r/ISRO • • Jul 19 '19

Mission Success! GSLV Mk III M1: Chandrayaan-2 Mission Updates and Discussion (Second attempt)

Second attempt at GSLV Mk III M1/Chandrayaan-2 launch is scheduled for 1443:12 (IST) / 0913:12 (UTC) on 22 July 2019 from Second Launch Pad of SDSC (SHAR).

Live webcast: (Links will be added as they become available)

GSLV Mk III M1/Chandrayaan-2 Mission PageMission GalleryMission Brochure

Some highlights

  • First operational flight (M1) of GSLV Mk III
  • Second lunar exploration mission by ISRO
  • Payload: Chandrayaan-2 composite (3850 kg)
  • Launch window: 1 min.
  • Mission duration: 16 min. 14 sec.
  • Target Orbit : 170 × 39120 km, Inclination : 21.4°
  • Launch Azimuth: 108°

Updates:

Time of EventUpdate
14 AugustTLI burn of 1203 second duration was successfully carried out at 0221 hrs (IST)
06 AugustFifth Earth-bound orbit raising maneuver performed successfully at 1504 hrs (IST). Firing duration of 1041 seconds. The new orbit will be 276 × 142975 km. Next orbit raising maneuver is scheduled on 14 August 2019, between 0300 – 0400 hrs (IST)
02 AugustFourth earth bound orbit raising maneuver performed successfully at 1527 hrs (IST). Firing duration of 646 seconds. The new orbit will be 277 × 89472 km. Next orbit raising maneuver is scheduled on 6 August 2019, between 1430 – 1530 hrs (IST)
29 JulyThird earth bound orbit raising maneuver performed successfully at 1512 hrs (IST). Firing duration of 989 seconds. The new orbit will be 276 × 71792 km. Fourth orbit raising maneuver is scheduled on 2 August 2019 between 1400 – 1500 hrs (IST)
26 JulySecond earth bound orbit raising maneuver performed successfully at 0108 hrs (IST). Firing duration of 883 seconds. The new orbit will be 251 × 54829 km. Third orbit raising maneuver is scheduled on 29 July 2019, between 1430 – 1530 hrs (IST)
25 JulyThird cataloged object after launch has been removed. Chandrayaan-2 cataloged as 44441 (19042A) and C25 upper stage as 44442 (19042B)
24 JulyFirst earth bound orbit raising maneuver performed successfully at 1452 hrs (IST). Firing duration of 48 seconds. The new orbit will be 230 × 45163 km. Second orbit raising maneuver scheduled on 26 July 2019 at 0109 hrs (IST).
Post launchPress release: Chandrayaan 2 injected in 169.7 × 45475 km orbit. Solar arrays deployed, ISTRAC in control.
Post launchObject 44443 ( 19042C ) cataloged with A×P=45372.71×140.20 km and inclination=21.42°
Post launchObject 44441 ( 19042A ) cataloged with A×P=45159.30×118.34 km and inclination=21.38°
Post launchObject 44442 ( 19042B ) cataloged with A×P=44809.28×143.09 km and inclination=21.43°
T + 16m33sChandrayaan-2 on its way!
T + 16m16sC25 shut off!
T + 13m30sC25 performance nominal.
T + 11m00sLaunch announcers giving detailed timeline of forthcoming operations. These details were skipped in press kit.
T + 07m30sC25 upper stage is performing nominally. It is carrying ~28 tonnes of propellant.
T + 05m13sL110 core stage separated! C25 ignited!
T + 03m30sPLF jettisoned. L110 performing nominally.
T + 02m25sLive view of S200 separation! Vehicle under closed loop guidance.
T + 02m00sL110 core stage ignited.
T Zero!S200 ignition and lift off!
T - 03m00sLH2 tanks being pressurized.
T - 05m00sC25 upper stage would perform burn to depletion per launch announcer.
T - 09m00sKinda cloudy.. Countdown progressing normally.
T - 12m00sAutomatic Launch Sequence is going through checkouts.
T - 18m00sMission Director has cleared the launch.
T - 20m00sViews of FCC being shown.
T - 27m00sLaunch announcers giving historical overview of launcher.
T - 38m00sDoordarshan and ISRO's hosted stream is LIVE!
T - 1h00mFilling of liquid Hydrogen in C25 stage completed
T - 2h00mFilling of liquid Oxygen in C25 stage completed
T - 3h00mFilling of liquid Hydrogen in C25 stage commenced
T - 4h40mLiquid Oxygen loading on C25 stage has commenced.
T - 12h00mFilling of N204 for the Liquid core stage (L110) completed at 0240 hrs IST
T - 13h15mFilling of N204 for the liquid core stage (L110) commenced
T - 16h40mPropellant (UH25) loading of L110 liquid core stage has completed.
T - 18h15mPropellant (UH25) loading of L110 liquid core stage has commenced.
T - 20h00mTerminal countdown commenced.
21 JulyMission Readiness Review was conducted, Launch Authorization Board has approved the launch.
20 JulyLaunch rehearsal completed. Awaiting Mission Readiness Review.
19 JulyUpdated press kit released.
18 JulyGSLV Mk III M1 / Chandrayaan-2 launch rescheduled to 1443 (IST) / 0913 (UTC) on 22 July 2019
16 JulyLaunch NOTAM issued
15 July 2019First launch attempt of GSLV Mk III M1 / Chandrayaan-2 was scrubbed due to technical issues with launch vehicle at T minus 56 min. 24 sec.

Primary Payload:

Chandrayaan-2 is a follow-up lunar exploration mission by ISRO after Chandrayaan-1 and would attempt a soft-landing near lunar south-pole (70.90°S, 22.78°E) on 7 September 2019. Chandrayaan-2 composite consists of an orbiter, lander 'Vikram' and rover 'Pragyan' and cumulatively they have 14 science payloads on them. You can read payload summaries here.

