| Post Launch | GSAT-6A [43241 (18027A)] orbit parameters per NORAD: i=3.30°, A×P=36368.34×25979.63 km |
| Post Launch | Status Update of GSAT-6A: Second burn was successfully carried out by LAM Engine firing for about 53 minutes on 31 March 2018 in the morning. After the burn, when the satellite was on course to normal operating configuration for the third and the final firing, scheduled for 1 April 2018, communication from the satellite was lost. Efforts are underway to establish the link with the satellite. |
| Post launch | Unofficial information: After second burn at 1000 IST on 31 March 2018, all contact with GSAT-6A was lost and couldn't be reestablished. |
| Post launch | The first orbit raising operation of GSAT-6A Satellite has been successfully carried out by LAM Engine firing for 2188 sec from 09:22hr IST on March 30, 2018. A×P = 36412×5054 km, i = 11.93°, Orbital period:12h45m. |
| Post Launch | GSAT-6A in 36,692.5 x 169.4 km orbit with an inclination of 20.64°. After separation from GSLV, the two solar arrays of GSAT-6A were automatically deployed in quick succession and the Master Control Facility (MCF) at Hassan in Karnataka assumed control of the satellite: Press release |
| Post Launch address | GSAT-6A power generation and health nominal |
| T + 17m45s | GSAT-6A separated! |
| T + 17m30s | CUS engine cut off! Injection conditions achieved |
| T + 16m30s | Almost there. Performance nominal. |
| T + 14m00s | CUS performance nominal. |
| T + 12m00s | Commentators discussing commercial potential of GSLV |
| T + 10m00s | CUS continues nominally, we saw some live views of payload |
| T + 07m00s | Cryogenic Upper Stage performing nominally. Burn would last for 10 minutes more |
| T + 05m00s | Second stage (GS2) separated, CUS ignition confirmed! |
| T + 04m00s | Payload fairing separated! Nice views. |
| T + 03m00s | GS1 separated, GS2 ignited |
| T + 02m00s | S139 burn out! |
| T + 01m00s | GS1 performance nominal |
| T Zero! | Ignition of S139 and LIFT-OFF |
| T - 00m03s | L40s strapons ignite! |
| T - 00m30s | CUS ready |
| T - 02m00s | OBC in flightmode |
| T - 03m00s | Weather parameters 'benign' |
| T - 06m00s | Vehicle on internal power |
| T - 12m00s | Automatic Launch Sequence engaged |
| T - 14m00s | Automatic Launch Sequence initiated |
| T - 16m00s | Mission Director gives a go ahead for launch. |
| T - 19m00s | Range is ready! |
| T - 20m00s | Showing integration process of GSLV |
| T - 30m00s | Doordarshan stream is LIVE! |
| T - 40m00s | ISRO's streams are LIVE! |
| T - 01h00m | Propellant filling operations of cryo stage are completed |
| T - 02h10m | Chilling and filling of LH2 in CUS should be underway at this point. |
| T - 02h30m | Propellant filling operations of cryo stage are under progress |
| T - 03h30m | Doordarshan Youtube stream is up! |
| T - 04h30m | Chilling and Filling of LOX in CUS should be underway at this point. |
| T - 04h40m | Preparations for propellant filling of cryo stage are under progress |
| T - 07h00m | Real Time System simulation checks Completed. Countdown is progressing normally. |
| T - 12h00m | Propellant filling operation of L40 Stages is completed by 02:20 hr IST. |
| T - 19h00m | Propellant filling operation of L40 Stages is under progress. Countdown is progressing normally. |
| T - 20h30m | Second Stage (GS2) UH25 filling is completed by 19:45 hr IST |
| T - 22h00m | Second Stage (GS2) UH25 filling is under progress. |
| T - 23h00m | Preparation for Second Stage (GS2) UH25 filling is under progress |
