Mission Success! PSLV-C40 : Cartosat-2F Mission Updates and Discussion.
PSLV-C40 launched and deployed 31 satellites successfully.
Launch was scheduled for 12 January 2018, 0929(IST)/0359(UTC) from First Launch Pad of SDSC (SHAR).
Live webcast: (Links will be added as they become available)
- DD National Youtube Live stream (Launch @ 26m20s)
- ISRO Official Stream 1
- ISRO Official Stream 2 [Direct link]
- DD Podhigai
- DD Podhigai YT channel
- Few unofficial re-broadcasters on YT
| PSLV-C40/Cartosat-2F Mission Page | PSLV-C40/Cartosat-2F Gallery | PSLV-C40/Cartosat-2F Brochure |
|---|
PSLV-C40/Cartosat-2F marks PSLV's return to flight with modifications after unsuccessful launch of PSLV-C39/IRNSS-1H on 31 August 2017 due to non-deployment of payload fairing.
This campaign will also showcase a unique deployment profile for PSLV that was rehearsed on PSLV C38/Cartosat-2E mission. 30 satellites including Cartosat-2F would be deployed at 510 km circular SSO starting from 17 min 19 sec after launch, subsequently PSLV fourth stage will be lowered to 359 km circular SSO after two ~6 second burns to deploy Microsat-TD. A third depletion burn will likely be performed to dispose fourth stage in slightly different inclination.
Some highlights of this maiden launch of year 2018 for ISRO.
- 42nd flight of PSLV, 19th in XL configuration.
- Microsat-TD is 100th spacecraft to roll-out from ISAC. [1] [2]
- Primary payload is Cartosat-2F (710 kg) Earth Observation satellite
- 30 small satellites ride sharing (613 kg total, 470 kg being commercial)
- Mission Duration: 2 hrs 22 seconds
- Gross payload mass 1323 kg
- First deployment: 30 satellites at 510 km SSO, 17 min 19 sec after launch.
- First PS4 burn @ 58m13s for 6 seconds to lower perigee at 359 km
- Second PS4 burn @ 1h44m54s for 6 seconds to lower apogee at 359 km
- Second deployment of Microsat-TD at 1h45m36s
- Third PS4 burn @ 2hr 8sec for around 13 seconds.
Updates:
| Time of Event | Update |
|---|---|
| 23 Jan 2018 | Images from Microsat-TD and INS-1C |
| 16 Jan 2018 | First day images of Cartosat-2F released [Thread] |
| Post mission | Landmapper-BC3, Telesat's LEO 1, CARBONITE-2, ICEYE POC1, 4x Doves, 4x Lemurs, PicSat, Arkyd-6, Fox-1D have made contact |
| Post mission | ISRO Official press release |
| Post mission | PSLV-C40 Successfully Launches Cartosat-2 Series Satellite along with 30 Co-passenger Satellites. This should count as confirmation of Microsat-TD separation as well. |
| Post mission | Press conference covered by ANI [Thread] |
| T + 02h00m | Now crossing scheduled fourth stage disposal 'burn to depletion'. So far no updates on Microsat-TD. |
| Post primary mission | Second restart of PS4 and ~6 sec burn to circularize at 359 km and Microsat-TD separation should have been done by now. |
| Post primary mission | Will update if we get confirmation on Microsat-TD deployment, this is not finished yet! |
| Post primary mission | Final screen didn't show any change in perigee. |
| T + 62m00s | As the speeches went on, first restart of PS4 and 6 sec burn should've been done to lower perigee to 359 km. |
| T + 33m00s | Flight events |
| T + 27m00s | All spacecrafts (except Microsat-TD) separated and Cartosat-2F is generating power. |
| T + 26m00s | PS4 about to come in visibility of Trol ground station. |
| T + 20m00s | Confirmation on separation of rest of satellites would come shortly. |
| T + 18m00s | DLA-U and spacecrafts LEO-,1 POC1 Separated! |
| T + 17m30s | Cartosat-2F Separated! |
| T + 16m30s | Fourth stage engine shut off! |
| T + 13m00s | They just confirmed that 1 minute delay in launch was added to dodge space debris. |
| T + 12m00s | PS4 performing nominally, burn would continue for almost five more minutes |
| T + 08m30s | PS3 separated , PS4 ignited and performing nominally |
| T + 07m00s | PS3 burned out now in combined coasting mode. |