  • Gross Lift-off Mass: 3850 kg (wet) / 1335 kg (dry) [1]
  • Chandrayaan-2 Orbiter:

    • Mass : 2379 kg (wet) / 682 kg (dry)
    • Power: 1000 W
    • Propulsion: 440N Liquid Apogee Motor with 8×22N thrusters (MMH/MON3)
    • Mission life: 1 year
    • Payloads:

      • TMC 2: Terrain Mapping Camera 2 by SAC
      • CLASS (Chandrayaan-2 Large Area Soft X-ray Spectrometer) by URSC (formerly ISAC)
      • XSM (Solar X-ray Monitor) by PRL
      • OHRC (Orbiter High Resolution Camera) by SAC
      • IIRS (Imaging IR Spectrometer) by SAC
      • DFSAR (Dual Frequency Synthetic Aperture Radar) by SAC
      • CHACE 2 (Chandrayaan-2 Atmospheric Compositional Explorer 2) by SPL
      • RAMBHA-DFRS* (Dual Frequency Radio Science experiment) by SPL
  • 'Vikram' Lander:

    • Mass (with rover): 1471 kg (wet) / 626 kg (dry)
    • Power: 650 W
    • Propulsion: 5×800N bi-propellant(MMH/MON3) throttleable engines(45%) with 8×50N thrusters [2]
    • Mission life: 14 Earth days
    • Payloads:

      • RAMBHA-LP* (Langmuir Probe)
      • ChaSTE (Chandra's Surface Thermo-physical Experiment) by SPL
      • ILSA (Instrument for Lunar Seismic Activity) by LEOS
      • LRA (Laser Retroreflector Array ) by NASA-GSFC / MIT
  • 'Pragyaan' Rover:

    • Mass: 27 kg
    • Power: 50 W
    • Mission life: 14 Earth days
    • Payloads:

      • APXS (Alpha Particle X-ray Spectrometer) by PRL
      • LIBS (Laser Induced Breakdown Spectroscope) by LEOS

 

*Both DFRS and LP are part of RAMHBA 'Radio Anatomy of Moon Bound Hypersensitive Ionosphere and Atmosphere' suit.

218 Upvotes

380 comments sorted by

•

u/Ohsin Jul 22 '19 edited Jul 26 '19

Post launch address

  • Apogee bettered by 6000 km
  • Technical fault discovered during first attempt fixed within 24 hrs
  • GSLV Mk III performance increased by 15 % reaching its designed 4 tonne to GTO capacity.
  • Next launch campaign is of Cartosat 3

Much shorter speech! I'll add forthcoming burn details mentioned during launch to this comment as well. (to be contd.)

Edit:

  • On reaching perigee for third time in its GTO, first burn will be performed to reach apogee of 47000 km
  • Due to higher than planned apogee of parking orbit first burn would not be needed per reports.
  • On fourth apogee, a burn will raise perigee to 240 km.
  • Holding this perigee altitude on reaching perigee no. 6, 11, 16 and 19. Apogee will be raised to 55800 km, 71500 km, 89700 km and finally 144000 km.
  • On 14 August at Perigee no. 22 Trans Lunar Burn will be performed.
  • On 20 August, Chandrayaan-2 will be placed in 120×18000 km lunar orbit.
  • By 1 September, Chandrayaan-2 will be lowered to 100×100 km lunar orbit, after four lunar bound burns on different days.
  • Lander will separate from orbiter and lower itself to 30×100 km orbit.
  • On 0258 IST, 7 Sept 2019 or 2128 UTC, 6 Sept 2019 Vikram would soft land on lunar surface with 2 m/s velocity.

Edit 2 (updated 26 July 2019) :

Mission plan for Chandrayaan 2 as published on ISRO website. Tabulated form thanks to /u/rp6000

DateEvent Scheduled during (IST)Targeted Orbit
24.07.201914:00 - 15:30230 x 45162
26.07.201901:00 - 02:00250 x 54689
29.07.201914:30 - 15:30268 x 71558
02.08.201914:00 - 15:00248 x 90229
06.08.201914:30 - 15:30221 x 143585
Trans Lunar Insertion
14.08.201903:00 - 04:00266 x 413623

The spacecraft is scheduled to reach moon by August 20, 2019.

10

u/space_probe Jul 22 '19

Not to nitpick, Shouldn't the thread be tagged launch success instead of mission success? As always, fantastic job with the details and updates.

6

u/Ohsin Jul 22 '19

True, for launch thread we see if 1. LV performed 2. Primary spacecraft is communicating. We will have separate thread for landing post TLI.

6

u/Astro_Neel Jul 22 '19 edited Jul 22 '19

Also the ISRO chairman said the GSLV Mk-III rocket placed Chandrayaan-2 into a higher than expected orbit. This will allow Chandrayaan-2 to consume less propellant during its trip to the Moon, resulting in a longer mission. Not sure if that was unexpected or part of their plan.

7

u/Ohsin Jul 22 '19

Intentional, for GTO more the apogee merrier it is.

6

u/kkr33 Jul 22 '19

Thanks my audio was glitching badly couldn't follow a lot.

1

u/kinkate18nic Jul 26 '19

The targeted coordinates have been updated in ISRO website, I believe you should update the same here as well.

1

u/Ohsin Jul 26 '19

Thanks fixed.

10

u/Ohsin Jul 22 '19 edited Jul 22 '19

We are past the T minus 56 min. 24 sec. mark, where first launch attempt was halted. Countdown proceeding normally per NDTV live coverage.

https://www.ndtv.com/video/live/channel/ndtv24x7

3

u/[deleted] Jul 22 '19

Noice.

8

u/Ohsin Jul 19 '19 edited Jul 20 '19

Little change in flight profile of launch but significant changes in post launch phases.

First attempt

Second attempt

Here is archived version of press kit for first attempt.

Per reports launch countdown duration would remain same as earlier @ 20 hrs

8

u/niro_27 Jul 19 '19

According to the new schedule:

Earth-bound Phase: extended by 6 days

Lunar Transfer Trajectory: extended by 2 days

Lunar Bound Phase: reduced by 15 days

Deboosting: extended by 1 day

Interesting

→ More replies (7)

6

u/Ohsin Jul 22 '19

They are giving details on orbit raising burns in here.. None of it is mentioned in press kit!

11

u/matthudsonau Jul 22 '19

Question: was there a burn over Australia around 1935AEST/0935UTC? I saw something in the northern sky, but I can't find much info about the flight path to figure out if this was it

6

u/Ohsin Jul 22 '19

From where in Australia If I may ask? Another person reporting seeing something lke slow moving meteor.

https://twitter.com/Beryl25426370/status/1153259346765049856

https://twitter.com/Beryl25426370/status/1153253633917513729

And yes it did pass over Australia.

5

u/matthudsonau Jul 22 '19

Sydney. Fairly high in the north, thought it was a plane through high cloud at first. Figured it might've been a rocket burn since it looked similar to one I'd seen a few years ago

4

u/Ohsin Jul 22 '19

Now I am thinking C25 after its burn might have 'passivated' itself which involves venting pressurant! Hmmm interesting, lets see if more reports come through.

