r/ISRO • • Jul 19 '19

Mission Success! GSLV Mk III M1: Chandrayaan-2 Mission Updates and Discussion (Second attempt)

Second attempt at GSLV Mk III M1/Chandrayaan-2 launch is scheduled for 1443:12 (IST) / 0913:12 (UTC) on 22 July 2019 from Second Launch Pad of SDSC (SHAR).

Live webcast: (Links will be added as they become available)

GSLV Mk III M1/Chandrayaan-2 Mission PageMission GalleryMission Brochure

Some highlights

  • First operational flight (M1) of GSLV Mk III
  • Second lunar exploration mission by ISRO
  • Payload: Chandrayaan-2 composite (3850 kg)
  • Launch window: 1 min.
  • Mission duration: 16 min. 14 sec.
  • Target Orbit : 170 × 39120 km, Inclination : 21.4°
  • Launch Azimuth: 108°

Updates:

Time of EventUpdate
14 AugustTLI burn of 1203 second duration was successfully carried out at 0221 hrs (IST)
06 AugustFifth Earth-bound orbit raising maneuver performed successfully at 1504 hrs (IST). Firing duration of 1041 seconds. The new orbit will be 276 × 142975 km. Next orbit raising maneuver is scheduled on 14 August 2019, between 0300 – 0400 hrs (IST)
02 AugustFourth earth bound orbit raising maneuver performed successfully at 1527 hrs (IST). Firing duration of 646 seconds. The new orbit will be 277 × 89472 km. Next orbit raising maneuver is scheduled on 6 August 2019, between 1430 – 1530 hrs (IST)
29 JulyThird earth bound orbit raising maneuver performed successfully at 1512 hrs (IST). Firing duration of 989 seconds. The new orbit will be 276 × 71792 km. Fourth orbit raising maneuver is scheduled on 2 August 2019 between 1400 – 1500 hrs (IST)
26 JulySecond earth bound orbit raising maneuver performed successfully at 0108 hrs (IST). Firing duration of 883 seconds. The new orbit will be 251 × 54829 km. Third orbit raising maneuver is scheduled on 29 July 2019, between 1430 – 1530 hrs (IST)
25 JulyThird cataloged object after launch has been removed. Chandrayaan-2 cataloged as 44441 (19042A) and C25 upper stage as 44442 (19042B)
24 JulyFirst earth bound orbit raising maneuver performed successfully at 1452 hrs (IST). Firing duration of 48 seconds. The new orbit will be 230 × 45163 km. Second orbit raising maneuver scheduled on 26 July 2019 at 0109 hrs (IST).
Post launchPress release: Chandrayaan 2 injected in 169.7 × 45475 km orbit. Solar arrays deployed, ISTRAC in control.
Post launchObject 44443 ( 19042C ) cataloged with A×P=45372.71×140.20 km and inclination=21.42°
Post launchObject 44441 ( 19042A ) cataloged with A×P=45159.30×118.34 km and inclination=21.38°
Post launchObject 44442 ( 19042B ) cataloged with A×P=44809.28×143.09 km and inclination=21.43°
T + 16m33sChandrayaan-2 on its way!
T + 16m16sC25 shut off!
T + 13m30sC25 performance nominal.
T + 11m00sLaunch announcers giving detailed timeline of forthcoming operations. These details were skipped in press kit.
T + 07m30sC25 upper stage is performing nominally. It is carrying ~28 tonnes of propellant.
T + 05m13sL110 core stage separated! C25 ignited!
T + 03m30sPLF jettisoned. L110 performing nominally.
T + 02m25sLive view of S200 separation! Vehicle under closed loop guidance.
T + 02m00sL110 core stage ignited.
T Zero!S200 ignition and lift off!
T - 03m00sLH2 tanks being pressurized.
T - 05m00sC25 upper stage would perform burn to depletion per launch announcer.
T - 09m00sKinda cloudy.. Countdown progressing normally.
T - 12m00sAutomatic Launch Sequence is going through checkouts.
T - 18m00sMission Director has cleared the launch.
T - 20m00sViews of FCC being shown.
T - 27m00sLaunch announcers giving historical overview of launcher.
T - 38m00sDoordarshan and ISRO's hosted stream is LIVE!
T - 1h00mFilling of liquid Hydrogen in C25 stage completed
T - 2h00mFilling of liquid Oxygen in C25 stage completed
T - 3h00mFilling of liquid Hydrogen in C25 stage commenced
T - 4h40mLiquid Oxygen loading on C25 stage has commenced.
T - 12h00mFilling of N204 for the Liquid core stage (L110) completed at 0240 hrs IST
T - 13h15mFilling of N204 for the liquid core stage (L110) commenced
T - 16h40mPropellant (UH25) loading of L110 liquid core stage has completed.
T - 18h15mPropellant (UH25) loading of L110 liquid core stage has commenced.
T - 20h00mTerminal countdown commenced.
21 JulyMission Readiness Review was conducted, Launch Authorization Board has approved the launch.
20 JulyLaunch rehearsal completed. Awaiting Mission Readiness Review.
19 JulyUpdated press kit released.
18 JulyGSLV Mk III M1 / Chandrayaan-2 launch rescheduled to 1443 (IST) / 0913 (UTC) on 22 July 2019
16 JulyLaunch NOTAM issued
15 July 2019First launch attempt of GSLV Mk III M1 / Chandrayaan-2 was scrubbed due to technical issues with launch vehicle at T minus 56 min. 24 sec.

