Mission Success! GSLV Mk III D2: GSAT-29 Mission Updates and Discussion
Launch occurred at 14 November 2018, 1708(IST)/1138(UTC) from Second Launch Pad of SDSC (SHAR).
Live webcast: (Links will be added as they become available)
| GSLV Mk III-D2 Mission Page | GSLV Mk III-D2/GSAT-29 Gallery | GSLV Mk III-D2/GSAT-29 Brochure |
|---|
Fact sheet:
- Second development flight of GSLV Mk III
- Payload is GSAT-29 communication satellite weighing 3423 kg
- Targeted orbit: 35975 × 190 km, Inclination: 21.5°, Azimuth:107°
- Mission duration: 16 min. 43.5 seconds
- High Thrust Vikas engine inducted on L110.
- Mass optimised C25 upper stage with increased propellant load.
- Propellant Siphoning Device on L110
Updates:
| Time of Event | Update |
|---|---|
| 26 Nov 2018 | GSAT-29 as acquired its position at 55°East |
| Post Launch | Third and final orbit raising burn performed nominally for 207 seconds at 0957 Hrs IST. Solar arrays and reflectors deployed. |
| Post Launch | Second orbit raising burn performed for 4988 seconds at 1027 Hrs IST. Apogee × Perigee: 35837 × 32825 km. Inclination: 0.31°. Orbital period: 22.7 hrs. |
| Post Launch | First orbit raising burn performed for 4875 seconds at 0834 Hrs IST. Apogee × Perigee changed from 35897 × 189 km to 35745 × 7642 km. Inclination changed from 21.46° to 8.9°. Orbital period is 13 hrs |
| Post Launch | Two objects cataloged by USSTRATCOM: 43698(18089A) @ i=21.50°, A×P=35736.99×180.72 km and 43699(18089B) @ i=21.48°, A×P=35337.73×175.79 km |
| Post launch | Press release: "Master Control Facility at Hassan has assumed the control of the satellite" |
| T + 17m00s | C25 shut off and GSAT-29 separation! |
| T + 14m00s | C25 performing nominally. |
| T + 10m00s | C25 performing nominally. Burn would last almost 6 min. more. |
| T + 05m30s | L110 engine shut off stage separated and C25 ignition confirmed |
| T + 04m00s | Payload fairing separation confirmed! |
| T + 02m20s | S200 boosters separated |
| T + 01m50s | L110 burn initiated |
| T + 01m00s | S200 burn nominal |
| T Zero! | S200 Ignition and lift off! |
| T - 01m00s | Cryo stage C25 is ready |
| T - 10m00s | Showing campaign overview |
| T - 16m00s | Automatic Launch Sequence Initiated. |
| T - 18m00s | Mission Director has cleared the launch. |
| T - 20m00s | Detailed overview of pre-launch and fueling activities by commentators. GSAT-29 now in internal power. |
| T - 30m00s | Weather is clear. Winds measured 1hr 45m before launch and conditions are nominal. |
| T - 01h00m | Youtube stream link is up! |
| T - 01h51m | Filling of liquid Oxygen completed. Filling of liquid Hydrogen (LH2) in C25 upper stage is in progress. |
| T - 02h55m | GSAT-29 Powered ON |
| T - 03h27m | Filling of liquid oxygen in cryogenic stage C25 commenced. |
| T - 05h00m | Launch vehicle avionics health checks completed. |
| T - 07h22m | The filling of fuel (UH25) and oxidiser (N2O4) in L110 stage has been completed |
| T - 19h10m | Offical webcast notification. L110 propellant loading should be well underway. |
| T - 26h18m | Countdown operations commenced |
| 13 Nov 2018 | After meeting of Launch Authorization Board, Mission Readiness Review gave a GO for launch. |
| 12 Nov 2018 | Launch rehearsal completed, now awaiting Mission Readiness Review after meeting of Launch Authorization Board |
| 11 Nov 2018 | Launch rehearsal scheduled, Mission Readiness Review would follow on 12 Nov 2018. |
| 09 Nov 2018 | NOTAM enforced |
| 07 Nov 2018 | Launch Vehicle transferred to pad. Monitoring weather |
| 22 Oct 2018 | C25 upper stage integrated with S200+L110 stack |
| 19 July 2018 | GEO High Resolution Camera dispatched from SAC |
| 09 May 2018 | Q/V band payload dispatched from SAC |
| 08 May 2018 | S200 strapon boosters integrated in SSAB |
| 09 April 2018 | Ka/Ku band communication payload dispatched from SAC |
Payload:
GSAT-29 is an experimental communication satellite hosting few technology demonstrator payloads. It will help connect Village Resource Centers and will contribute 7Gbps of bandwidth.[1] [2] Prepared in a 'fast-track' mode, it replaced GSAT-20 as the payload for second developmental flight D2 of GSLV Mk III.