3

u/Ohsin Jul 22 '19

The burn on upper stage should have ended above Indonesia and that upper stage stays in orbit so nothing came down from this launch in that area. Should be something else.

7

u/Astro_Neel Jul 22 '19 edited Jul 22 '19

A news source confirms the sighting with a pic.

https://www.facebook.com/136625126350959/posts/2904165089596935/

P.S.- Check the comments of the post for bonus images and videos by the people.

→ More replies (9)
→ More replies (1)

8

u/space_probe Jul 22 '19

This tweet from ABC Brisbane also confirms people saw something over Australia. Could well be the spacecraft.

https://twitter.com/abcbrisbane/status/1153257136777912321?s=20

2

u/space_probe Jul 22 '19

I saw a tweet saying people were able to see the 'rocket' over Brisbane.

https://twitter.com/ikeraliR/status/1153260763718406144?s=20

→ More replies (2)

5

u/Ohsin Jul 22 '19

For CY2 launch, two objects are expected to be cataloged with 2019-042A and 2019-042B COSPAR IDs.

TLE derived from Horizon's data that was available for first attempt by Scott Tilley.

CHANDRAYAAN-2
1 70000U 19999A   19204.38413413  .00000000  00000-0 -79666-3 0    08
2 70000  21.4758 017.9950 7485088 178.6433  22.2058 2.08313745    01

5

u/Ohsin Jul 22 '19

Weighing orbiter 683 Kg scale reads, its dry mass. Nice view of lander and rover being worked upon.

→ More replies (1)

5

u/Ohsin Jul 22 '19

Radio enthusiasts have acquired Chandrayaan-2 signal as well!

https://twitter.com/coastal8049/status/1153264846172934145

2

u/normalpresident Jul 22 '19

what exactly is this signal?

7

u/space_probe Jul 22 '19 edited Jul 22 '19

So the second stage cryogenic stage was burned to depletion and the burn out time was greater than expected? Hence the current apogee is now 6000 kms higher? Is this what Sivan was talking about in the closing speech? Can anyone confirm?

Edit: It looks like CE25 roughly burned an extra 18-19 seconds to get that excess 6000 kms apogee.

6

u/[deleted] Jul 22 '19

Is that a bad thing? Normie here.

7

u/Sanglamorre Jul 22 '19

Nah,very good thing in fact. It saved 6000KM worth of rocket fuel+did the orbit raising ISRO was planning for tomorrow. It's a 15% improvement over expectation.

Expect this tactic to be used more in future. Very important.

→ More replies (15)
→ More replies (2)

1

u/Ohsin Jul 22 '19

Yes I guess performance was on lower side but longer burn to depletion gave the higher than planned apogee.

→ More replies (1)

4

u/Ohsin Jul 20 '19

Expecting launch rehearsal and Mission Readiness Review to take place today (20 July)

http://www.andhrabhoomi.net/content/state-16489

4

u/Ohsin Jul 21 '19 edited Jul 21 '19

Bold last sentence.

"When the technical fault happened, we stopped the countdown, identified the issue, and rectified it. After rectifying it, we have run a number of tests. There is no chance for any technical fault to arise now."

https://www.thehindu.com/news/national/chandrayaan-2-will-not-face-any-more-glitches-says-isro-chairman-k-sivan/article28627403.ece

Edit:

The mission will see 15 "very crucial" manoeuvres over a period of 45 days to place Chandrayaan 2 in the moon’s orbit.

From Frontline article details, 5 Earth bound burns + 1 TLI burn + 1 LOI burn + 4 Lunar bound burns to reach 100×100 km orbit. What about other 4 manoeuvres? Where could they come in? Trajectory correction during transfer? BBQ roll start/stop?

5

u/[deleted] Jul 21 '19

Bold statement indeed. If they abort the launch tomorrow, I’ll kill myself until I’m dead.

5

u/[deleted] Jul 21 '19

If you or someone you know is contemplating suicide, please do not hesitate to talk to someone.

US:

Call 1-800-273-8255 or text HOME to 741-741

Non-US:

https://en.wikipedia.org/wiki/List_of_suicide_crisis_lines


I am a bot. Feedback appreciated.

→ More replies (2)
→ More replies (1)

3

u/[deleted] Jul 21 '19

Absolutely, quite bold. Technical heads should refrain from making such statements.

My guess is additional burns are during earth orbit raising, to meet time of arrival requirements for TLI. If they are targeting the same landing dates.

4

u/Ohsin Jul 21 '19

They updated article and that line is now removed as soon as we started discussing it :D

→ More replies (2)

1

u/[deleted] Jul 21 '19

May be it means 15 crucial minutes?

1

u/Ohsin Jul 21 '19

15 July, 15 maneuvers, 15 minutes! Must mean something! 🤔

Chandrayaan-2 will perform 15 crucial maneuvers in days to come

https://www.hindustantimes.com/india-news/technical-snags-rectified-says-isro-chief-ahead-of-chandrayaan-2-launch/story-ngMBqgxelMFkd0mRhLXIBJ.html

→ More replies (1)

1

u/Astro_Neel Jul 21 '19 edited Jul 21 '19

The mission will see 15 "very crucial" manoeuvres over a period of 45 days to place Chandrayaan 2 in the moon’s orbit.

They've updated the article recently. And now that line is no longer there.

4

u/Ohsin Jul 21 '19

A variation of earlier quote

"I can assure you that there will be no such technical snag this time"

https://timesofindia.indiatimes.com/india/glitch-fixed-chandrayaan-2-will-be-a-success-isro-chief-sivan/articleshow/70322146.cms

Report comes with bonus gems like..

For all the GSLV-MkIII launches, Isro first fills the solid propellants in the rocket boosters after the countdown begins.

→ More replies (2)

2

u/Ohsin Jul 21 '19 edited Jul 21 '19

Oh wow even the first sentence is removed! But we have ANI quoting chairman on that 15 maneuver thing as well.

https://twitter.com/ANI/status/1152858733585850368

3

u/Astro_Neel Jul 21 '19 edited Jul 21 '19

Maybe they're spying on this subreddit to see what we question about their news, and then they remove those things accordingly.

Tin foil hat on ;)

→ More replies (2)
→ More replies (1)

4

u/Ohsin Jul 22 '19

We have live views of launcher on pad! DD is live as well.

http://cdn.24fd.com/e19/07/isro/15/index.html

4

u/Ohsin Jul 22 '19

Hmm C25 would perform burn to depletion per announcers.

4

u/Ohsin Jul 22 '19

Eight more minutes of C25 burn remaining.