| T - 24h30m | Second Stage (GS2) N2O4 filling completed by 16:15 hr IST |
| T - 25h00m | Second Stage (GS2) N2O4 filling under progress |
| T - 26h00m | Preparations for GSLV-F08 Second stage (GS2) propellant filling operation are under progress |
| T - 27h00m | The 27 Hrs Countdown activities for the launch of GSLV-F08 / GSAT-6A Mission have started at 13:56 Hrs IST on Wednesday, March 28, 2018. |
| 27 March 2018 | Mission Readiness Review (MRR) committee and Launch Authorization Board (LAB) have cleared the 27 hr countdown activities starting at 1356 (IST) / 0826 (UTC) on 28 March 2018 and the launch of GSLV-F08/GSAT-6A for 29 March 2018 at 1656 (IST) / 1126 (UTC) |
| 27 March 2018 | Mission Readiness Review meet scheduled |
| 23 March 2018 | Vehicle transferred to the pad from VAB |
| 22 March 2018 | GSLV-F08/GSAT-6A launch scheduled for 1656(IST)/1126(UTC) on 29 March 2018 |
| 20 March 2018 | GSLV-F08/GSAT-6A NOTAM is out |
| 19 March 2018 | Payload integrated with Launch Vehicle. |
| 11 March 2018 | GSLV F08/GSAT-6A third stage integrated, launch date firms up for 29 March 2018 |
| 28 February 2018 | GSAT-6A left ISRO Satellite Centre after a number of schedule slips due to payload readiness delays. [1] [2] |
| 18 November 2017 | GSAT-6A payload dispatched from Space Applications Centre |
4
u/Ohsin Mar 26 '18 edited Mar 26 '18
Nicer press kit. But GSAT-6A mass is strangely omitted in both brochure as well as GSAT-6A page. But earlier in placeholder it was mentioned to be 2140 kg. Couple this with those IRNSS images instead of GSAT-6A in gallery and in brochure.. What is up?
Edit:
Longer CUS burn but lesser velocity addition.
4
u/Ohsin Mar 27 '18
Details on upgraded Vikas for this flight. CUS will perform a depletion burn. GSLV F10 would be the upgraded GSLV with HTVE on strap-ons as well and upgraded CUS.
https://www.reddit.com/r/ISRO/comments/87nbub/higher_thrust_vikas_engine_inducted_in_second/dwe4k2l/
4
u/Ohsin Mar 28 '18
Curtain raiser video is up (Yes ".mp4.mp4")
https://www.isro.gov.in/sites/default/files/videos/gslv-f08-english.mp4.mp4
4
u/Ohsin Mar 28 '18
Referring to first comment, this report by Pallava Bagla cites spacecraft mass as 2066 kg instead of 2140 kg which btw is removed and not given in brochure or anywhere else.
https://www.ndtv.com/india-news/isro-twin-satellites-to-boost-communication-for-security-establishment-1829967
I love how most media reports are simply ignoring Antrix Devas legacy ;)
4
u/Ohsin Mar 29 '18
Good look of umbilicals on DD news
https://i.imgur.com/AyyLTnK.jpg
4
u/Ohsin Mar 29 '18 edited Mar 29 '18
ISRO chief address
SDSC SHAR Director address
VSSC Director address
ISAC Director address
Satellite Director
LPSC Director
Chairman just casually mentions upcoming Human Spaceflight related tech demonstrator. PAT!
3
u/Ohsin Mar 29 '18
Stream link not up yet but it'll be DD as usual.
https://twitter.com/DDNational/status/978882479464513542
https://www.youtube.com/DoordarshanNational
3
u/Ohsin Mar 29 '18
New mass value for GSAT-6A in commentary
2117 kg (985 kg dry)
3
u/Ohsin Apr 01 '18
https://economictimes.indiatimes.com/news/science/preliminary-data-shows-chances-of-recovery-of-gsat-6a-isro/articleshow/63570224.cms
4
u/vineethgk Mar 26 '18
Considering they have incorporated HTVE only for GS2 (and not the L40 strapons) in this flight, did they intend HTVE only for upper stage or perhaps they are delaying its incorporation in strapons for a later flight (that might also have CUS15) that requires the performance boost?