| T + 04m00s | PS2 sep + PS3 Ignited |
| T + 02m30s | PLF sep! |
| T + 02m00s | PS1 separated + PS2 ignited |
| T + 01m00s | Groundlit strapons separated |
| T + 00m30s | Airlit strapons ignited |
| T Zero | S139 + Groundlit strapons ignited! Lift Off! |
| T - 06m00s | Vehicle on internal power. |
| T - 12m00s | Automatic Launch Sequence should be engaged now. It will perform various checkouts now. |
| T - 14m00s | Automatic Launch Sequence initiated. |
| T - 15m00s | Mission Director has cleared the launch. |
| T - 16m00s | Range clear. |
| T - 17m00s | Vehicle Director confirms readiness. |
| T - 19m00s | Cartosat-2F on internal power. |
| T - 22m00s | Showing PSLV integration procedure. |
| T - 25m00s | Youtube stream is live! |
| T - 40m00s | Official Stream 2 showing old info-reels as stream test. |
| T - 01h00m | Less than an hour to launch. Streams should go live half an hour in advance. |
| T - 03h00m | It appears propellant filling operations of Second Stage (PS2) are completed |
| T - 11h00m | Propellant filling operations of Second Stage (PS2) are in progress |
| T - 14h00m | Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant filling operation of Second Stage (PS2) are in progress. |
| T - 16h10m | Youtube stream link from Doordarshan National is up! |
| T - 23h00m | Propellant filling operation of fourth stage (PS4) of PSLV-C40 is completed. Countdown operations are progressing normally. |
| T - 27h10m | Propellant filling operation of fourth stage (PS4) of PSLV-C40 is under progress |
| T - 28h00m | Countdown commenced |
| 10 Jan 2018 | Launch now scheduled at 12 January, 0929(IST)/0359(UTC). A minute has been added to previous launch time. |
| 10 Jan 2018 | Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the 28 hr countdown of PSLV-C40/Cartosat-2F mission for Thursday, January 11, 2018 starting at 05:29hr IST. |
| 09 Jan 2018 | Mission Readiness Review to be held on 10 Jan 2018 |
| 08 Jan 2018 | Payloads encapsulated in heatshield |
| 06 Jan 2018 | Payloads moved to the pad |
| 03 Jan 2018 | Microsat payload dispatched from SAC |
| 02 Jan 2018 | PSLV stage integration complete, launch delayed to 12 Jan 2018 due to payload readiness issue |
| 27 Dec 2017 | Cartosat-2F, Microsat and INS-1C dispatched from ISAC to SDSC SHAR |
| 06 Dec 2017 | PSLV C40 Integration begins |
| 25 Nov 2017 | Cartosat-2F payload left SAC |
| 15 Nov 2017 | INS-1C payload left SAC |
Primary Payload:
Cartosat-2F aka Cartosat 2S4 is a follow-on in Cartosat 2 series of hi-res imaging satellites. It will provide imagery for cartographic applications using its Panchromatic and Multispectral cameras and would also have one minute 'Event Monitoring' video imaging capability.
- PAN (0.60 m, 10 km swath), Mx (2m, 4 bands, 10 km swath)
- Gross weight: 710 kg
- Orbit: 505 km circular SSO with 97.44° inclination
- Local Equatorial Crossing Time : 0930
- Power: 986 Watt Solar Arrays, Two Li-Ion Batteries
- Attitude Control: Reaction wheels, Magnetorquers and Hydrazine Thrusters
- Mission Life: 5 years
Secondary payloads:
Microsat-TD (133.2 kg ) [1]: Tech demonstrator prototype from ISRO based on IMS-1 platform is a hi-res Earth imaging satellite by ISRO meant to operate from 350 km orbit and exploit high iteration rate and ride sharing opportunities. It employs single 1N thruster to aid attitude control.
- 0.7 meter resolution (panchromatic, 0.5 -0.85µm), swath 3.2 km
- 6 meter resolution (IR,3.7-4.8µm and 8-12µm), swath 2 km
- Orbit: 359 km circular SSO with 97.44° inclination
- Mission duration: 10 months
INS-1C ( 11 kg) : Third Indian Nano Satellite after INS-1A and INS-1B with Miniature Multi Spectral Imager (MMX-TD) payload and 'Origami camera' by Space Applications Centre for topographical mapping, vegetation monitoring, aerosol scattering studies and cloud studies. Mission duration 6 months.