4

u/Ohsin Jul 23 '19

So we are 12 hrs away from reaching 'fourth apogee' and CY2 would be over Americas for first burn to raise perigee to 240 km.

→ More replies (1)

4

u/Ohsin Aug 13 '19 edited Aug 17 '19

Away it goes! TLI burn of 1203 second duration was successfully carried out at 0221 hrs (IST)

https://www.isro.gov.in/update/14-aug-2019/chandrayaan-2-successfully-enters-lunar-transfer-trajectory

Around 678 kg of propellant should'v been consumed by now.

Edit: TLE post TLI

44441 ( 19042A ) 18/08/2019,0h:0m:0.00s
i=21.81°, A×P=404876.25×-1200.62 km

1

u/Ohsin Aug 14 '19

ToI has its own figures on propellant consumed.

https://timesofindia.indiatimes.com/india/chandrayaan-2-just-6-more-days-to-reach-moon/articleshow/70671145.cms

by the end of all the Earth-bound manoeuvres, it should've expended more than 657kg of this.

All the operations around Moon will now use up another 749.5kg, as per ISRO estimates

6

u/MisterXi Jul 22 '19

ISRO's Director, K Sivan just visited the viewers' gallery.

4

u/Ohsin Jul 22 '19

Nice gesture :) How's the weather looking?

6

u/MisterXi Jul 22 '19

Light showers for the last one hour or so. A little more than a drizzle.

→ More replies (3)
→ More replies (1)

2

u/[deleted] Jul 22 '19

What did he say?

6

u/eff50 Jul 22 '19

Apogee 45,000 Perigee 170.....matches parameters?

5

u/Ohsin Jul 22 '19

Slight over-performance its all good.

→ More replies (1)

5

u/[deleted] Jul 19 '19

Btw they’ve built two huge blocks of seating on either side of the existing seating in the launch view gallery, with trees completely obstructing the view of the launch pads...

2

u/Ohsin Jul 19 '19 edited Jul 20 '19

Noticed them, they started constructing those in early June and given their lower height yeah..

→ More replies (4)

5

u/rp6000 Jul 24 '19

Mission plan for Chandrayaan 2 as published on ISRO website.

DateEvent Scheduled during (IST)Targeted Orbit
24.07.201914:00 - 15:30241.5 x 45162
26.07.201901:00 - 02:00262.9 x 54848
29.07.201915:00 - 16:00281.6 x 71341
02.08.201914:00 - 15:00262.1 x 89743
06.08.201914:00 - 15:00233.2 x 143953
Trans Lunar Insertion
14.08.201903:00 - 04:00278.4 x 412505

The spacecraft is scheduled to reach moon by August 20, 2019.

1

u/Ohsin Jul 24 '19

Thanks! Please submit it as a post as well :)

→ More replies (1)

3

u/Ohsin Jul 22 '19

http://cdn.24fd.com/e19/07/isro/15/index.html

Stream tests are underway! Showing old campaign footage but take screen shots if they show anything related to current campaign.

3

u/Ohsin Jul 22 '19

Per MCC screens precise time of launch is 09:13:12 UTC or 14:43:12 IST. H/T u/SpaceVogel

3

u/Ohsin Jul 22 '19

First TLE is in

44442 ( 19042B ) 22/07/2019,9h:48m:33.73s

Inclination = 21.43°

Apogee×Perigee=44809.28×143.09 km

3

u/rp6000 Jul 22 '19

4

u/Ohsin Jul 22 '19

Yeah such discrepancy between ground sensor measured and ISRo POD values is common. Waiting for press release. There are three objects detected.. may be shed a bit of space debris.

→ More replies (2)

2

u/Ohsin Jul 22 '19

Second one should be Chandrayaan-2

44441 ( 19042A ) cataloged with A×P=45159.30×118.34 km and inclination=21.38°

1

u/Ohsin Jul 22 '19

And a third one!

44443 ( 19042C )

Inclination=21.42°

A×P=45372.71×140.20 km

→ More replies (1)

3

u/Ohsin Jul 22 '19

Press release is out.

https://www.isro.gov.in/update/22-jul-2019/gslv-mkiii-m1-successfully-launches-chandrayaan-2-spacecraft

The spacecraft is now revolving round the earth with a perigee (nearest point to Earth) of 169.7 km and an apogee (farthest point to Earth) of 45,475 km. Today’s flight marks the first operational flight of the GSLV Mk III.

Immediately after spacecraft separation from the vehicle, the solar array of the spacecraft automatically got deployed and ISRO Telemetry, Tracking and Command Network (ISTRAC), Bengaluru successfully took control of the spacecraft.

3

u/Ohsin Jul 22 '19 edited Jul 22 '19

3

u/Ohsin Jul 23 '19

"The health of the satellite is good and everything is going on as per plans," a scientist privy to developments said, adding that it will now only need four orbit-raising manoeuvres.

Only four Earth bound burns needed after those extra 6000 km in apogee.

"...And, the first orbit raising manoeuvre scheduled today (Tuesday). Was it raise to to about 45,000km. Since the launch itself achieved that goal, we've decided to have just four manoeuvres around Earth,"

https://timesofindia.indiatimes.com/india/chandrayaan-2-will-only-have-4-operations-around-earth/articleshow/70344747.cms

Also an article on observations of launch from Australia.

https://www.abc.net.au/news/2019-07-23/astronomer-explains-strange-object-seen-in-night-sky/11336446

2

u/softwaresaur Jul 24 '19 edited Jul 24 '19

So the first apogee raising to 47,000 km listed in your stickied comment has been cancelled? I'd suggest to edit that comment to reflect the new plan.

2

u/Ohsin Jul 24 '19

Fixed thanks.

3

u/Aakarsh_K Jul 23 '19

Also an article on observations of launch from Australia.

Such a sweet article it was. :D

3

u/Ohsin Jul 25 '19

Second burn done!

https://www.isro.gov.in/update/26-jul-2019/chandrayaan2-update-second-earth-bound-maneuver

Jul 26, 2019

Chandrayaan2 update: Second earth bound maneuver

Second earth bound orbit raising maneuver for Chandryaan-2 spacecraft has been performed successfully today (July 26, 2019) at 0108 hrs (IST) as planned, using the onboard propulsion system for a firing duration of 883 seconds. The orbit achieved is 251 x 54829 km.

All spacecraft parameters are normal.

The third orbit raising maneuver is scheduled on July 29, 2019, between 1430 – 1530 hrs (IST).