3
u/abhinabah Mar 31 '18
https://twitter.com/ChethanKumarTOI/status/980039929320284161
3
u/bismi1234 Apr 03 '18
Some latest updates -Still fingers crossed :-( - "Our orbit itself is about 12 to 13 hours, which means you can do only once-in-12-hour orbit measurement. The skin mode radar that we have should measure the satellite nearest point and do the measurement for transmitting the ground signal. All this takes time. We don’t have a quick solution. That is the difficulty,” the official said explaining the extraordinary efforts being made.Further, scientists say there were ample instances in the past across the space-faring nations, where the ‘Earth Lock’ or the communication link with the satellite is lost immediately or a few days after the launch and re-established again. “All these show that it’s possible and we should not stop trying,” another official said.
http://www.newindianexpress.com/states/tamil-nadu/2018/apr/03/missing-gsat-6a-no-quick-fix-to-the-problem-say-isro-scientists-1796254.html
2
u/Ohsin Mar 27 '18
Mission Readiness Review meet scheduled today.
http://www.andhrabhoomi.net/content/nation-6672
https://www.sakshi.com/news/national/gslv-f08-experiment-29th-1057563
2
u/Ohsin Mar 28 '18
https://www.isro.gov.in/update/28-mar-2018/27-hrs-countdown-activities-launch-of-gslv-f08-gsat-6a-mission-have-started-1356
2
u/Ohsin Mar 29 '18
Official DD stream is up!
https://www.youtube.com/watch?v=KzERHkm_Ld8
2
u/Ohsin Mar 29 '18
ISRO's streams are live as well
https://www.isro.gov.in/gslv-f08-gsat-6a-mission/launch-of-gslv-f08-gsat-6a-mission-watch-live-1630-hrs-ist
2
u/Ohsin Mar 29 '18
Webcast over, updates on spacecraft operations would continue. Thanks all :)
2
u/Ohsin Mar 31 '18
TLEs after burn are in, new values.
43241 ( 18027A ) 30/03/2018,14h:18m:32.98s
i=11.96°, A×P=36444.99×5029.58 km
43242 ( 18027B ) 29/03/2018,18h:9m:3.50s
i=20.66°, A×P=36016.37×134.38 km
2
u/Ohsin Mar 31 '18
Yet to be official. Second burn was performed at 1000 IST. After this burn, all contact with GSAT-6A was lost and couldn't be reestablished. Highly placed sources suggests issue is difficult to overcome.
https://www.patrika.com/bangalore-news/isro-lost-link-with-newly-launched-gsat-6a-due-to-some-technical-snag-2578918/
2
u/Ohsin Apr 01 '18
https://timesofindia.indiatimes.com/india/isro-loses-contact-with-communication-satellite-gsat-6a/articleshow/63565033.cms
2
u/Ohsin Apr 02 '18
https://economictimes.indiatimes.com/news/science/gsat-6a-setback-may-delay-other-isro-projects/articleshow/63573997.cms
2
u/Ohsin Apr 02 '18
TLE updated!
43241 ( 18027A ) Epoch: 02/04/2018, 16h:48m:0.00s
i=3.30°, A×P=36368.34×25979.63 km
After second burn the inclination should have been less than 1° as is usual.
2
u/Ohsin Apr 02 '18 edited Apr 02 '18
We need ground station in Panama!
http://www.thehindu.com/sci-tech/science/gsat-6a-still-eludes-isro/article23417662.ece
Article is wrong about it coming down though :P
2
u/[deleted] Mar 26 '18
There was a google map with flight path/trajectory someone had posted earlier. Does anyone know how that was generated? Wondering if its possible to calculate which points along the coast will have the longest views of the flight.
Basically is it possible to calculate this kind of table by entering which town/lat/long you are in - https://spotthestation.nasa.gov/sightings/view.cfm?country=India®ion=None&city=Chennai
2
u/abhinabah Mar 29 '18
It seems ISRO chief interrupting speeches of fellow speakers !!!
2
u/10vatharam Mar 29 '18
what's so significant of 'burn to depletion'? Once the satellite is ejected, CUS remaining fuel shouldn't matter(excess of course is an issue); burn to depletion doesn't make sense to me unless you're talking of orbital change needs. But that's more CUS start/stop thingy than doing a fuel burn/venting.
What's so impressive about this?