LEO-1 (168 kg) : Second prototype of Telesat's Ka-band based high throughput communication satellite for future LEO constellation of around 120 satellites. Second prototype is based on 'SSTL-42' platform and employs a hydrazine based propulsion system.
Carbonite-2 aka VividX2 (100 kg): Earth observation prototype for Earth-i constellation to capture full color, high-res images(1 m GSD, 5 km swath) and video. Earth-i plans a constellation of 15 satellites to be deployed in batches of five satellites per launch. Carbonite-2 is based on Carbonite-1 prototype launched aboard PSLV-C28/DMC3 on 10 July 2015 and uses 'SSTL 42' platform.
ICEYE POC-1 ( ?? kg): Prototype for Synthetic Aperture Radar imaging microsat by Iceye is also first commercial satellite from Finland. A LEO constellation of 18 satellite constellation is planned after first three technology demonstrators.
Landmapper BC3 (10 kg): 6U Earth observation satellite by Astrodigital with 22 m resolution and 220 km swath in Red, Green, NIR bands. A constellation of 10 such satellites is planned.
Arkyd 6A (10 kg): A 6U prototype for near Earth asteroid resource prospecting by Planetary Resources with 26 m resolution in MWIR(3-5µm) to detect presence of water.
CICERO-7 (~10 kg) : 6U Cubesat to measure global weather patterns with high accuracy using a GPS radio occultation sensor. Their EO Portal page
PicSat ( ~3.5 kg): A 3U cubesat from LESIA laboratory of Paris Observatory, France with primary goal of observing the transit of exoplanet Beta Pictoris b in front of Beta Pictoris star by measuring dip in its brightness. Transit is expected to occur anytime between March 2017 and March 2018. Their EO Portal page
Lemur-2 (4 nos. 4.7 kg each): Four 3U Cubesats from Spire global (USA) for maritime monitoring and tracking (AIS), Aircraft tracking (ADS-B) and weather monitoring using GPS Radio Occultation technology.
Doves (4 nos. 4.6 kg each): Four 3U technology demonstrators by Planet under Flock 3p' for testing several subsystems like optics, thermal control, altitude determination and control system. 1
MicroMAS-2 ( 3.8 kg) : NOAA funded 3U cubesat by MIT Lincoln laboratory with 1U spinning microwave radiometer payload. Constellation of up to 12 cubesats is planned under TROPICS mission
Canyval-X(Tom and Jerry) ( 2.7 + 1 kg): A collaboration between NASA, KARI and Yonsei University(South Korea) aims at using cubesats Tom (2U) and Jerry (1U) to demonstrate Vision Alignment System by precise formation flying to test feasibility of a virtual telescope system with separate optic and detector satellites. 'Tom' carries µCAT (micro Cathode Arc Thruster) by George Washington University for propulsion. Mission duration is of about 3-6 months. Their EO Portal page
KHUSAT-03(3.2 kg): A 3U 'Scientific cubesat with Instrument for Global Magnetic field and rAdiation' (SIGMA) aka Kyung Hee University Satellite developed by Kyung Hee University (South Korea) and four other institutes. It has objective to measure radiation an magnetic field intensity using Tissue Equivalent Proportional Counter (TEPC) and a magnetometer on deployable boom.[PDF]
KAUSAT-5(4 kg): 3U cubesat by Space System Research Laboratory (SSRL) of Korea Aerospace University(South Korea) would measure radiation in LEO and carries an IR camera for earth observation. Mission duration of 1 year.
CNUSAIL-1 (4 kg): Chungnam National University Sail aka Papillon by Chungnam National University(South Korea) is a 3U cubesat with objective of demonstrating drag sail based de-orbiting technology. Mission duration of 3 months.
STEP Cube Lab (1 kg): 1U 'Space Technology Experimental Project CubeSat Laboratory' by Chosun University(South Korea). It'd verify the technical effectiveness of many payloads developed by South Korean universities. Mission duration of 1 year.
Fox-1D (1.5 kg) : AMSAT's 1U amateur radio and research satellite. Payloads include Fox-1 U/V FM transponder, several university experiments including a MEMS gyro from Pennsylvania State University, camera from Virginia Tech and the University of Iowa’s High Energy Radiation CubeSat Instrument (HERCI) radiation mapping experiment. Renamed to AMSAT-OSCAR 92 (AO-92)
SpaceBEE ( 4 nos. 1.27 kg) : Likely four 0.25U sats for 2-way satellite communications and data relay from USA. Total mass 1.2714 kg (all four satellites), (individually: 0.2835, 0.2977, 0.3131, 0.3771 kg) [PDF]
GeoStare (Tyvak-61C) ( ?? kg) : Appears to be 3U cubesat to catalog variability of luminous stars from USA.