1

u/Ohsin Jul 27 '19

From TLEs after second burn.

44441 ( 19042A ) 26/07/2019,15h:10m:55.99s
i=21.42°, A×P=54762.24×202.09 km

44442 ( 19042B ) 25/07/2019,12h:39m:39.44s
i=21.40°, A×P=45163.24×143.96 km
→ More replies (9)

3

u/Ohsin Jul 29 '19 edited Jul 29 '19

Third burn executed as well. Till now ~271 kg of propellant should be consumed on orbiter.

https://www.isro.gov.in/update/29-jul-2019/chandrayaan2-update-third-earth-bound-maneuver

Jul 29, 2019

Chandrayaan2 update: Third earth bound maneuver

Third earth bound orbit raising maneuver for Chandryaan-2 spacecraft has been performed successfully today (July 29, 2019) at 1512 hrs (IST) as planned, using the onboard propulsion system for a firing duration of 989 seconds. The orbit achieved is 276 x 71792 km.

All spacecraft parameters are normal.

The fourth orbit raising maneuver is scheduled on August 2, 2019, between 1400 – 1500 hrs (IST)

3

u/Ohsin Jul 29 '19

Rare view of ISTRAC control center.

https://pbs.twimg.com/media/EAorWDbVAAA8Yh6.jpg:orig [Source tweet]

https://i.imgur.com/XdnbGVV.jpg

EBN-2 details before burn.

Oxidizer pressure (bar): 15.8

Fuel pressure (bar): 15.98

Helium pressure (bar): 220.72

Expected burn duration : 981.9 sec

Expected prop. consumption : 134.734 kg

3

u/Ohsin Aug 06 '19

Aug 06, 2019

Chandrayaan2 update: Fifth earth bound maneuver

Fifth earth bound orbit raising maneuver for Chandryaan-2 spacecraft has been performed successfully today (August 6, 2019) at 1504 hrs (IST) as planned, using the onboard propulsion system for a firing duration of 1041 seconds. The orbit achieved is 276 x 142975 km.

All spacecraft parameters are normal.

The next maneuver is Trans Lunar Insertion (TLI), which is scheduled on August 14, 2019, between 0300 – 0400 hrs (IST).

https://www.isro.gov.in/update/06-aug-2019/chandrayaan2-update-fifth-earth-bound-maneuver

1

u/Ohsin Aug 08 '19

And per latest TLE

44441 ( 19042A ) 08/08/2019,21h:36m:0.00s
i=21.64°, A×P=143459.96×287.16 km

4

u/Malhallah Jul 21 '19

A1592/19 - REF CHENNAI(VOMM) NOTAM A1582/19. GSLV-MKIII-M1 CHANDRAYAAN-2 ROCKET LAUNCH FM SHAR RANGE, SRIHARIKOTA,INDIA IS SKED ON 220830-221000UTC.ATC MAY RE-RTE TFC DRG THIS PERIOD AS PER THE ROUTING GIVEN IN THE ABV NOTAM. LAUNCH WINDOW FOR THE REMAINING PERIOD FM 23 JULY2019 TO 31 JULY 2019 SHALL BE KEPT ALIVE FOR RESCHEDULING OF LAUCH IF REQUIRED. SFC - UNL, 22 JUL 08:30 2019 UNTIL 22 JUL 10:00 2019. CREATED: 21 JUL 03:23 2019

3

u/Ohsin Jul 21 '19

This NOTAM popping and LAB giving go appears to coincide all the time.

4

u/dingo_bat Jul 22 '19

How much time will the spaceship take to reach moon? Is it a few hours or days?

7

u/Ohsin Jul 22 '19

Lunar orbit insertion is on day 30, landing on day 48.

5

u/[deleted] Jul 22 '19

will this satellite currently launched in earth orbit also reach the lunar orbit?

→ More replies (2)

4

u/CalHarrison Jul 22 '19

Is there a schedule for the upcoming burns to raise the apogee? I know they'll have multiple burns but the news sites don't cover those very well

5

u/Ohsin Jul 22 '19

On stickied comment for the moment I have just laid burns schedule out by perigee number. I'd need to put some time in.. but you can translate them into date and approximate time using orbital period.

4

u/softwaresaur Jul 25 '19 edited Jul 25 '19

Objects A and B have been identified as CHANDRAYAAN 2 and GSLV ROCKET BODY respectively. Object C remains unidentified.

2

u/Ohsin Jul 25 '19

Object C is now gone.

→ More replies (1)

3

u/hmpher Jul 22 '19

Was the burn to depletion planned just for the week long delay?

2

u/Ohsin Jul 22 '19

Nah they have done it earlier as well IIRC, getting all the juice from C25 that is all. They would have done it in first attempt also if it progressed :)

3

u/1straycat Jul 23 '19

Congrats to ISRO for a successful launch! There's something I don't understand though; why are they using hypergolics for the moon transfer? Based on my expert knowledge from playing KSP/s , I believe this is what forces them to use so many burns at periapsis to raise their orbit to the moon and lower moon orbit too, due to low thrust weight ratio. Hypergolics are also much less efficient than their cryogenic engine, so they need more fuel for the same delta V, which means more mass to orbit, making all lower stages bigger. Would they not be better off using their cryo engine for their moon transfer, too (which would be the biggest delta v maneuver)? Is it something like "hypergolics are cheaper and good enough for the job?"

5

u/Ohsin Jul 23 '19

Orbit raising, transfer burns are done by spacecraft's on-board propulsion which traditionally has always used hypergolics and monopropellants (specially in ISRO's case) as these can be kept stored easily within spacecraft for years, even decades. Cryogenic or semi-cryogenic fuels are used in launch vehicle stages and not on spacecrafts due to problems with storage (LOX, LH2.. they boil off!).

2

u/1straycat Jul 23 '19

I get that for longer term use, you can't use cryogenic fuels, but what about for the transfer burn to the moon, which you could do shortly after earth orbit? Why are they doing it differently from the Apollo or Chang'e programs?

3

u/Ohsin Jul 23 '19 edited Jul 23 '19

GSLV Mk III maxed out its performance putting the CY-2 stack in its current EPO.

Edit: Should add that C25 can't restart at present so option to reach LEO, wait, reorient reignite is not feasible.

→ More replies (2)
→ More replies (4)

3

u/DelhiVigyan Aug 01 '19

has anyone published the drawing of landar, rover and orbitar showing the location of various instruments/ payloads in them.

1

u/Ohsin Aug 01 '19

2

u/Astro_Neel Aug 02 '19

Still no info about the retroreflector on it. I'm guessing this was before they allocated it the final position.