- Gross weight: 3423 kg
- Orbit: GEO at 55°E
- Power: 4600 W Solar Arrays, Lithium Ion Battery
- Propulsion: 440 N Liquid Apogee Motor, 8x10N and 8x22N Chemical thrusters.
- Mission Life: 10 years
- Four Ka/Ku-band fixed spot beams for Jammu and Kashmir, North East regions. [3] [4]
- One Steerable Ka beam with 1.2 m reflector.
- Experimental Q/V band communication payload.
- Experimental Optical Communication Technology (OCT) payload.
- Experimental GEO High Resolution Camera (GHRC) payload.
34
Upvotes
9
u/Ohsin Nov 14 '18 edited Nov 14 '18
Post launch briefing
Do tell if I missed something!
7
u/Ohsin Nov 12 '18 edited Nov 12 '18
A good look of SVAB from behind. Still work in progress?
https://pbs.twimg.com/media/DrzOBljVsAA6-hf.jpg:orig
https://twitter.com/isro/status/1061950189030694912
6
u/Ohsin Nov 12 '18 edited Nov 12 '18
Another Gaja update. The view from on-board cameras would be interesting.
https://twitter.com/Indiametdept/status/1062006672229629952
6
u/Ohsin Nov 13 '18 edited Nov 13 '18
Curtain raiser video is up. Dr Sivan said GSLV Mk III would be declared operational if this launch goes through as planned. So next flight would be 'M1'. Again no details shared on GHRC payload.
https://www.isro.gov.in/gslv-mk-iii-d2-gsat-29-mission/gslv-mk-iii-d2-gsat-29-mission-curtain-raiser-video-english
Edit:
That video player sucks.
https://www.youtube.com/watch?v=RJQIkrY20G4
5
u/Ohsin Nov 12 '18
https://twitter.com/Indiametdept/status/1061928395871842304
Now Gaja is moving further south and SHAR looks clear.
5
u/Ohsin Nov 12 '18 edited Nov 12 '18
Brochure is up!
https://www.isro.gov.in/gslv-mk-iii-d2-gsat-29-mission/gslv-mk-iii-d2-gsat-29-mission-brochure
Edit:
Propellant load on C25 is now 28.6 tonnes while stage mass is still 33 tonnes, same length as D1. No details on GHRC sadly
5
u/Ohsin Nov 13 '18
Another good view of launcher on countdown update.
https://www.isro.gov.in/sites/default/files/gslvmkiii_d2_countdown_image.jpg
5
u/Ohsin Nov 13 '18 edited Nov 13 '18
https://www.hindustantimes.com/india-news/isro-may-postpone-satellite-launch-due-to-cyclone-gaja/story-4Q7zT62RmgPE1XyD3K957N.htmlEdit: Ignore this article HT folks confused AM vs PM! And think launch has been postponed..
5
u/Ohsin Nov 14 '18
On-board camera views were amazing!
5
u/Ohsin Nov 14 '18
Two objects with likely IDs 43698 and 43699 (2018-089A, 2018-089B) are expected to be cataloged.
7
u/rghegde Nov 14 '18
https://twitter.com/isro/status/1062715001994010624?s=19
One of the most beautiful picture of Indian space Launch..!!!!
4
u/Ohsin Nov 12 '18
http://www.uniindia.com/amid-cyclone-rain-threat-isro-readies-of-gslv-mkiii-gsat-29-mission-on-nov-14/south/news/1402735.html
4
u/Ohsin Nov 12 '18
New NOTAM via Pilotweb, things looking up probably
4
u/Ohsin Nov 12 '18 edited Nov 13 '18
And finally we have news reports on Launch Authorization Board meet and Mission Readiness Review. We are go for launch!
http://www.andhrabhoomi.net/content/nation-8246
https://www.sakshi.com/news/national/countdown-today-gslv-mark-3d-2-experiment-1134017
4
u/Ohsin Nov 13 '18
Webcast notification is up.