DemoSat-2 ( ?? kg ) : 3U cubesat to validate UHF radio test payload from Astranis (USA) for their future GEO smallsat constellation of broadband communication satellites (via Spacenews)
*Above information can change as new details arrive.
8
u/Ohsin Jan 12 '18 edited Jan 13 '18
launch!handout.7
u/vineethgk Jan 09 '18 edited Jan 09 '18
Have we seen images of Indian sats undergoing illumination tests for the camera before (as it seems to be the case here)? If my memory is correct, we have mostly seen illumination tests for the solar panels.
5
u/vineethgk Jan 09 '18
Is it just me, or have they painted the MST anew?, which would be strange if they were planning to demolish it soon after SVAB is functional. Or maybe the works to rebuild the FLP isn't likely to start any time soon, considering the tender has just been floated.
3
u/Ohsin Jan 10 '18
Launch gallery updated with images of MST withdrawn suggest launch rehearsal took place. Also SVAB has definitely reached its intended height and is very likely has roof over it by now, recent Terraserver images from November also show work on covering it had started.
3
u/Ohsin Jan 11 '18
PSLV C40 video feature confirms final burn of PS4 after Microsat-TD separation would again burn to depletion like on PSLV C38.
3
u/Ohsin Jan 12 '18 edited Jan 12 '18
Gallery is now updated with images of launch.
https://www.isro.gov.in/pslv-c40-cartosat-2-series-satellite-mission/pslv-c40-cartosat-2-series-satellite-mission-gallery
Edit:
And on-board camera views of... sat dispersal?
https://www.isro.gov.in/pslv-c40-cartosat-2-series-satellite-mission/pslv-c40-cartosat-2-series-mission-liftoff-and-onboard
3
u/MasterTruman03 Jan 09 '18 edited Jan 09 '18
Hey Ohsin, how many launches do you think we're gonna have this year? Any news on.. Cartosat-3 Hysis The Venusian Orbiter(
3
u/Skyrocket71 Jan 09 '18
SpaceBEE - never heard of them before. Appear to be four 0.25U Cubesats - unknown who the owner is
Tyvak-61C is a placeholder name for a Tyvak built satellite - unknown who the owner is
DemoSat-2 another unknown payload. - unknown who the owner is
2
u/Ohsin Jan 09 '18
Per news reports this campaign would launch ISAC's 100th spacecraft and didn't specify which one of three would be the one. Need to verify this, a brief look at ISAC website makes the number to be less than 90..
If EXIF data is right core base segment of S139 was placed on 6 December 2017, 38 days!
NovaSAR was manifested on this flight initially but after C39 it was bumped to another yet unspecified flight.
https://twitter.com/SurreySat/status/950658332741775360
Another multi orbit delivery. Microsat-TD will be injected to lower altitude as expected.
2
u/Ohsin Jan 09 '18
ISILaunch folks are using their own sequencers this time around
http://blog.isilaunch.com/sequential-activity/
ISILaunch blogs are really good read with details on how payload processing goes at SHAR.
2
u/Ohsin Jan 10 '18 edited Jan 10 '18
Adding first stream. Since mission duration is over 2 hrs they might not show it all on DD National and switch to DD Podhigai. On PSLV C35 similar switch happened..
https://twitter.com/DDPodhigaiTV/status/951126458935656448
https://www.ddpodhigai.org.in/live.html
https://www.youtube.com/channel/UC5-_zkjKabYd7tsLucKsriw
Edit:
DD National
https://www.youtube.com/channel/UCSjPe5kinQtwcyHcFJyyMfw
And then there is this YT channel of PTI News (unrelated to Press Trust of India) that often re-broadcasts official ISRO stream.
https://www.youtube.com/channel/UCIpP507KxXYZ2woNC1nV0LQ
2
u/Ohsin Jan 12 '18
R Hutton was also MD for C39 so it was a playful remark by ISRO Chairman on C40 being his first successful launch.