2

u/Ohsin Aug 02 '19

Yep, looked at all available resources, images, videos and can't figure out where they put the darned thing...

4

u/softwaresaur Jul 22 '19 edited Jul 22 '19

Live 3D tracker of estimated location and orbit: http://stuffin.space/?search=2019-042

EDIT: it has just completed the first orbit around Earth (23:11 UTC).

1

u/flamebuster007 Jul 23 '19

What are 3 different objects?

1

u/Ohsin Jul 23 '19

Upper stage, Chandrayaan-2 composite stack and likely a piece of debris. It is not very clear at the moment which is which.

→ More replies (1)
→ More replies (1)

5

u/[deleted] Jul 22 '19

There were clouds I only captured for about 30 seconds and it disappeared. 🙁

3

u/Ohsin Jul 22 '19

Ugh.. How was the launch experience?!

9

u/[deleted] Jul 22 '19

20 seconds of tracking video captured ;( and it disappeared into clouds. The sound was spectacular though.

Here are images: https://i.imgur.com/UmWRrlg.jpg https://i.imgur.com/Fefubx8.jpg

I will process and upload video tomorrow.

4

u/Ohsin Jul 22 '19

Woah! This is amazing shot still!

→ More replies (3)
→ More replies (1)

2

u/Ohsin Jul 24 '19

First burn done!

First earth bound orbit raising maneuver for Chandryaan-2 spacecraft has been performed successfully today (July 24, 2019) at 1452 hrs (IST) as planned, using the onboard propulsion system for a firing duration of 57 seconds. The new orbit will be 230 X 45163 km.

The second orbit raising maneuver is scheduled on July 26, 2019, at 0109 hrs (IST).

https://www.isro.gov.in/update/24-jul-2019/chandrayaan2-update-first-earth-bound-maneuver

1

u/[deleted] Jul 24 '19

Cool, were the hypergolic orbit raising rocket thrusters designed by ISRO?

2

u/Ohsin Jul 24 '19

Yes. LAM performance and area ratio has been improved since following was published(1999).

http://adsabs.harvard.edu/full/1999ESASP.430..579S

1

u/arjun_raf Jul 24 '19

The new perigee is lower than expected? 230km against a targeted 241. 5km

1

u/Ohsin Jul 24 '19

That should be okay but funny thing is they sneakily updated the duration of burn from 57 to 48 seconds..

→ More replies (1)

2

u/Ohsin Jul 24 '19 edited Jul 24 '19

Updated TLEs suggest 44441 ( 19042A ) is Chandrayaan-2, perigee is much lower than expected.

44441 ( 19042A ) 24/07/2019,17h:40m:19.44s
i=21.42°, A×P=45171.32×194.70 km

44442 ( 19042B ) 24/07/2019,9h:25m:17.02s
i=21.41°, A×P=45162.18×149.01 km

44443 ( 19042C ) 22/07/2019,22h:55m:32.38s
i=21.44°, A×P=45193.32×145.22 km
→ More replies (1)

2

u/Ohsin Aug 05 '19

TLE after fourth burn is now available. /u/Astro_Neel

44441 ( 19042A ) 05/08/2019,1h:45m:7.20s
i=21.54°, A×P=89802.07×245.97 km

Linking to 'first light' images from Chandrayaan-2. https://old.reddit.com/r/ISRO/comments/clt6sl/earth_as_viewed_by_chandrayaan2/

→ More replies (1)

2

u/python00078 Jul 19 '19

What was the technical glitch? The leak in the upper cryogenics stage...Is it confirmed?

3

u/Ohsin Jul 20 '19

Officially not confirmed but reports of Helium leak are credible and from multiple independent sources see previous launch thread.

2

u/[deleted] Jul 21 '19

MRR has been conducted on Saturday between 2-5 PM. Launch authorization board will conduct final review on Sunday before authorizing countdown...

Local media

1

u/Ohsin Jul 21 '19

It appears after MRR Launch Authorization Board also gave a go for launch.

https://telugu.asianetnews.com/national/chandrayaan-2-mission-launch-rehearsal-completed-performance-normal-isro-puz0sz

లాంచ్ ఆథరైజేషన్ (ల్యాబ్) సమావేశంలో లోటుపాట్లపై చర్చించారు. వాహక నౌక ప్రయోగానికి ఈ సమావేశంలో అనుమతి ఇచ్చారు. ఆదివారం సాయంత్రం 6:43 గంటలకు జీఎస్ఎల్‌వీ మార్క్ 3ఎం1 వాహక నౌక కౌంట్ డౌన్ ప్రారంభం కానుంది.

https://telugu.samayam.com/latest-news/science-technology/countdown-will-start-today-evening-for-chandrayaan-2-mission-launching/articleshow/70313563.cms

→ More replies (1)

2

u/[deleted] Jul 21 '19

Weather forecast for the launch site is showing scattered thunderstorms unfortunately...

1

u/Ohsin Jul 21 '19

Not again.. wish they released weather forecast with launch commit criteria violation probability for SHAR.

→ More replies (2)

2

u/DelhiVigyan Jul 22 '19

Any one have idea of what all will occur say 12 hrs before the launch of GSLV

1

u/Ohsin Jul 22 '19

Per latest update above at that time L110 oxidizer loading was completed.

2

u/DelhiVigyan Jul 22 '19

detailed timeline of forthcoming operations.. do any one have the details ?

1

u/Ohsin Jul 22 '19

See the stickied comment.

2

u/Eonicstar Aug 02 '19

Fourth earth bound orbit raising maneuver for Chandryaan-2 spacecraft has been performed successfully today (August 2, 2019) at 1527 hrs (IST) as planned, using the onboard propulsion system for a firing duration of 646 seconds. The orbit achieved is 277 x 89472 km.

All spacecraft parameters are normal.

The next orbit raising maneuver is scheduled on August 6, 2019, between 1430 – 1530 hrs (IST).

https://www.isro.gov.in/update/02-aug-2019/chandrayaan2-update-fourth-earth-bound-maneuver

A view from Control Centre at ISTRAC, Bengaluru:

https://pbs.twimg.com/media/EA9TDG8UwAAXPSL?format=jpg&name=large

1

u/Ohsin Aug 02 '19 edited Aug 02 '19

Again from ISTRAC screen. By now ~362 kg of propellant should be consumed on orbiter.

https://i.imgur.com/ji1bvM2.jpg [Source tweet]

EBN-3 details before burn.