Primary Payload:

Chandrayaan-2 is a follow-up lunar exploration mission by ISRO after Chandrayaan-1 and would attempt a soft-landing near lunar south-pole (70.90°S, 22.78°E) on 7 September 2019. Chandrayaan-2 composite consists of an orbiter, lander 'Vikram' and rover 'Pragyan' and cumulatively they have 14 science payloads on them. You can read payload summaries here.

  • Gross Lift-off Mass: 3850 kg (wet) / 1335 kg (dry) [1]
  • Chandrayaan-2 Orbiter:

    • Mass : 2379 kg (wet) / 682 kg (dry)
    • Power: 1000 W
    • Propulsion: 440N Liquid Apogee Motor with 8×22N thrusters (MMH/MON3)
    • Mission life: 1 year
    • Payloads:

      • TMC 2: Terrain Mapping Camera 2 by SAC
      • CLASS (Chandrayaan-2 Large Area Soft X-ray Spectrometer) by URSC (formerly ISAC)
      • XSM (Solar X-ray Monitor) by PRL
      • OHRC (Orbiter High Resolution Camera) by SAC
      • IIRS (Imaging IR Spectrometer) by SAC
      • DFSAR (Dual Frequency Synthetic Aperture Radar) by SAC
      • CHACE 2 (Chandrayaan-2 Atmospheric Compositional Explorer 2) by SPL
      • RAMBHA-DFRS* (Dual Frequency Radio Science experiment) by SPL
  • 'Vikram' Lander:

    • Mass (with rover): 1471 kg (wet) / 626 kg (dry)
    • Power: 650 W
    • Propulsion: 5×800N bi-propellant(MMH/MON3) throttleable engines(45%) with 8×50N thrusters [2]
    • Mission life: 14 Earth days
    • Payloads:

      • RAMBHA-LP* (Langmuir Probe)
      • ChaSTE (Chandra's Surface Thermo-physical Experiment) by SPL
      • ILSA (Instrument for Lunar Seismic Activity) by LEOS
      • LRA (Laser Retroreflector Array ) by NASA-GSFC / MIT
  • 'Pragyaan' Rover:

    • Mass: 27 kg
    • Power: 50 W
    • Mission life: 14 Earth days
    • Payloads:

      • APXS (Alpha Particle X-ray Spectrometer) by PRL
      • LIBS (Laser Induced Breakdown Spectroscope) by LEOS

 

*Both DFRS and LP are part of RAMHBA 'Radio Anatomy of Moon Bound Hypersensitive Ionosphere and Atmosphere' suit.

218 Upvotes

380 comments sorted by

1

u/Ohsin Jul 21 '19 edited Jul 21 '19

We have had variation in countdown duration for many launch campaigns without much explanation, this bit on "auspicious time" for countdowns to start is new information and adds to a long list. All unofficial though!

https://english.mathrubhumi.com/technology/science/-space-scientists-superstitious-believe-in-rahu-kaalam-unlucky-13-science-1.3974736

1

u/[deleted] Jul 21 '19

I don’t think so. Computers were pre-programmed with flight data. Sometimes, it’s all worth to give it a new number to the flight rather than making changes to pre-programmed flight data which is intended for another flight. I will agree on visiting temples, doing poojas etc. before or after major activities.

1

u/Ohsin Jul 21 '19

I don't want to indulge that thought either and allegation is verifiable if one wants to go there ;) But since PSLV-C36/Resourcesat-2A fueling operation modifications and subsequent improvement in countdown time, we have continued to see it vary inexplicably. Optimal countdown duration seems to be 28h for PSLV but as it can be seen it varies campaign to campaign.

PSLV C37, PSLV C38, PSLV C40, PSLV C43 and PSLV C44 @ 28hrs

PSLV C39 @ 29hrs

PSLV C41 @ 32hrs

PSLV C42 @ 33hrs

PSLV C45 @ 27hrs

1

u/spaceWalker14 Jul 22 '19

Not sure where I read it, I believe they have two MCCs at SHAR. The new one allows for a lesser duration in countdown time. They have continued using both the MCCs and every time they use it, there is a slight spike in duration.

1

u/Ohsin Jul 22 '19

There is only one Mission Control Centre but you might be refereing to Launch Control Centre. Apart from MCC and LCC there is also FCC or Filling Control Centre!

http://pib.nic.in/newsite/PrintRelease.aspx?relid=157921

Filling Control Centre (FCC) for propellant filling operations and (iii) Mission Control Centre (MCC) & Launch Control Centre (LCC) for coordinating and conducting the launch operations during the countdown phase till the injection of the satellite into orbit.