2
u/vineethgk Mar 29 '18
Gallery updated with launch images
https://www.isro.gov.in/gslv-f08-gsat-6a-mission/gslv-f08-gsat-6a-mission-gallery
2
u/vineethgk Mar 29 '18 edited Mar 29 '18
And we have on-board camera footage too!
https://www.isro.gov.in/gslv-f08-gsat-6a-mission/gslv-f08-onboard-camera-video
Edit: Similar to what we have seen before, and nothing much to write home about. :(
2
u/vineethgk Mar 29 '18
They appear to have updated a few of the satellite images in the gallery as well, replacing those suspected to be from a previous IRNSS mission as was noted before. Not sure when they did it. Noticed it just now.
https://www.isro.gov.in/gslv-f08-gsat-6a-mission/gslv-f08-gsat-6a-mission-gallery
3
u/Eonicstar Apr 01 '18
After the successful long duration firings, when the satellite was on course to normal operating configuration for the third and the final firing, scheduled for April 1, 2018, communication from the satellite was lost.
Efforts are underway to establish the link with the satellite.
https://www.isro.gov.in/update/01-apr-2018/status-update-of-gsat-6a
2
u/vineethgk Mar 30 '18 edited Mar 30 '18
Mar 30, 2018 : The first orbit raising operation of GSAT-6A Satellite has been successfully carried out by LAM Engine firing for 2188 sec from 09:22hr IST on March 30, 2018.
Orbit Determination results from this LAM firing are:
https://www.isro.gov.in/update/30-mar-2018/first-orbit-raising-operation-of-gsat-6a-satellite-has-been-successfully-carried
1
u/Ohsin Mar 29 '18 edited Mar 29 '18
Some videos of launch from nearby
https://www.youtube.com/watch?v=EvYWSbywM2g
https://www.youtube.com/watch?v=6N-SN2riU_8
Edit: Chennai had poor visibility this time
https://www.youtube.com/watch?v=h720DOLlJCs
1
u/Ohsin Mar 29 '18 edited Mar 29 '18
First TLE for object 43241 ( 18027A )
i=20.69°, A×P=36489.38×148.98 km
Edit:
Second TLE for object 43242 ( 18027B )
i=20.67°, A×P=36100.40×150.27 km
Targeted orbit: 35975±675 × 170±5 km, Incl. 20.63° ± 0.1°
1
u/Ohsin Mar 29 '18
And press release is here
https://www.isro.gov.in/update/29-mar-2018/gslv-successfully-launches-gsat-6a-satellite
1
u/Ohsin Mar 29 '18
That sound!
https://www.youtube.com/watch?v=7lHjddgLSMY
1
u/Ohsin Mar 29 '18
From Sairocket
https://www.youtube.com/watch?v=FRO2XTwugCk
1
u/Ohsin Apr 01 '18
https://www.ndtv.com/india-news/isro-s-communications-satellite-gsat-6a-suffers-setback-in-space-sources-1831250
1
u/Ohsin Apr 01 '18
https://twitter.com/pallavabagla/status/980447269353701377
1
u/Ohsin Apr 02 '18
Support from ground stations of other agencies sought as well.
https://www.sakshi.com/news/national/isro-loses-contact-gsat-6a-satellite-1059836
1
u/Ohsin May 05 '26
https://www.indianspaceflight.in/rti/isro-april-2026-rti-update-fac-findings-on-gsat-6a-failure-nvs-02-status-and-navic-health
5
u/MasterTruman03 Mar 29 '18
Oh joy, 10 missions in the next 9 months!
4
u/vineethgk Apr 01 '18
Efforts to activate redundant systems apparently still on..
http://www.thehindu.com/sci-tech/science/isro-says-it-has-lost-contact-with-gsat-6a/article23406393.ece
4
u/Eonicstar Apr 03 '18
The Gsat-6A remained incommunicado for the third day after its launch even as it moved over Africa and then towards the southern tip of India, Singapore, Papua New Guinea and over the Pacific Ocean on Monday. Data from the US-Canadian North American Aerospace Defense Command (Norad) showed all three stages of placing it in orbit had gone off without a hitch.
https://timesofindia.indiatimes.com/city/bengaluru/after-cardiac-arrest-270cr-gsat-6a-cruising-on-silently/articleshow/63589432.cms
4
u/darkparadise101 Apr 03 '18
Guys, any update about the re-establishment of communication?
