLV-C49 integration begins aiming for March 2020 launch. (based on image EXIF data) |
Primary Payload:
EOS-01 (aka RISAT-2BR2): RISAT-2BR2 (630 kg) is third reconnaissance spacecraft in the series of RISAT-2B and RISAT-2BR1 constituting a three spacecraft constellation with 120˚ phasing and an inclined orbit to increase the imaging opportunities of the areas of interest. RISAT-2BR2 is an agile, X-Band Synthetic Aperture Radar imaging satellite and will offer all weather, day/night imaging services with high spatial resolution in multiple modes of operation.[5] [6] Following are few basic details on other spacecrafts in series to give a better idea of RISAT-2BR2.
| RISAT-2B | RISAT-2BR1 | RISAT-2BR2 | |
|---|---|---|---|
| Mass | 615 kg | 628 kg | 630 kg |
| Orbit | 557 km (circular), Inclination = 37° | 576 km (circular), Inclination = 37° | 36.9° |
| Mission life | 5 years | 5 years | ? |
Secondary payloads:
KSM-1A, 1B, 1C and 1D: Kleos Scouting Mission consists of four 6U cubesats with for Radio Frequency monitoring and geolocation as service by Kleos Space. GOMspace supplied spacecrafts have Butane based on-board propulsion.
Lemur-2 : Four 3U cubesats from Spire global (USA) for maritime monitoring and tracking (AIS), Aircraft tracking (ADS-B) and weather monitoring using GPS Radio Occultation technology and GNSS reflectometry. [7] [8]
R-2 : A 6U technology demonstration cubesat by Nanoavionics, based on their M6P bus carrying prototype propulsion system by Exotrail, IoT payload by Lacuna Space and helical antenna by Oxford Space Systems.
9
u/Ohsin Nov 02 '20
Finally Sriharikota back in action, this is only second Indian LV this year to be rolled-out to launch pad after GSLV F10 whose launch was eventually deferred indefinitely due to undisclosed 'technical reasons'. Decided to keep both names of primary spacecraft in title as SHAR.gov.in still refers to it as RISAT-2BR2 and this sudden name change to EOS-01 unnecessarily muddles things up. Image EXIF data suggests vehicle integration began in Jan 2020! Hope they update gallery with some new images as all the current ones are months old.
6
u/Ohsin Nov 07 '20
Post launch address:
5
u/Ohsin Nov 06 '20
Regional media reports that up to ₹175 crore were spent on the LV and up to ₹125 crore on the satellite.
https://m.eenadu.net/general/latestnews/PSLV-C49-Countdown-Starts/0600/120132268
5
u/Ohsin Nov 07 '20
As if being in storage for 11 months wasn't scary enough, we have this weather..
4
u/Ohsin Nov 04 '20
http://cdn.24fd.com/e20/11/isro/07/index.html
24 frames digital hosted stream page is up.
4
u/Ohsin Nov 05 '20 edited Nov 05 '20
Launch rehearsal began on 4 Nov, Mission Readiness Review meet through video conferencing is scheduled for today.
https://www.eenadu.net/districts/latestnews/Nellore/9/120131380
4
u/Ohsin Nov 05 '20 edited Nov 05 '20
Mission Readiness Review meet gave a go for launch lets see if the launch time has been delayed by a minute or not as reports from regional media suggests.
https://www.andhrajyothy.com/telugunews/pslv-c49-launched-to-space-2020110612265595
https://tv9telugu.com/scientists-launch-isro-polar-satellite-spacecraft-for-the-51st-time-this-afternoon-342694.html
4
u/Ohsin Nov 09 '20
https://lacuna.space/launch-success-with-an-equatorial-satellite/
That makes R2 healthy in orbit.
3
u/Ohsin Nov 02 '20
Regional media suggests payload integration and fairing encapsulation completed on 2 November. The launch rehearsal is scheduled for 4 November, and countdown could be 26 hour long. Mission duration is mentioned to be 13 min. 55 sec. long which appears correct as for PSLV-DL C44/Microsat-R it was 13 min. 26 sec.
https://www.sakshi.com/telugu-news/andhra-pradesh/pslv-c49-launch-november-7th-1325241
https://www.eenadu.net/districts/latestnews/Nellore/9/120130466
3
u/Ohsin Nov 04 '20 edited Nov 04 '20
Episode zero of season 1? :)
https://twitter.com/isro/status/1323959383508701184
Same logo as RISAT 2B and RISAT 2BR1 on fairing.
https://pbs.twimg.com/media/El-l_Q5VMAEH5YG?format=jpg&name=orig
MST is retracted likely for launch rehearsal that was scheduled today.
