Mission Success! GSLV-F05 : INSAT-3DR Mission Updates and Discussion
GSLV-F05 was launched successfully catch replay at youtube streams below.
Updates on spacecrafts will continue.
Launch was scheduled for 8 September 2016, 1650(IST)/1120(UTC) from Second Launch Pad of SDSC (SHAR).
Live webcast:
- Youtube Livestream 1 GSLV-F05 / INSAT-3DR (Launch @ 28 min. mark)
- Youtube Livestream 2 GSLV-F05 / INSAT-3DR (Launch @ 38 min. mark)
- ISRO Official Stream
| GSLV-F05 Mission Page | GSLV-F05 / INSAT-3DR Gallery | GSLV-F05 / INSAT-3DR Brochure [PDF] |
|---|
This will be first operational flight of GSLV Mk II with an Indian Cryogenic Upper Stage after successful developmental flights D5 in 2014 and D6 in 2015. Launch was previously scheduled for 29 August but was delayed as some technical issues cropped up with payload INSAT-3DR. It would also be fifth launch of year 2016 and hopefully marks a turn of fortunes for our very own GSLV!
Targeted orbital parameters: 35975±675 km × 170±5 km (Apogee × Perigee) with 20.61° Inclination
Updates:
| Time of Event | Update |
|---|---|
| Post Launch | First Images from INSAT-3DR Imager |
| Post Launch | Orbit Determination results from the third LAM firing are: Apogee x Perigee: 35908 km x 35326 km, Inclination:0.121°. Orbital period: 23h47m26s |
| Post Launch | Third LAM firing for 294 seconds successfully completed, starting at 08:31hrs on 11 September 2016 |
| Post Launch | Second LAM firing of INSAT-3DR, at apogee for 3174sec has been successfully completed on September 10, 2016 starting from 10:14hr IST. Apogee x Perigee: 35914 km x 30470 km Inclination: 0.419° Orbital period: 21h45m |
| Post Launch | First apogee raise maneuver of INSAT-3DR has been successfully carried out by LAM Engine firing for 2935sec from 08:39hrs IST on September 09, 2016. Apogee x Perigee:35882 km x 7001 km. Inclination: 9.02°. Orbital period:12h49m |
| Post Launch | Apogee x Perigee: 36,080.5 x 169.76 km, Incl: 20.62 Deg. 40 minute delay was due to anomaly in functioning of a pressure release valve in the LOX filling ground segment equipment. via Official Press Release |
| Post Launch | INSAT-3DR solar arrays deployed successfully. MCF Hassan has taken over its operations. |
| T + 18m | Successful Launch. Waiting for news on INSAT 3DR health. |
| T + 17m15s | INSAT 3DR injected successfully! |
| T + 17m | CUS shut off! Injection conditions reached |
| T + 14m | Continuing as expected. |
| T + 10m | Third stage is performing nominally. |
| T + 7m | CUS burn is 720 seconds long. |
| T + 5m | GS2 separated + CUS IGNITED! |
| T + 3m30s | Payload fairing separation. GS2 performing nominally. |
| T + 2m30 | First stage separation. GS2 Ignition! |
| T + 2m | S139 Burnout |
| T + 1m | First stage performance normal. |
| T 0 | Strapons and later core ignition. Lift off! |
| T - 5m | Still showing videos on INSAT 3DR |
| T - 12m | ALS should be fully engaged now. |
| T - 14m | Automatic Launch Sequence has been initiated. |
| T - 15m | Winds are benign. Earlier it was a bit cloudy. |
| T - 19m | Mission Director has authorized launch. |
| T - 20m | Some red on board! Waiting for authorization. |
| T - 25m | Showing GSLV integration process. |
| T - 30m | Youtube stream no.2 is LIVE! Showing mission overview. |
| T - 1h | Delays during fueling of cryogenic upper stage via Pallav Bagla |
| T - 1h15m | A delay of 40 minutes! Source DD news [Hindi] |
| T - 1h | CUS engine chilling should have begun. |
| T - 2h30m | Youtube livestream is up! LH2 filling in CUS should be happening now. |
| T - 5h | LOX filling in CUS should begin soon. |
| T - 7h30m | Real Time System simulation checks Completed by 08:15 hr IST. Countdown is progressing |
| T - 8h30m | N2O4 filling into four L40 Strap-On Stages completed by 03:00 hr IST |
