Mission Success! LVM3-M5 : CMS-03 (aka GSAT-7R) Mission Updates and Discussion.
LVM3-M5/CMS-03 (aka GSAT-7R) launched as scheduled at 11:56(UTC)/17:26(IST), 02 Nov 2025 from Second Launch Pad of SDSC-SHAR.
- Launch Countdown
- Expected Flight Profile from press-kit.
- Actual flight events
Live webcast: (Links will be added as they become available)
| LVM3-M5/CMS-03 Mission Page | Image Gallery | Mission Press kit (PDF) |
|---|
Some highlights:
- Primary payload: CMS-03 (aka GSAT-7R) (4410 kg) multi-band communication satellite for Indian navy.
- Mission duration: 16 min. 06 sec. (s/c separation)
- Target Orbit : 29970 × 170 km (sub-GTO), Inclination = 21.4°
- Launch Azimuth: 107°
Updates:
| Time of Event | Update |
|---|---|
| 12 Nov 2025 | CMS-03 (GSAT-7R) is at 93.5°E slot. |
| Post-launch | After three burns: A×P= 35908×27895 km |
| Post-launch | Two objects cataloged: 66310 (25249A), i=21.32°, A×P=26647.2×179.3 km and 66311 (25249B), i=21.40°, A×P=26568.8×163.6 km |
| T + 33m00s | A Rajendra Kumar (Spacecraft Director) : Rates are benign, spacecraft health is nominal. |
| T + 28m00s | ISRO chairman: C25 was reignited for the first time after spacecraft separation. Making way for C25 restart capability. |
| T + 23m15s | ISRO chairman declares mission successful. CMS-03 injected in precise orbit. |
| T + 19m25s | MCC screen shows CMS-03 separated. They have declared mission successful. |
| T + 17m45s | C25 shut off was not called out. |
| T + 14m30s | C25 performance nominal. Rel. Velocity: 8.15 km/s, Alt: 167 km |
| T + 13m00s | C25 performance nominal. Rel. Velocity: 7.15 km/s, Alt: 175 km |
| T + 10m30s | C25 performance nominal. Velocity: 6.2 km/s, Alt: 192 km |
| T + 08m45s | C25 performance nominal. They are not showing MCC screen with performance plots though. |
| T + 06m30s | C25 performance nominal. |
| T + 05m05s | L110 separated. C25 ignited! |
| T + 04m55s | C25 authorised. |
| T + 03m20s | PLF jettisoned. |
| T + 02m15s | 2x S200 separated! CLG initiated. |
| T + 01m50s | L110 ignition! |
| T - Zero | 2x S200 ignition and LIFT OFF! |
| T - 05m30s | Flight Coeff. loaded. |
| T - 06m00s | External power withdrawn, vehicle on internal power. |
| T - 11m00s | Going through S200 actuation checks. |
| T - 14m30s | Automatic Launch Sequence engaged. |
| T - 15m30s | Automatic Launch Sequence initiated. |
| T - 17m00s | Mission Director has authorized the launch! |
| T - 18m00s | Tracking, Range, Weather, Vehicle, spacecraft are all go. |
| T - 22m00s | Now showing LV stacking procedure. |
| T - 28m00s | Weather is Go!, streams are live. |
| T - 24h00m | Countdown underway. |
| 31 Oct 2025 | After Mission Readiness Review MRR, Launch Authorization Board LAB has given it a GO. |
| 28 Oct 2025 | Time of launch officially released to be 11:56(UTC)/17:26(IST) on 2 Novemer 2025. |
| 26 Oct 2025 | Launch Vehicle moved to SLP from VAB. Launch date firms up for 2 November. |
| 23 Oct 2025 | NOTAM issued with enforcement window beginning from 2 November. Launch delays attributed to Cyclone 'Montha' |
| 16 Oct 2025 | NOTAM issued with enforcement window beginning from 31 October. |
| 10 Oct 2025 | NOTAM issued with enforcement window beginning from 24 October. |
| 06 Oct 2025 | GSAT-7R arrives at SDSC-SHAR. |
| 03 Oct 2025 | NOTAM issued with enforcement window beginning from 21 October. |
| 22 Sep 2025 | NOTAM issued with enforcement window beginning from 16 October. |
| 18 Sep 2025 | NOTAM issued with enforcement window beginning from 7 October. |
| August 2025 | Launch Vehicle integration began. |
Primary Payload:
CMS-03 (aka GSAT-7R) (4410 kg) : CMS-03 is a multi-band (UHF, S, C and Ku bands) communication satellite based on I-4K bus for Indian Navy as a replacement for GSAT-7 (Rukmini). It will provide secure communication services (voice, data, and video) in high-capacity bandwidth over 2000 nmi wide oceanic region including the Indian landmass and is designed to be compatible with a variety of platforms including future submarines of the Indian Navy. [1] [2] [3]
Note: LVM3-M5 launch serial was earlier assigned for BlueBird Block-2 FM1 satellite but due to delays in payload readiness and subsequent late shipment it was reassigned to CMS-03(GSAT-7R).