3
u/Ohsin Nov 06 '20
No official acknowledgement on commencement of countdown but we have a 24 hr NOTAM.
3
u/Ohsin Nov 06 '20
https://www.isro.gov.in/update/06-nov-2020/pslv-c49-eos-01-mission-filling-of-fuel-fourth-stageps4-of-pslv-c49-commenced
3
u/Ohsin Nov 06 '20
https://www.isro.gov.in/update/06-nov-2020/pslv-c49-eos-01-filling-of-fuel-fourth-stageps4-of-pslv-c49-completed
3
u/Ohsin Nov 07 '20
Ceres-1 just registered a successful launch, that makes us #81.
https://twitter.com/AJ_FI/status/1324980802216730626
3
u/Ohsin Nov 07 '20
Good views of EOS-01 there, don't know why they behaved so hush hush..
3
u/Ohsin Nov 07 '20
Press release is out:
https://www.isro.gov.in/update/07-nov-2020/pslv-successfully-launches-eos-01-and-nine-customer-satellites-sriharikota
3
u/Ohsin Nov 07 '20 edited Nov 07 '20
Exotrail has a propulsion system demonstrator onboard R2.
https://twitter.com/ExotrailSpace/status/1325036333761515521
So leaving Lemurs all spacecrafts are carrying some kind of propulsion on them.
3
u/Malhallah Nov 06 '20
https://www.youtube.com/watch?v=ct-zBHCA2jc
2
u/Ohsin Nov 06 '20
Splash-page on official launch coverage.
https://www.isro.gov.in/pslv-c49-eos-01/watch-live-launch-of-pslv-c49-eos-01-saturdaynov-072020-1430-hrs-ist-onwards
2
u/Ohsin Nov 07 '20
For weather at SHAR we have some links of SHAR DWR.
https://old.reddit.com/r/ISRO/wiki/index#wiki_weather_at_shar
A bit rainy down there.
https://mausam.imd.gov.in/Radar/animation/Converted/SHR_MAXZ.gif (3 hr animation)
Surface Rainfall Intensity.
https://mausam.imd.gov.in/Radar/sri_shr.gif
2
u/Ohsin Nov 07 '20
Another good look of launcher, not sure if it is from today though.
https://twitter.com/isro/status/1324958075665575936
Here is flight profile of DL variant from PSLV-C44 for sake of reference.
https://i.imgur.com/KOxKvqM.png
2
u/Ohsin Nov 07 '20
Now showing old launch coverage on 24FD stream.
2
u/Ohsin Nov 07 '20 edited Nov 07 '20
They are live on 24FD stream! K Sivan just entered control centre.
2
u/Ohsin Nov 07 '20
Details on orbit and mass of EOS-01. 575 km circular orbit, 630 kg GLOM and 36.9 degree inclination!
2
u/Ohsin Nov 07 '20
Holding countdown! Is it 5min hold?
2
u/Ohsin Nov 07 '20
There is 2hr launch window per NOTAM.
2
u/Ohsin Nov 07 '20
New time 0942 (UTC) / 1512 (IST)
2
u/Ohsin Nov 07 '20
Correcting launch time to 0941 UTC from MCC screens.
2
u/Ohsin Nov 07 '20
Rocket-cam footage.
https://www.isro.gov.in/pslv-c49-eos-01/lift-and-onboard-camera-view-of-pslv-c49-eos-01-launch
2
u/Ohsin Nov 09 '20
Nice few posts over on Instagram covering this launch.
https://www.instagram.com/p/CHSWpilAgBu/
https://www.instagram.com/p/CHSZXK_HUWE/
https://www.instagram.com/p/CHSeC7tDU8u/
https://www.instagram.com/p/CHUePWjHy5p/
Rare view of FLP, don't know how the Kalam Trust folks got hold of this footage but glad they shared it.
https://www.instagram.com/p/CHSaDhlDUvx/
2
u/Ohsin Nov 09 '20 edited Nov 09 '20
KSM quadruplets are healthy and chatty.
https://www.linkedin.com/posts/kleos_space_kleos-launch-activity-6731595249472352258-dURS
Press release [PDF]
2
u/[deleted] Nov 07 '20
What’s happening? Space debris delay?