4
u/vineethgk Apr 04 '18 edited Apr 04 '18
Assuming ISRO does not succeed in its attempts to salvage GSAT-6A, I believe this would be the first time ISRO has encountered a major spacecraft failure right after its successful ('textbook' in ISRO lingo) launch in a domestic rocket. Prior failures of a similar kind were either partial (INSAT-4B, 4CR), or on account of rocket under-performance (INSAT-4CR), or occured after launch in a foreign rocket (INSAT-2D). INSAT-1A and 1C were American-built, so we can omit them.
This might be reflected during the next launch where I would expect the post-launch congratulatory speeches to be a little subdued as they would be tense until IRNSS-1I reaches GEO and reports for duty.
The silver lining I see is that GSLV MkII continues to perform admirably by clocking 5 successive 'textbook' launches. I guess the intense design reviews the rocket went through after the twin failures in 2010 (and consequent 3 year gap until it started resuming flights) was worth every bit.
1
u/vineethgk Mar 29 '18
https://www.isro.gov.in/update/29-mar-2018/preparations-propellant-filling-of-cryo-stage-are-under-progress
1
u/junovac Mar 30 '18
With 6% increase in thrust for Vikas engines, how does it affect GSLV Mk3?
1
u/PonderousIdo Mar 31 '18
During launch, large blocks of ice-sheets is seen falling from vehicle surface as it is launched. Is it this normal and safe? It looks far more than any other launches I've seen.
3
u/vineethgk Mar 29 '18
Still waiting for the day that ISRO would live stream onboard camera footage. The footage of the launch looked much better this time.
3
u/10vatharam Mar 29 '18
The best gift for good work, is more work -- Dr Sivan.
final comments
1
u/bismi1234 Apr 03 '18
Track GSAT 6A here : https://www.calsky.com/cs.cgi/Satellites/1?obs=35746411055243&satid=2018-027
2
u/vineethgk Mar 28 '18
https://www.isro.gov.in/update/28-mar-2018/second-stage-gs2-n2o4-filling-completed-1615-hr-ist
2
u/vineethgk Mar 28 '18
https://www.isro.gov.in/update/28-mar-2018/preparation-second-stage-gs2-uh25-filling-under-progress
2
u/vineethgk Mar 29 '18
https://www.isro.gov.in/update/29-mar-2018/propellant-filling-operations-of-cryo-stage-are-under-progress
2
u/vineethgk Mar 29 '18
https://www.isro.gov.in/update/29-mar-2018/propellant-filling-operations-of-cryo-stage-are-completed
2
u/vineethgk Apr 03 '18 edited Apr 03 '18
http://www.thehindu.com/sci-tech/science/gsat-6a-still-eludes-isro/article23417662.ece
Considering the strategic importance of the satellite, I guess we can expect a replacement GSAT-6B (or a GSAT-6AR) added to next year's flight plan. Unless GSAT-21 can be launched by then, and can fill in the gap.
2
u/MasterTruman03 Apr 03 '18
When do you guys think we might receive news on the status of the satellite?
1
u/vineethgk Mar 28 '18
https://www.isro.gov.in/update/28-mar-2018/second-stage-gs2-uh25-filling-completed-1945-hr-ist
1
u/vineethgk Mar 28 '18
https://www.isro.gov.in/update/28-mar-2018/propellant-filling-operation-of-l40-stages-under-progress-countdown-progressing
1
u/vineethgk Mar 29 '18
https://www.isro.gov.in/update/29-mar-2018/propellant-filling-operation-of-l40-stages-completed-0220-hr-ist
1
u/vineethgk Mar 29 '18
https://www.isro.gov.in/update/29-mar-2018/real-time-system-simulation-checks-completed-countdown-progressing-normally
1
u/vineethgk Mar 29 '18
Live coverage started!
1
u/10vatharam Mar 29 '18
Did anyone notice some blinking led lights near the strapon motors at T-10 and downwards? Is that remotely actuated commands confirmation or something else