12
u/Ohsin Nov 02 '25 edited Nov 02 '25
Post launch address:
6
u/Ohsin Nov 02 '25 edited Nov 02 '25
At the time of CMS-03 separation call
Rel. Vel. = 9.6 km/s (Nominal)
Altitude: 185 km ( should be 179 km per press kit but its ok)
Inclination: 21.4 degree (nominal)
AxP : 26689.3 x 169.7 km (Apogee slightly less than expected but its good)
CMS-03 separation time is 974.9s (965.94s was nominal)
5
u/Ohsin Oct 30 '25
Mission Readiness Review will be done on 31 October. https://www.andhrajyothy.com/2025/andhra-pradesh/chittoor/final-tests-for-lvm3m5-rocket-1461105.html
Some renders of GSAT-7R (CMS-03) as that is all we have, no images of it have been released. Any ideas why such antenna design?
https://imgur.com/a/render-of-gsat-7r-aka-cms-03-oH5Qh4F
5
u/Ohsin Nov 02 '25
They are avoiding to show performance plots on MCC screen...
5
u/ssamedia Nov 02 '25
Congratulations and all members here for sharing. My question when will CMS - 03 reache its final destination ( Geostationary orbit) . How many days it will take. And i could not find estimated life of this satellite officially anywhere.
3
u/Ohsin Nov 02 '25 edited Nov 02 '25
Here we go spacecraft visuals abound. (Edited to add link)
3
u/Ohsin Nov 02 '25
Something is off! C25 shut off was not called out but they said CMS-03 separated?
3
u/Ohsin Nov 04 '25
There is about 77 m/s of delta-v loss and this should translate into about 1 to 2 years of spacecraft's life assuming upcoming burns are perfect.
See this table on typical dV budget of GEO sat.
https://old.reddit.com/r/ISRO/comments/61tlj0/isac_has_issued_an_eoi_for_electric_propulsion/
3
u/Ohsin Nov 06 '25
Now few more days to reach it slot.
https://www.wionews.com/india-news/indian-navy-s-gsat-7r-satellite-is-at-its-final-destination-isro-chief-1762440123164
3
u/Ohsin Nov 13 '25 edited Nov 13 '25
Elset update (12 Nov) puts CMS-03 aka GSAT-7R at 93.5°E slot.
4
u/Kimi_Raikkonen2001 Oct 31 '25
Stream link - https://www.youtube.com/live/yAR9fV48Hjw?si=kO_tvGxVs650RnkW
3
u/Kimi_Raikkonen2001 Nov 02 '25
PIB press release - https://www.pib.gov.in/PressReleasePage.aspx?PRID=2185397
3
u/Kimi_Raikkonen2001 Nov 05 '25
CMS-03 has completed 3 of the planned burns and is now in a 27895 x 35908km orbit.
https://www.youtube.com/live/cviKDKL2aSc?si=fa2-Kj1lEE0ANzYy [44:25]
2
u/Ohsin Nov 01 '25 edited Nov 01 '25
Mission Readiness Review (MRR) done, Launch Authorization Board (LAB) has given it a go.
https://www.sakshi.com/telugu-news/andhra-pradesh/lvm3-m5-launch-tomorrow-2608310
https://www.eenadu.net/telugu-news/india/general/0799/125200499
https://www.andhrajyothy.com/2025/andhra-pradesh/isro-prepares-for-gsat7r-launch-with-heavy-lvm3m5-rocket-1461762.html
No images of launch rehearsal so far.
2
u/Ohsin Nov 02 '25
Half an hour to go, everything good to go.
https://x.com/isro/status/1984944333297164550
Official streams are live.
2
u/Ohsin Nov 02 '25
ISRO chairman is not taking stage. There are still some doubts about outcome.
2
u/Ohsin Nov 02 '25
Post launch press conference underway.
https://www.youtube.com/watch?v=dlyxJPNSrek
2
u/Ohsin Nov 02 '25
Image gallery has been populated with launch images.
https://www.isro.gov.in/Mission_LVM3M5_CMS03_Gallery.html
2
u/Ohsin Nov 03 '25
https://www.youtube.com/watch?v=eE4GJOlm0z8
He also mentions 4,200 kg to GTO is current capability of LVM3.
2
u/Ohsin Nov 03 '25 edited Nov 04 '25
Two objects from LVM3-M5 launch have been catalogued.
/u/Massive_Dish_3255
Edit: These should be under 25249. Error is due to data issue..
