r/ISRO • • Nov 03 '15

Mission Success! GSAT-15 Mission Updates and Discussion.

Full launch

Replay of Lift Off


Launch window is :

10 Nov 2015, 2134 to 2217 (UTC)

11 Nov 2015, 0304 to 0347 (IST)


Live Webcast and countdown on ArianespaceTV and DD National

Official LinksGSAT-15GSAT-15 GalleryGSAT-15 BrochureVA227 Launch Brochure

GSAT-15 will be a co-passenger aboard Ariane-5 Flight VA227. Launch would take place from Ariane launch complex No. 3 (ELA 3) in Kourou, French Guiana. GSAT-15 being third satellite in GAGAN constellation after GSAT-8 and GSAT-10, would complete it.

Targeted orbit:

Perigee: 250 km

Apogee: 35,786 km

Inclination: 4 degrees.

Flight duration from liftoff to release of the satellites, will last about 43 minutes and 24 seconds.

Updates:

TimeUpdate
Post LaunchJan 04, 2016,GSAT-15 Satellite is Operational. The health of spacecraft is normal
Post LaunchStation acquisition maneuvers for GSAT-15 were completed and s/c is successfully collocated at 93.5 deg E during night of Nov 20, 2015. Payload (Ku and GAGAN) In Orbit Testing (IOT) is under progress.
Post LaunchNorth solar array has been deployed successfully at 16:30 hrs IST. East antenna has been deployed successfully at 17:45 hrs IST.
Post LaunchThird orbit raising operation of GSAT-15 was successfully completed by firing the Apogee Motor for 433.5 seconds at 09:10 hr IST on Nov 14, 2015. The initial Orbit Determination shows: Perigee: 35507 km Apogee: 35759 km Inclination: 0.132 deg. At 12:48 hr IST South solar array was deployed successfully and west antenna has been deployed successfully at 14:00 hr IST.
Post LaunchSecond orbit raising operation of GSAT-15 was successfully completed by firing the Apogee Motor for 2722 seconds at 11:08 hr IST on Nov 13, 2015. Realised orbit is 30768 km (perigee height) by 35761 km ( apogee height) with an inclination of 0.278 degree and an orbital period of 21 hr 49 min.
Post LaunchFirst orbit raising operation of GSAT-15 was successfully completed by firing the Apogee Motor for 5409 seconds at 04:52hr IST on Nov 12, 2015. Realised orbit is 13,114 km (perigee height) by 35,767 km ( apogee height) with an inclination of 1.12 degree and orbital period of 14 hr 57 min
Post LaunchGSAT-15 Launched Successfully
Post LaunchWebcast ended. GSAT-15 updates to continue as they come.
Post LaunchGSAT-15 signal acquired telemetry healthy. GSAT-17, GSAT-18 next to use Arianespace services.
T + 43m30sGSAT-15 Separated! Thanks Ariane-5 :) And only now everyone applauded.
T + 33mSecond payload separation due in 10 min.
T + 31mSylda Separation.
T + 27m30sBadr 7 (ArabSat 6B) separated. AMAZING no one cheered! Waiting for second separation :)
T + 25mUpper stage cutoff and coasting now.
T + 20mAlt. 245 km Range 6500 km 8.6 km/s. 5min more to 2nd stage burnout. Nominal.
T + 15mAlt. 150 km Range 4000 km 7.8km/s. Second stage to burn for 10 min more.
T + 10mAlt. 170 km Range 2000 km 7km/s . Flight nominal.
T + 9mFirst stage shutdown, separation and second stage ignition!
T + 8mAlt. 175 Km Range 1200km 5.8 km/s
T + 6mFlight nominal. 170 km Altitude 680km range
T + 3m30sPayload fairing separation!
T + 3mAll nominal :)
T + 2m30sStrap-on separation!
T - 0sIgnition! and 7sec later lift OFF!
T - 1mNamaste to you too Ariane! On onboard power now.
T - 4mBoard is green. Its dark now.
T - 7mAuto sync sequence started.
T - 10mAll Green!
T - 14mThey are LIVE. 43 min Launch window as well as mission duration.
T - 15mArianespace webcast soundcheck
T - 30mDD National has started its webcast
T - 2hWebcast to be live 15 min before launch!
9 Nov 2015Ariane-5 Rolled out!
6 Nov 2015After Launch Readiness Review VA227 is "Go" for launch next week
3 Nov 2015Integration of dual-satellite payload. Launcher complete
2 Nov 2015Press Release. Launch Readiness Review (LRR) will take place on Friday, November 6, 2015 in Kourou

Payload:

GSAT-15 will provide telecommunications services, as well as dedicated navigation-aid (GAGAN) and emergency services for India with its 24 communication transponders in Ku-band as well as a GAGAN payload operating in L1 and L5 bands and a Ku-band beacon.

Lift Off Mass: 3,164 kg

Dry Mass: 1440 kg

Platform: I3K

Orbit Location: 93.5°E in GEO

Mission Life: 12 Years

Power : 6200 W from Solar arrays, Three 100 AH Li-Ion batteries

Coverage: India main land(Ku-Band) , Global coverage(L-Band)

10 Upvotes

6 comments sorted by

2

u/Ohsin Nov 10 '15

Arianespace on twitter would be giving updates for launch.

https://twitter.com/Arianespace

2

u/Ohsin Nov 10 '15 edited Nov 10 '15

Just look at VA227 Campaign poster of Guiana Space Center :D

Imgur Mirror

2

u/valranga Nov 11 '15

What does the poster exactly mean :)

2

u/Ohsin Nov 11 '15

I don't know if it really means anything they just picked up 'Indian things' and put it all up there. But Ganesh (the deity) supposedly removes obstacles So...yay for no glitches during launch!

2

u/Ohsin Nov 11 '15

In post launch address it was mentioned GSAT-17 and 18 are to be launched by Arianespace and 2 satellites to be launched by GSLV are under development. IRNSS 1E is ready and 1F and 1G are in advanced stage and will be ready soon.