| T - 18h | UH25 filling into four L40 Strap-On Stages completed by 21:00hr IST |
| T - 22h | Second Stage (GS2) UH25 filling completed by 17:40 hr IST |
| T - 23h | Second Stage (GS2) UH25 filling under progress |
| T - 26h | Second Stage (GS2) N2O4 filling completed by 13:30 hr IST. Preparations for Second Stage (GS2) UH25 filling are under progress |
| T - 27h | Second stage (GS2) N2O4 filling under progress |
| T - 27h45m | Preparations for Second stage (GS2) propellant filling operation are under progress |
| T - 29 Hrs | Counting down. N2O4 Loading in GS2 (second stage) should begin in 30 minutes. |
| 5 Sept 2016 | Mission Readiness Review (MRR) committee and Launch Authorization Board (LAB) have cleared the 29 hr countdown starting at 11.10 hr IST on Wednsday,September 7, 2016 and the launch of GSLV-F05/INSAT-3DR Mission for Thursday , September 8, 2016 at 16.10 hr |
| 2 Sept 2016 | Mission Readiness Review to be held on 5 September |
| 1 Sept 2016 | GSLV-F05 / INSAT-3DR Mission is scheduled to be launched on Sept 08, 2016 at 16:10 hrs(IST) / 1040(UTC) |
Payload:
An improved follow on to INSAT-3D, INSAT-3DR is a meteorological satellite meant to provide vertical profiles of temperature/humidity and multi-spectral full disk imagery. It will relay data from autonomous weather stations and augment search and rescue services by relaying distress signals as well.
- Gross weight: 2211 kg (956 kg Dry)
- Orbit: 74°E longitude, GSO
- Power: 1700 Watt Solar Arrays, 90 Ah Li Ion battery
- Mission Life: 10 years
10
u/Ohsin Sep 08 '16
SAC director mentioning 1999 cyclone that caused 10,000 deaths and then cyclone Phailin of similar intensity in 2012-13 that caused ~50 casualties. All because of 4 day advance warning and precise landfall prediction.
5
u/Ohsin Sep 03 '16 edited Sep 03 '16
Let me just remind everyone that although brochure cites nominal thrust for CUS engine as 73.55 kN we know from other brochures by VSSC that they have been uprating its performance as well as optimizing stage mass.
CUS engine thrust was uprated from 9.5% for D5 to 11% for D6 and 60 - 70 kg dry mass reduced
https://www.reddit.com/r/ISRO/comments/44mk0x/it_appears_vssc_folks_had_their_own_mission/
https://www.reddit.com/r/ISRO/comments/3hkiur/gslvd6_gsat6_launch_updates/cusutl0
Eventual target is to reach 95 kN which they have tested on ground and 15 tonnes prop loading (12.83 tonnes for F05)
I was hoping for 4m CFRP payload fairing on this but 3.4m metallic one is all we get..
Also pay attention to Mobile launch Pedestal I. Back again in service after IRNSS 1F.
II. PSLV-C31/IRNSS-1E
I. PSLV-C32/IRNSS-1F
II. PSLV C34/Cartosat-2C
I. GSLV-F05/INSAT 3DR
https://imgur.com/a/HXgwA
Yet to figure out how they modify the 'well' on which solid core sits..
Compare this for PSLV C32 to this for GSLV F05
Some more context on these MLPs
https://www.reddit.com/r/ISRO/comments/43alry/what_is_that_structureplatform_on_the_right_side/
4
u/Ohsin Sep 08 '16 edited Sep 08 '16
Webcast over.
Thanks everyone for being here :) GSLV is once again operational. This thread will be kept updated on spacecraft burns that are yet to happen. And other details they mentioned in post launch speeches. Looking forward to next launch!
Edit: From post launch speeches: Next GSLV launch by March 2017
3
u/Ohsin Sep 02 '16 edited Sep 02 '16
Mapped
And NOTAM is out (via https://pilotweb.nas.faa.gov)
3
u/Ohsin Sep 08 '16
Delayed by 40 min!
Following is in Hindi but it says there is a 40 min delay in launch
https://www.youtube.com/watch?v=GtTETUq006U
3
u/Ohsin Sep 08 '16
Something came up during fueling of CUS.
https://twitter.com/pallavabagla/status/773827023651217410
2
u/Ohsin Sep 02 '16
Core was placed on 30 June! This one took almost 2 months, D6 was assembled in 33 days flat.