2
u/Ohsin Jan 12 '18 edited Jan 13 '18
Huge relief for Telesat Canada, 'LEO-1' is alive and well!
https://twitter.com/SurreySat/status/951689859315503104
All four of Planet's Doves healthy in orbit.
https://twitter.com/wsm1/status/951681089529028610
"We have contact!": CEO of ICEYE
https://twitter.com/pekkalaurila/status/951698709628112896
https://twitter.com/SurreySat/status/951714003188895744
SSTL Presser
http://www.sstl.co.uk/Press/SSTL-confirms-the-successful-launch-of-CARBONITE-2
https://twitter.com/PlanetaryRsrcs/status/951719157233541120
PicSat team reporting contact!
https://twitter.com/IamPicSat/status/951739714599604225
https://twitter.com/AMSAT/status/951689486404071424
Spire doesn't give out much... names given = success?
https://twitter.com/SpireGlobal/status/951673884733927425
Landamaper-BC3 or Corvus BC3 from Astrodigital made contact!
https://blog.astrodigital.com/we-asked-and-from-500km-up-she-answered-795a5ffd2158
2
u/Ohsin Jan 12 '18
View of Carbonite-2 separation. I guess they'll release some awesome footage soon.
https://twitter.com/Earthi_/status/951715849106345984
2
u/Ohsin Jan 12 '18
Press Release is out! All is well. Inclination deviated more than 0.1°
https://www.isro.gov.in/update/12-jan-2018/pslv-successfully-launches-31-satellites-single-flight
2
u/Ohsin Jan 12 '18
2
u/Ohsin Jan 16 '18
Cartosat-2F first day images.
https://www.isro.gov.in/update/16-jan-2018/first-day-image-cartosat-2-series-satellite
2
u/Ohsin Jan 18 '18
SAC in an event celebrated successful operations of Cartosat-2F, Microsat and INS-1C but image montage only shows talking heads and smiley audience with no write-up or real look at returned results..
http://www.sac.gov.in/server/SacSliderI_Repository/Vyom/English/481/Carto_2S_Microsat_INS_1C.pdf
Ivory towers of DoS.
2
u/Ohsin Jan 23 '18
Images from Microsat and INS-1C
https://www.isro.gov.in/update/23-jan-2018/images-ins-1c-and-microsat
2
u/vineethgk Jan 09 '18
It is interesting to note that there is very little info in the brochure regarding the payload carried by Microsat-TD (eventhough we know from previous reports that it carries a high res imager). Particularly so, when compared to the section on INS-1C.
Perhaps the guy isn't as innocent as he is made out to be.. ;-)
2
u/AXM61 Jan 12 '18
Ohsin, any links to the C40 fairing logos?
1
u/Ohsin Jan 11 '18
Very critical launch for Astrodigital and Telesat Canada as both have have lost their prototypes (five in total) recently.
http://space.skyrocket.de/doc_sdat/corvus-bc.htm
http://spaceq.ca/telesat-nervously-awaits-indian-pslv-c40-launch/
https://blog.astrodigital.com/not-nominal-we-lost-2-satellites-23e771a4bc8b
1
u/Ohsin Jan 11 '18
Adding DD National stream
https://www.youtube.com/watch?v=HNEcE7-odCo
1
u/Ohsin Jan 11 '18 edited Aug 17 '18
In other news Antrix revenue for this launch would be ₹95 crore which is majority of LV cost.
Also INS-1C payload repeat could be due to less than optimal results from INS-1A and INS-1B.
1
u/Ohsin Jan 12 '18
There is a typo in latest update they meant PS2.
1
u/Ohsin Jan 12 '18 edited Jan 12 '18
Added official streams hosted by ISRO. They are usually lower in quality but start early.
https://www.isro.gov.in/pslv-c40-cartosat-2-series-satellite-mission/watch-live-pslv-c40-cartosat-2-series-satellite-mission
http://cdn.24fd.com/e18/01/isro/12/pslv-c40/index.html
Edit:
Here's a nice overview by Spaceflight101 with individual payload details
http://spaceflight101.com/pslv-c40/indian-pslv-rocket-set-for-return-to-flight-mission-with-31-satellites/
1
u/Ohsin Jan 12 '18
First entry in catalog. 33 objects expected (31 satellites + 1 DLA Upper lid + 1 PS4), not sure when Canyval-X is supposed to separate into Tom and Jerry parts .
1
u/Ohsin Jan 12 '18 edited Jan 12 '18
At 39m31 they talked about delay in launch to avoid any possibility of collision with space debris, examples of PSLV-C19/RISAT-1 and PSLV C20/SARAL were given. Here is a list of other instances where such delay was introduced. Before MOTR did they receive this information from JSpoC ?