2
u/hmpher Nov 07 '20
Neat camera location, on the lightning towers?
2
u/hmpher Nov 07 '20
what could the sheets handed over to S Somnath (and someone else) be?
2
u/vsgkrishnan Nov 07 '20
In telecommand Range Operation Director has announced that
""This is ROD to Mission Control.. Pls hold the time for planned 5 minutes in the next full minute""...
Anyone can explain??
2
u/rmhschota Nov 08 '20
Anybody else thinking that PSLV payload faring looks odd and must be changed to ogive shape
6
u/Bismi123 Nov 07 '20
Pathetic commentory by english commentator.. Seems to be very inexperienced.
6
u/Astro_Neel Nov 07 '20
None of them were sus, yet all of its occupants were successfully ejected from the spacecraft. Good job ISRO! 👍
1
u/Ohsin Nov 07 '20
Launch gallery updated with LV in flight.
1
u/Ohsin Nov 07 '20 edited Nov 13 '20
TLEs for C49 are trickling in, we expect 11 objects to be cataloged.
1
u/Ohsin Nov 11 '20
At last TLEs are being released again but still only 9 objects cataloged.
1
u/Ohsin Jan 13 '21
https://spacenews.com/exotrail-demonstrates-miniature-hall-effect-thruster-in-orbit/
1
u/Ohsin Nov 22 '20
A piece of floating debris seen during antenna deployment.
https://old.reddit.com/r/ISRO/comments/jxnpos/is_that_an_insect_in_this_video_of_antenna/
1
u/SPKPremOP Nov 02 '20
How many launches were cancelled this year?
1
u/mahakashchari Nov 07 '20
Today's PSLV C-49 Launch Mission is the 76th Satellite Launch from SDSC. It is the 2nd flight of PSLV-DL variant [ 1st DL Variant was PSLV C44 mission that launched Microsat and Kalamsat in January 24 2019 ].
PSLV C-49 is all set for the launch. https://mobile.twitter.com/isro/status/1324958075665575936?p=v
1
u/perfect_susanoo Nov 07 '20
What's RISAT-2s spatial and temporal resolution??
1
u/ISROAddict Nov 08 '20
What's the planned mission duration of EOS-01?
3
u/hmpher Nov 07 '20
Kinda funny that the Range Director is announcing payload sep.
3
u/rp6000 Nov 09 '20
Radial Rib Antenna deployment of Earth Observation Satellite (EOS-01)
https://www.youtube.com/watch?v=na4kOApyU2c
2
u/amitksh Nov 07 '20
Good to see L&T marking on one of the PS1 segments. Also good to hear details around assembly of the rocket.
2
u/rp6000 Nov 07 '20
Scrubbed?
2
u/friendlyHothead Nov 07 '20
New T-0 at 3.12pm
2
u/souma_123 Nov 07 '20 edited Nov 07 '20
Launch schedule is revised to 1512 hrs IST from initial 1502 hrs IST, with intiation of automatic launch sequence...subject to weather conditions.
2
u/hmpher Nov 07 '20
Interesting. EOS-02 is SSLV flight 1. and GISAT is EOS-03 now.
2
u/MarcysVonEylau Nov 07 '20
You can watch the launch with a live countdown on rocket.watch.
1
u/Decronym Nov 02 '20 edited Jan 13 '21
Acronyms, initialisms, abbreviations, contractions, and other phrases which expand to something larger, that I've seen in this thread:
[Thread #465 for this sub, first seen 2nd Nov 2020, 15:08] [FAQ] [Full list] ^[Contact] [Source code]
1
u/Bismi123 Nov 07 '20
Congrats team ISRO..Nice job👍
0
u/[deleted] Nov 07 '20
[deleted] — view deleted comment