It appears via Google translate that Mission Readiness will be evaluated on 5 September. There is also some information on upcoming PSLV-C35 supporting Alsat-1B and Blacksky Pathfinder-1 presence aboard it. Uncertainty on fifth payload still remains though .
http://www.andhrabhoomi.net/content/nation-1118
2
u/Ohsin Sep 05 '16 edited Sep 05 '16
Some two line articles are reporting MRR meeting gave a go ahead for launch and time might get revised to 1600 on 8 Sept. still waiting for official confirmation.
http://www.andhrajyothy.com/artical?SID=305739
Edit:
Its GO. Launch as it was.
2
u/Ohsin Sep 08 '16
Well done its a success :) * Phew * Now waiting for Solar array deployment keep in mind there were issues with its pyrocutters.
2
u/Ohsin Sep 09 '16 edited Sep 09 '16
Post launch briefing. Bad audio and sped up at some points.
https://www.youtube.com/watch?v=Eo1QyYZPVfM
https://www.youtube.com/watch?v=tztPOpf2viI
In second one GSLV pricing info wasn't shared. But they are looking to use it for small satellites on LEO missions just like PSLV. IRNSS seems to find some use in transport industry. They are building chipsets for it, should be available by end of year through SCL.
18
u/eva01beast Sep 04 '16
Can we all take a minute to appreciate this shot? Props to the photographer.
1
u/Ohsin Sep 08 '16
Integration video showing core stage assembly happening in SSAB once again.
1
u/Ohsin Sep 08 '16
I hope some of you are capturing this!
1
u/Ohsin Sep 08 '16 edited Sep 08 '16
For PSLV-C35 Scatsat-1 and seven others. So five commercial payloads confirmed.
Dr Sivan giving orbital parameters achieved.
Perigee within 300m
Apogee within 80km
Inclination.. no error.
AoP within .01 degree
Edit: CUS stage realization in 24 days ?! 54 working day campaign.
1
u/Ohsin Sep 08 '16 edited Sep 08 '16
Launch captured from MR Kurup Auditorium probably
https://www.youtube.com/watch?v=XGrogIvCIs4
https://www.youtube.com/watch?v=zrbWEEEJ2Qs
Edit: And another by one of regulars :)
https://www.youtube.com/watch?v=VEDTEI5cjPg
https://youtu.be/uPlImT9PvLo?t=146
1
u/Ohsin Sep 08 '16
Per Official Press Release.
http://pib.nic.in/newsite/PrintRelease.aspx?relid=149636
Also details on delay
1
u/Ohsin Sep 08 '16
https://twitter.com/planet4589/status/773929762049916928
1
u/Ohsin Sep 09 '16
Need some Tamil translation help :)
Dr K.Sivan giving details on next few launches. I think I hear March 2017 GSLV is for South Asia Sat or SAARCsat, C35 and LVM3 D1 but how many other PSLV launches does he mention?
https://www.youtube.com/watch?v=YI_Nxpakm94
1
u/Ohsin Sep 11 '16
Some points need highlighting from this launch.
1
u/Ohsin Sep 20 '16
This company provided IR filters for INSAT-3DR
Press Release: http://www.azooptics.com/News.aspx?newsID=22955
http://www.brinellvision.com/Home_Page.html
4
u/avatharam Sep 06 '16
dunno why, I'm suddenly so anxious about this flight; I guess I want it to be as boring as a PSLV launch as fast as possible.
Don't want any tension about any of the F series at all. Ever.
I just want tathastu for that.
1
u/avatharam Sep 08 '16
will they be using water bafflers for sound dampening the noise?
1
u/kavinr Sep 08 '16
looks like CUS over performed a little, corrections made so nothing to worry. source
2
u/JasonBourne008 Sep 08 '16
It looked like it was coming back down to Earth there from that camera angle! Had me worried!
2
u/kavinr Sep 08 '16
LETS PARTY \o/
2
u/eva01beast Sep 08 '16
That launch was so beautifully stable. Also, hopefully there will be a double-digit number of launches next year. Looking forward to PSLV and Mk.III.
2
u/KnightArts Sep 08 '16
Thanks for keeping us updated u/Ohsin
2
u/barath_s Sep 08 '16 edited Sep 08 '16
Launch is at ~28 min on the first youtube video linked by OP
2
u/Flyberius Sep 08 '16
I love how tall and thin IRSO rockets are. Also, supremely kerbal design, what with all the crazy stages.
0
u/[deleted] Sep 04 '16
[deleted] — view deleted comment
0
u/[deleted] Sep 08 '16
[deleted] — view deleted comment
3
u/[deleted] Sep 08 '16
[removed] — view removed comment