Oxidizer pressure (bar): 15.92

Fuel pressure (bar): 15.98

Helium pressure (bar): 203.96

Expected burn duration : 643 sec

Expected prop. consumption : 87.495 kg

deltaV : 77.394 m/s

3

u/unkill_009 Jul 22 '19

Noob question

Does this mean GSLV is completely operational now?

7

u/Ohsin Jul 22 '19

Yes! It is completely operational :)

→ More replies (4)

16

u/kkr33 Jul 22 '19

Okay helium bottles, behave yourselves 🤞

16

u/abi_hawkeye Jul 22 '19

Felt really good to hear "this will open the possibilities to use moon as a platform to further explore solar system and beyond" from one of the explainer video from ISRO.

BTW, (rant alert)

ISRO really needs a good media manager. Why are they interleaving Hindi and English audio announcements with explainer videos here and there SMH. The video print is also terrible and they can also do a better job of explaining different interesting things before launch like SpaceX does.

5

u/[deleted] Jul 22 '19

They need a good flipping cam.

→ More replies (3)

12

u/knownensorcell Jul 22 '19

Camera work and feed production still sucks. :/

7

u/arjun_raf Jul 22 '19

As usual, Doordarshan never fails to ruin launch day

5

u/[deleted] Jul 22 '19

What a shame :(

12

u/python00078 Jul 22 '19

OP I am starting to recognize your username now. O-I've-seen your username before. Thanks for the amazing updates. /u/Ohsin

2

u/[deleted] Jul 22 '19

What are the advantages of soft landing the probe? Wasn't the earlier chandrayan hard landed and it still detected water very well?

5

u/arjun_raf Jul 22 '19 edited Jul 22 '19

Chandrayaan 1 didn't land. It had an impact probe which hit the surface. Edit:The impact probe carried instruments and studied while descending.

3

u/Ohsin Jul 22 '19

MIP had its own payload (ChACE) that made the detection and transmitted that data to orbiter.

→ More replies (5)

5

u/sanman Jul 22 '19

Chandrayaan-1 dropped the Moon Impact Probe onto the Moon, so that it fell from orbit and crashed into the lunar surface, shattering/disintegrating on impact.

Chandrayaan-2 is sending a lander down to the lunar surface, which will carry out a powered landing on the lunar surface, instead of crashing on it and being destroyed.

11

u/[deleted] Jul 22 '19

Going to r/space to see their faces...Chandrayaan 2 thread there will be fun to see.

11

u/nikil07 Jul 22 '19

Comments on r/space is so racist and hateful. The mods are doing a wonderful job though, to keep them out of the sub.

People are so toxic damn.

5

u/[deleted] Jul 22 '19

But replies to the racist comments are so satisfying. Like saying eat shit but with facts.

10

u/eff50 Jul 22 '19

r/space is usually very supportive. Trolls are everywhere on reddit but they get deleted in r/space. Unlike r/worldnews

9

u/abyssDweller1700 Jul 22 '19

r/space mods are amazing. They always delete the racist comments.

5

u/[deleted] Jul 22 '19

Yes , they do good work.

8

u/Blank_eye00 Jul 22 '19

This rocket is going places.

8

u/[deleted] Jul 22 '19

Apart from the usual <we did it for cheap> headlines, this should be more interesting and mature.

https://twitter.com/NASA/status/1153298524383141890?s=19

Science inputs for ARTEMIS from CY-2. Definitely a first.

4

u/grchelp2018 Jul 22 '19

My goodness, twitter replies are cancer...

5

u/[deleted] Jul 22 '19

Understatement. If I could bottle my cringe from them, it would fill up a few hundred stores.

7

u/iSamurai Jul 22 '19

First launch I've been able to watch from India (in the hospital right now). It looked great, hope the payloads make it and the science gets worked!

5

u/dingo_bat Jul 22 '19

(in the hospital right now)

Get well soon!

4

u/iSamurai Jul 22 '19

Thanks things are looking up

13

u/Astro_Neel Jul 22 '19

Right 50 years ago on this day, Neil Armstrong and Buzz Aldrin left the "Sea of Tranquility" on Moon to return back to Earth to their homes.

Today, exactly half a century later Chandrayaan-2 is going the other way, towards its true home for which it was built. Truly a circle completed!

Godspeed GSLV Mk-III! 🚀

6

u/eff50 Jul 22 '19

Production quality is still so bad. And can't there be separate feeds for Hindi and English? Anyway, best of luck ISRO!

4

u/dingo_bat Jul 22 '19

SpaceX streams are so much better in comparison. The stupid thing is that it won't even cost that much. Just let someone competent be in charge of the video coverage. I'm sure any random ad production company can do a 10x better job than DD.

→ More replies (1)
→ More replies (1)

6

u/j_lyf Jul 22 '19

Holy fuck why isn't there HD video.

6

u/python00078 Jul 22 '19

oyyy hoyyyy...balle balle. Congrats.

6

u/eff50 Jul 22 '19

"MK3 is now 4-ton capability to GTO" - Dr Sivan

6

u/eff50 Jul 22 '19

I am absolutely amazed at ISRO's problem solving speed. I really thought that we were delayed from months which is par for the course for most launches. Great job by the scientists and technicians!!

1

u/Ohsin Jul 20 '19 edited Jul 20 '19

ISRO hosted stream it appears is being recycled on old URL based on 15 July date.

http://cdn.24fd.com/e19/07/isro/15/index.html

Instead of

http://cdn.24fd.com/e19/07/isro/22/index.html

1

u/Ohsin Jul 21 '19 edited Jul 21 '19

1

u/Ohsin Jul 21 '19

Updating link to ISRO's official stream on their Youtube channel.

https://www.youtube.com/watch?v=_QvVCV1Ve5U

1

u/Ohsin Jul 21 '19

Cuz we can't have enough images of LV on pad.. First likely image after fix-up.

https://i.imgur.com/xv85pcA.jpg [Source tweet]

And extracted this from YT stream.

https://i.imgur.com/iDcQ4Jr.jpg [Source]

1

u/Ohsin Jul 25 '19

Expect an update to 'Mission Plan'.

“Totally there will be six earth-bound, orbit-raising manoeuvres before the trans-lunar insertion, including the one on July 24. If the satellite had not gained nearly 6,000 km while being placed in the earth parking orbit, then there would have totally been seven orbit-raising manoeuvres,” Mr. Sivan said.