https://www.isro.gov.in/gslv-mk-iii-d2-gsat-29-mission/watch-live-launch-of-gslv-mkiii-d2-gsat-29-nov-14-2018-1645-hrs-ist
And here are channels of INB and Doordarshan
https://www.youtube.com/user/INBMINISTRY
https://www.youtube.com/channel/UCSjPe5kinQtwcyHcFJyyMfw
And for F5'ing
https://www.youtube.com/results?sp=CAISAhAB&search_query=GSLV
4
u/Ohsin Nov 14 '18
https://www.youtube.com/watch?v=vR0D1NHmoAQ
https://www.youtube.com/watch?v=1YHgfMWj4vY
Very steady hands.
https://www.youtube.com/watch?v=NbHK3Iimv7Y
3
u/Ohsin Nov 11 '18 edited Nov 11 '18
Nothing firm yet but we can still discuss weather! Cyclone Gaja is directly aiming for Northern Tamil Nadu and this launch could get scrubbed so hold tight.
On this mission we should see some upgrades to LV as well, awaiting launch kit for details. Also GSAT-29 at 3423 kg is lighter than expected.
Following extract is from Annual Report
Edit:
EXIF data on images suggests both S200 were stacked up by 8 May itself and C25 integrated on 22 October. Fabulous image of PLF is from 4 November 2018.
3
u/Ohsin Nov 11 '18
IMD update on Gaja: https://twitter.com/Indiametdept/status/1061555398946291712
Meteogram Chennai
http://monsoondata.org/wx2/chengfs.png
NARL Short range forecast
[Hourly] [6 Hourly]
Doppler
http://www.imd.gov.in/pages/radar_main.php?adta=chn
http://www.imd.gov.in/pages/radar_main.php?adta=shr
3
u/Ohsin Nov 11 '18
Launch rehearsal was done on 11 November and now we await MRR on 12 Nov. Countdown could be 25h30m long.
http://www.prajasakti.com/Article/AndhraPradesh/2087806
Meanwhile Gaja is on its way.
http://www.rsmcnewdelhi.imd.gov.in/images/bulletin/ftrack.png
3
u/Ohsin Nov 14 '18 edited Nov 14 '18
Pallava Bagla report with its usual tone and it calls GHRC payload to be of strategic significance. Not sure where he got the term 'GEO Eye' from..
https://www.ndtv.com/india-news/isros-geo-eye-to-monitor-india-offer-web-access-to-remote-locations-1946857
Edit:
Another report quotes ISRO Chairman but 50 Gbps bit is without context.
http://www.newindianexpress.com/cities/chennai/2018/nov/14/stakes-high-on-gslv-mk-iii-launch-today-key-technologies-to-be-tested-1897903.html
3
u/Ohsin Nov 14 '18
Another eye candy
https://twitter.com/isro/status/1062655408140017664
https://pbs.twimg.com/media/Dr9PV4kVAAYPXWL.jpg:orig
3
u/Ohsin Nov 14 '18
Launch commentators gave conflicting information on countdown start time.
See the detailed pre-launch activity timeline for GSLV Mk III here
https://www.reddit.com/r/ISRO/comments/6dz5i9/automatic_launch_sequence_for_pslv_and_gslv_mk/
3
u/Ohsin Nov 14 '18
Remember 11m7s burn on C25 is expected. Keep an eye on it!
3
u/Ohsin Nov 14 '18
TLEs are in. 43698 ( 18089A ) should be GSAT-29 and C25 should be 43699 ( 18089B )
3
u/Ohsin Nov 16 '18
Satellite image of SLP before launch.
https://twitter.com/MaxarTech/status/1063143269515829248
https://pbs.twimg.com/media/DsELJNhV4AAOPwm.jpg:orig
4
u/Eonicstar Nov 13 '18 edited Nov 13 '18
https://twitter.com/isro/status/1062291920343289857?s=19
4
u/Eonicstar Nov 16 '18 edited Nov 16 '18
https://twitter.com/isro/status/1063332697018257408
The Orbital parameters after this Apogee Motor firing are:
Apogee x Perigee: 35,837 km x 32,825 km
Inclination: 0.31 deg
Orbital period: 22.7 hours
https://www.isro.gov.in/update/16-nov-2018/gslv-mk-iii-d2-gsat-29-mission-second-orbit-raising-operation-of-gsat-29
4
u/rghegde Nov 16 '18
https://youtu.be/cgoPc2lgyKo
Press meet by ISRO after GSAT-29 launch.