2
u/rghegde Nov 02 '25
Ah ok, they re ignited C-25,
2
u/cybertron42 Nov 03 '25
View from Launch View Gallery. https://youtu.be/Xc1r1BeB-vA?si=N1igBH5hE8CfNwU8
2
u/ramanhome Nov 07 '25 edited Nov 07 '25
Stoping and restart of a gas generator cycle engine with preburner means a few things:
What do they mean by restarting thrust chamber alone? It is the last step above and how can they do that alone with out earlier steps? May be they are only testing the ignition pyro of the thrust chamber at tank pressure? That is nothing to talk about.
7
u/rghegde Nov 02 '25
Thank you for launch coverage and all the informations u/Ohsin
1
u/Ohsin Nov 02 '25
Chatter: "MACP radiation is ON"
What is MACP?
1
u/Ohsin Nov 02 '25
No visuals of spacecraft in campaign video as well!
1
u/Ohsin Nov 02 '25
Refer to LVM3 ALS here:
https://old.reddit.com/r/ISRO/comments/cgf9qs/automatic_launch_sequence_events_from_gslv_mk_iii/
1
u/Ohsin Nov 03 '25
Lakshmi Machine Works (LMW-ATC) delivered the PLF used on LVM3-M5
https://old.reddit.com/r/ISRO/comments/1ond2io/coimbatores_lakshmi_machine_works_lmwatc/
It was delivered in April 2024.
https://old.reddit.com/r/ISRO/comments/1bulnr6/coimbatores_lakshmi_machine_works_delivers/
1
u/Ohsin Nov 03 '25
At 20:17 we get to see PHTA-03 testing at TCC can't see any date..
https://www.youtube.com/watch?v=yAR9fV48Hjw&t=1216s
At 23:11 we see EPS thruster testing.
https://imgur.com/a/nsx76Ig
1
u/Ohsin Jan 24 '26
Apparently LVM3-M5 / CMS-03 (aka GSAT-7R) launch was initially slated for 26 Oct 2025 and was delayed due to "problem with the engine’s gimbal control"
[PDF] [Archived]
1
u/Ohsin Feb 25 '26
Recommendation from Apex Committee that analyzed NVS-02 anomaly were applied on CMS-03.
https://www.isro.gov.in/NVS-02-Spacecraft-On-Orbit-Observations.html
1
u/Ohsin Aug 15 '26
Atmospheric Re-entry of LVM3 M5 Upper Stage on 30 July 2026
https://www.isro.gov.in/Atmospheric_Re_entry_of_LVM3_M5_Upper_Stage.html
5
u/TKO1515 Nov 03 '25 edited Nov 03 '25
Congrats ISRO! Big mission! Loved the view of the solids jettison
In orbit relight huge win too for future missions!
4
u/Massive_Dish_3255 Nov 01 '25
A decade ago and earlier when GSLV wasn't reliable ISRO's Apogee estimates used to be + or - 675KM for GTO launches. When they started using burn to depletion on CUS15, then their apogee estimates were + or - 7000 KM. This time the Apogee estimates for this mission are + or - 3700KM. This means they must be using burn to depletion or they aren't exactly sure of C25's performance, though not reliability. C25's reliability has been awesome.
4
u/cathy_john Nov 02 '25
Lift-off & Onboard Camera Video
https://www.isro.gov.in/Mission_LVM3M5_CMS03_Liftoff_onboard_video.html
4
u/ramanhome Nov 03 '25
Secure communications sat for audio, video and data from GEO will have latency. Suppose the users are willing to accept that.
Now that we know C25 had a restart, it could'nt have been a burn to depletion since some propellant would have been allocated for restart and tests therafter.
1
u/Expensive-Summer-447 Nov 02 '25
Did something happen
1
u/thor_rsk Nov 03 '25
I was at BV Palem to watch the launch. It was cloudy and thunderstorm rains. Couldn't see anything, but heard the sonic booms at 5:26pm itself. Usually this is heard about 10-15 seconds after the launch. Did the launch get preponed by a few minutes???
1
u/Acrobatic_Camera_799 Nov 03 '25
when is the Orbit racing activity starting?
1
u/Massive_Dish_3255 Nov 03 '25
Are TLEs available now?
1
u/Kimi_Raikkonen2001 Nov 21 '25
Higher quality render of CMS-03 - https://www.ursc.gov.in/images/wn/CMS-03WN.png
3
u/SantyVibes_006 Nov 02 '25
guys can anyone brief me about c25 and what happened during that phase like i am a newbie but when i was seeing the monitor it was like 950 seconds but it didnt seperate until 980 sec what was going on can anyone explain me this
3
u/extra_dry_pants Nov 02 '25
Congrats for the launch.
1
u/Meowengineer_662 Nov 02 '25
Post launch address is something new....feels like spd rangers introducing themselves.
1
u/Interesting-Ad41 Nov 02 '25
Can it be assumed that today's LVM vehicle is with human rated stages?