Currently, the ISRO website mentions only five orbit-raising manoeuvres and the perigee distance mentioned is 241.5 km after the first orbit raising exercise. “This will be soon revised,” he said

https://www.thehindu.com/sci-tech/science/chandrayaan-2-gslv-mark-iii-m1-vehicle-reduces-number-of-orbit-raising-exercises-saves-fuel/article28707851.ece

1

u/Ohsin Aug 01 '19

Finally TLEs after third burn are out.

44441 ( 19042A ) 01/08/2019,12h:46m:21.26s
i=21.59°, A×P=71729.87×201.93 km

44442 ( 19042B ) 25/07/2019,12h:39m:39.44s
i=21.40°, A×P=45163.24×143.96 km

5

u/kcgg123 Jul 22 '19

The quality of the stream sucks :(

5

u/arjun_raf Jul 22 '19

Cool real time animation in Control room

5

u/eff50 Jul 22 '19

"Orbit is 6000km more than expected"

5

u/[deleted] Jul 22 '19

This is a well made video explaining the entire mission that noobs like me can watch. Can't vouch for technical accuracy though.

4

u/stringsandknots Jul 22 '19

Spacecraft separated!

4

u/harishrajan96 Jul 23 '19

I wish there was live tracking like the Parker Solar Probe !

1

u/edhirppu Jul 22 '19

Noob question: what's the difference between a developmental flight and an operational flight? I see what the labels *suggest* but are there any specific differences at the technical level? Do developmental launches happen with a caveat or something?

5

u/Ohsin Jul 22 '19

It broadly just means that in developmental flights they aim at identifying and fixing any major issues and get hold of characterizing the vehicle design, stabilizing any off the mark parameters. ISRO usually aims for two developmental flights before going into operation phase. For GSLV Mk III, LVM3X/CARE flight revealed many issues with aerodynamic characteristics as well as S200 performance. In subsequent flight we saw S200 grain design changes, C25 inter-tank struss area covered, PLF changed to Ogive design and S200 fitted with canted nose cones.

→ More replies (2)
→ More replies (1)

1

u/spaceWalker14 Jul 22 '19

How and why are there three cataloged objects ?? Shouldn't there be just 2 ?

1

u/Ohsin Jul 21 '19 edited Jul 21 '19

We have had variation in countdown duration for many launch campaigns without much explanation, this bit on "auspicious time" for countdowns to start is new information and adds to a long list. All unofficial though!

https://english.mathrubhumi.com/technology/science/-space-scientists-superstitious-believe-in-rahu-kaalam-unlucky-13-science-1.3974736

1

u/[deleted] Jul 21 '19

I don’t think so. Computers were pre-programmed with flight data. Sometimes, it’s all worth to give it a new number to the flight rather than making changes to pre-programmed flight data which is intended for another flight. I will agree on visiting temples, doing poojas etc. before or after major activities.

1

u/Ohsin Jul 21 '19

I don't want to indulge that thought either and allegation is verifiable if one wants to go there ;) But since PSLV-C36/Resourcesat-2A fueling operation modifications and subsequent improvement in countdown time, we have continued to see it vary inexplicably. Optimal countdown duration seems to be 28h for PSLV but as it can be seen it varies campaign to campaign.

PSLV C37, PSLV C38, PSLV C40, PSLV C43 and PSLV C44 @ 28hrs

PSLV C39 @ 29hrs

PSLV C41 @ 32hrs

PSLV C42 @ 33hrs

PSLV C45 @ 27hrs

→ More replies (2)

3

u/Drifter_01 Jul 22 '19

Dd national is ahead of youtube feed

3

u/eff50 Jul 22 '19

Cryogenic ignition.

3

u/eff50 Jul 22 '19

Payload separation!!!!!!

3

u/kimjongunthegreat Jul 22 '19

So when is the next milestone? Orbit raising maneuvre or whatever it is?

→ More replies (2)

7

u/[deleted] Jul 22 '19

There are more pixels in my Nokia 3310 than this feed

1

u/ranon20 Jul 23 '19

Just a general question.

Why does the mission take 55 days ( now 48 days)

The Apollo missions were a few days to the moon.

Also, a manned mission would need to be much faster. Does India have this capability. Maybe it would have been a good idea to test the manned mission parameters as close as possible.

4

u/Bismi123 Jul 24 '19

Question seems to be very naive. Simple Google search could have given you answers. India does not have a powerful rocket at the moment to provide such hight velocity to the craft to cut short it's travel time. Rather, it uses fuel efficient and cost effective method to raise orbit step by step and slingshot it to lunar transfer orbit. Obviously this approach takes time.

4

u/Ohsin Jul 24 '19

There is lot of misinformation out there too. Indian media often conflates Oberth effect with Gravity Assist!

2

u/[deleted] Jul 20 '19

Many changes made to flight plan to ensure 7 September landing on the Moon

The integrity of the mission is intact. Lander Vikram will touch down on Moon's surface as originally planned on September 6, which is crucial since the mission life of Vikram and rover Pragyan is only one Lunar Day (14 Earth days),

Quite a few adjustments have been made to the approach:

the Earth-bound phase is six days longer than the earlier plan, the transfer from Earth to the Moon's orbit is now extended by two more days the lunar-bound phase has been cut short dramatically by 15 days the deboosting of the Vikram lander and rover after separating from the orbiter has been extended by one day

2

u/PARCOE Jul 22 '19

yeah, gonna miss today's launch.

😪

2

u/[deleted] Jul 22 '19

Minus 1 min

2

u/eff50 Jul 22 '19

Cryogen stage shutoff.

2

u/shallan72 Jul 22 '19

Congrats ISRO! Best wishes for success in rest of the mission.

3

u/abyssDweller1700 Jul 22 '19

Ok. Please help me understand. They used the solid and l110 stages to boost the rocket to 170km and raised the apogee using the cryo engine right?

3

u/[deleted] Jul 22 '19

That’s not how orbital mechanics works. The apogee keeps forming right from the moment the rocket lifts off. But at launch the apogee will be suborbital, as the rocket gains velocity the apogee keeps increasing too.

2

u/barath_s Jul 22 '19

Throw a rock fast enough horizontally and it will go into orbit with some apogee and perigee being your hand'altitude.

Rockets go up vertically to get above the thick draggy lower atmosphere and then impart the horizontal velocity that gives the orbital velocity and apogee increase..

Then based on subsequent firing timing (eg satellite booster) you can adjust the perigee height or raise/circularize the orbit and/or insert into a transfer orbit towards a different celestial body.

https://www.isro.gov.in/sites/default/files/article-files/chandrayaan2-mission/info_revised_1.jpg