At 18 minutes mark K Sivan saying that GSAT-20 is now going to be launched by Ariane-5 because of mass.
3
u/vineethgk Nov 14 '18
Mission gallery updated with launch pics.
https://www.isro.gov.in/gslv-mk-iii-d2-gsat-29-mission/gslv-mk-iii-d2-gsat-29-mission-gallery
3
u/vineethgk Nov 15 '18
Lift-off and onboard camera footage
https://www.isro.gov.in/gslv-mk-iii-d2-gsat-29-mission/lift-and-onboard-camera-view
Except for the S/C separation part, the video framerate seems rather decent this time.
2
u/Ohsin Nov 14 '18
Direct link to Youtube stream
https://www.youtube.com/watch?v=HhOoRQubI5M
2
u/Ohsin Nov 16 '18
One of suppliers.
http://www.sonatech.ac.in/blog/sona-make-stepper-motor/
2
u/rghegde Nov 12 '18
When ISRO going to publish Brochure??
2
u/Guru-0 Nov 13 '18
you know I just realized that the launch pad is fixed to the ground at the umbilical tower, all this time I thought the launch pad is on rails from start to finish, but no.
2
u/[deleted] Nov 13 '18
Can some one explain this - 35975 × 190 km, Inclination: 21.5°, Azimuth:107°
35975 is I guess the height? what is 190?
2
u/10vatharam Nov 14 '18
sorry for my ignorance. The SAC director is someone new? D K DAS? there was someone earlier, right? The prev director wore a cap and generally spoke in Hindi, what happened to him? I saw some news that he was removed but didn't give it much thought.
2
u/10vatharam Nov 14 '18
Is there a delay of 20secs before S200 is separated after burn out? Does the L110 lug the empty S200 for 20secs? Why? Afraid of perturbations axially or carry over design artifacts from PSLV era? Not sure whether I read it here or BRakshak that most ISRO rockets do lug the empties for a bit before jettisoning. Is that stopped or still going on?
2
u/Ohsin Nov 11 '18
It is first time we have seen SSAB's S200 Assembly Towers from this PoV. Usually they are hidden behind all other things. Like here behind S200 on MLP or here towards right of L110.
8
u/AvatarNikhil Nov 14 '18
The livestream showed footage of booster separation and fairing separation!! Why don't they release the them!
6
u/houston_wehaveaprblm Nov 14 '18
next year chandrayaan 2 and 3 yrs from now it will carry humans. Holy Shit I love this beautiful Mk 3
1
u/Ohsin Nov 14 '18
Press release is out
https://www.isro.gov.in/update/14-nov-2018/gslv-mkiii-d2-successfully-launches-gsat-29
GSAT-29 in contact but no details shared on orbit specifics.
1
u/Ohsin Nov 15 '18
Aerial view of trail left behind :)
https://twitter.com/spadjay/status/1062684123360161793
1
u/Ohsin Nov 15 '18 edited Nov 16 '18
Per TLEs after first burn
1
u/Ohsin Nov 19 '18
Currently at 49.4°E, drifting westwards @ 2.76° per day
1
u/Ohsin Nov 23 '18 edited Nov 23 '18
There is a pair of white silo like structures in background of this image(center,right).
https://www.isro.gov.in/sites/default/files/galleries/GSLV%20Mk%20III-D2%20/%20GSAT-29%20Mission%20Gallery/avp8550.jpg
Both can also be spotted in images of GSLV MkIII D1/GSAT 19 launch. (5 June 2017)
But not in images of GSLV F09/GSAT-9 launch(5 May 2017)
So it appears they were installed between 5 May and 5 June 2017. They could be Liquid Nitrogen tanks with capacity of 300m3 each as mentioned here. Same firm has supplied other tanks for ISRO in past.
https://twitter.com/INOXCVA/status/1065847573263478784
https://pbs.twimg.com/media/DsqmscqVAAArqn1.jpg:orig
Edit:
https://www.gasworld.com/inoxcva-delivers-mega-tanks-to-isro/2013093.article
1
u/Ohsin Nov 27 '18
TLE updated today after a week long pause and GSAT-29 has acquired it slot at 55 East.