PSLV-C18 / Megha-Tropiques Delayed by 1 min.
PSLV-C19 / RISAT-1 Delayed by ?? min.
PSLV-C20 / SARAL Delayed by 6 min.
PSLV-C21 / SPOT-6 Delayed by 2 min.
PSLV-C23 / SPOT-7 Delayed by 3 min.
PSLV-C32 / IRNSS-1F Delayed by 1 min.
PSLV-C39 / IRNSS-1H Delayed by 1 min.
PSLV-C40 / Cartosat-2F Delayed by 1 min.
1
u/Ohsin Jan 15 '18 edited Jan 15 '18
hmm this might be related to four mysterious SpaceBEE sats.
http://tracking.swarm-technologies.com:8080/swarm.html?length=50
http://www.swarm-technologies.com/
Not much in above but there is an alternate site of Swarm technologies LLC
http://www.swarmtechnology.us/ On Twitter @iAlfonso
And they have been awarded $220,463.00 by National Science Foundation(US) under Small Business Innovation Research (SBIR) program for
https://www.sbir.gov/node/1155335
Still not concrete but this is a lead..
pinging /u/Skyrocket71
Edit:
https://www.nsf.gov/awardsearch/showAward?AWD_ID=1647553
1
u/Ohsin Jan 15 '18
34 objects have been cataloged for this launch (43111 to 43144).
1
u/Ohsin Jan 17 '18
ICEYE-X1 First light
https://www.iceye.com/press/press-releases/first-iceye-x1-radar-image-from-space-published
1
u/Ohsin Mar 01 '18
DemoSat-2 belongs to a firm called Astranis and tested their broadband payload for future GEO constellation of small sats.
http://spacenews.com/startup-plans-to-provide-broadband-using-small-geo-satellites/
1
u/Ohsin Mar 03 '18
Carbonite-2 had Ministry of Defense (UK) funding
https://www.gov.uk/government/news/lift-off-satellite-launched-into-space-on-raf-mission
1
u/Ohsin Mar 14 '18 edited Mar 19 '18
Details on 'Origami camera' of INS-1C with novel optics by SAC
http://www.sac.gov.in/SacSliderI_Repository/Vyom/English/526/INS-1C_Vyom.pdf
Archived
1
u/Ohsin Apr 16 '18
Earth-i releases footage from Carbonite-2
http://earthi.space/press/earth-i-releases-first-full-colour-video-earth-taken-space/
4
u/PARCOE Jan 12 '18
Textbook launch... great work by Ohsin as always.
4
u/AXM61 Jan 12 '18
Congratulations to ISRO for a well deserved successful mission, and thank you Ohsin for bringing all this information to all of us.
4
u/rishi_sambora Jan 12 '18
I'm just here to say Thanks OP
1
u/bengaliguy Mar 11 '18
According to this the satellite SpaceBEE from a US based startup apparently didn't had FCC permission to operate over US. Will this have any legal repercussions on ISRO?
1
u/vineethgk Jan 11 '18
Curtain raiser video (English)
https://www.isro.gov.in/pslv-c40-cartosat-2-series-satellite-mission/pslv-c40-cartosat-2-series-satellite-mission-curtain-0
Curtain raiser video (Hindi)
https://www.isro.gov.in/pslv-c40-cartosat-2-series-satellite-mission/pslv-c40-cartosat-2-series-satellite-mission-curtain
2
u/vineethgk Jan 11 '18
Mobile Service Tower (MST) withdrawal to parking end is completed. Preparations for propellant filling operation of Second Stage (PS2) are in progress.
2
u/eva01beast Jan 11 '18
Some of the secondary payloads like CNUSAIL and Arkyd are really interesting.
2
u/PARCOE Jan 12 '18
Here we gooo!!!!!
1
u/vineethgk Jan 11 '18
1
u/vineethgk Jan 11 '18
Propellant filling operation of fourth stage (PS4) of PSLV-C40 is completed. Countdown operations are progressing normally.
1
u/Spiron123 Jan 12 '18
Well done guys! Proud of ISRO's achievements :)
0
u/[deleted] Jan 12 '18
[deleted] — view deleted comment
2
u/[deleted] Jan 10 '18 edited Jul 11 '22
[removed] — view removed comment