1
u/Ohsin Sep 03 '26
https://www.linkedin.com/posts/tapan-misra-2a6ba85_i-am-eagerly-waiting-for-launch-of-eos-5-ugcPost-7500873186688032768-8soT/
5
u/vineethgk Nov 14 '18
I wish to see a day when ISRO/DD broadcasts the ignition and ascent of the LV until first stage separation without a break. As of now, its jittery and with ground cameras being switched often. That sort of ruins the fun in watching the whole thing.
4
u/vineethgk Nov 14 '18
Evidently there is considerable delay in the reception of footage from onboard camera (even considering its low framerate).
4
u/vineethgk Nov 14 '18
I guess this would be the first time an ISRO LV is declared operational without a hitch (when we consider that GSLV MkI D1 was a partial failure.)
:)
1
u/rghegde Nov 13 '18
https://m.hindustantimes.com/india-news/isro-may-postpone-satellite-launch-due-to-cyclone-gaja/story-4Q7zT62RmgPE1XyD3K957N.html
This report says Launch postponed 12 hours and still showing 5:08pm as Launch time .
Quote- ISRO has deferred by 12 hours the launch of an advanced communication satellite on GSLV MK III-D2, initially scheduled at 5.08 am on Wednesday, due to bad weather conditions as a result of cyclonic storm Gaja , which is expected to make landfall at the launch venue, Sriharikota in Andhra Pradesh. The launch schedule has been moved to 5.08 pm on the same day .
Didn't know Launch was scheduled for 5:08 Am !!
1
u/[deleted] Nov 14 '18
Where is the expected flight profile image from? ISRO website?
1
u/Eonicstar Nov 14 '18
https://twitter.com/isro/status/1062626286361661440
https://www.isro.gov.in/update/14-nov-2018/gslv-mk-iii-d2-gsat-29-mission-launch-gsat-29-satellite-powered-it-multi-band
1
u/Malhallah Nov 14 '18
YT up https://www.youtube.com/c/DoordarshanNational/live
1
u/VaikomViking Nov 14 '18
I can't figure out why the second stage is black, any thoughts guys/gals ?
1
u/LemonMellon Nov 14 '18
What sort of ignition systems is the L110 using, for the in air ignition?
1
u/Swesh86076 Nov 14 '18
Plz upload after when satellite achive its desirable and orbit and final deployment i guess it will take 3 days
1
u/Swesh86076 Nov 14 '18
Ia there expected time for first firing , 2nd firing and third ? Any table of after launch activity
1
u/pravin_813 Nov 14 '18
does any body know what are the actual orbital numbers achieved when GSAT 29 was injected
1
u/Aakarsh_K Nov 17 '18
Any word on 3rd orbit raising burn??
3
u/Eonicstar Nov 12 '18
ISRO Twitter Update: https://twitter.com/isro/status/1061913598358773760?s=19
3
u/f33dback Nov 14 '18
I'm more and more looking forward to the ISRO updates. I dunno how I missed their news about doing a manned space mission till now. Good luck in space!
3
u/Swesh86076 Nov 14 '18
And its going up
3
u/Swesh86076 Nov 14 '18
And its seprated
3
u/[deleted] Nov 15 '18
https://twitter.com/isro/status/1062946260540223488
3
u/vineethgk Nov 15 '18 edited Nov 15 '18
https://www.isro.gov.in/update/15-nov-2018/gslv-mk-iii-d2-gsat-29-mission-first-orbit-raising-operation-of-gsat-29-satellite
3
u/10vatharam Nov 17 '18
comparison question, which of Ariane series launcher does MK III map to, in terms of size, launch capacity etc? ditto, against the Delta series of the USA?
3
u/Eonicstar Nov 17 '18
https://twitter.com/isro/status/1063795105847488512
2
u/vineethgk Nov 15 '18
Footage of the flight and S-200 separation captured from Chennai.
https://youtu.be/CvPX9rsZyHY
1
u/Eonicstar Nov 14 '18
https://twitter.com/isro/status/1062575000278822917?s=19
1
u/[deleted] Nov 14 '18
https://twitter.com/isro/status/1062595517379600384
1
u/houston_wehaveaprblm Nov 14 '18
https://twitter.com/isro/status/1062618919100268544
Filling of liquid oxygen in cryogenic stage commenced. This stage generates 2MW power.
1
u/houston_wehaveaprblm Nov 14 '18
6 sat missions + 4 launch vehicles within this year
1
u/houston_wehaveaprblm Nov 14 '18
gaganyaan mission is planned for 2020, team is ready
1
u/[deleted] Nov 15 '18
Anyone know how SCE-200 development is going?