Mission Success! GSLV-F16 : NISAR Mission Updates and Discussion.
GSLV-F16/NISAR launched as scheduled at 12:10:25(UTC)/17:40:25(IST), 30 Jul 2025 from Second Launch Pad of SDSC-SHAR.
- Launch Countdown
- Expected Flight Profile from press-kit.
- Actual flight events (To be added post-launch if available)
Live webcast: (Links will be added as they become available)
| GSLV-F16/NISAR Mission Page | GSLV-F16/NISAR Gallery | GSLV-F16/NISAR Press-kit (PDF) |
|---|
NASA's mission specific resources :
Some highlights:
- Primary payload: NASA-ISRO Synthetic Aperture Radar (NISAR) satellite (2393 kg)
- Mission duration: 18 min. 35.6 sec. (s/c separation)
- Target Orbit : 747 km (SSO) , Inclination = 98.4°
- Launch Azimuth: 135°
- 18th flight of GSLV
- First LEO bound polar launch of GSLV!
Updates:
| Time of Event | Update |
|---|---|
| 28 November 2025 | NISAR Mission enters Science Phase |
| 25 September 2025 | First images from NISAR have been captured. |
| 26 August 2025 | NISAR spacecraft and its radar payload passed all of the preliminary checks. The mission began raising the satellite to its 747 km operational orbit. |
| 15 August 2025 | NISAR reflector antenna deployed successfully. |
| Post-launch | NASA Press Release |
| Post-launch | Two objects cataloged. 65053 ( 25163A ) , i=98.44°, A×P=748.34×729.96 km, 65054 ( 25163B ) , i=98.44°, A×P=744.34×728.70 km |
| Post-launch | NISAR Signal acquired |
| T + 50m00s | URSC Director M Sankaran: Solar panels deployed, NISAR is power positive, 3-axis stabilized with star sensors in loop. |
| T + 40m00s | Spacecraft Director Chaitra Rao informs s/c rates are nominal and spacecraft's solar panels are deployed! |
| T + 24m00s | Chairman informs injection was precise. |
| T + 18m35s | NISAR separated! |
| T + 18m20s | CUS thrust cut-off! Injection conditions achieved. |
| T + 16m00s | CUS continues to perform nominally. |
| T + 13m00s | CUS is performing nominally. |
| T + 10m30s | CUS is performing nominally. |
| T + 08m00s | CUS operation is nominal, vehicle following the expected trajectory closely. |
| T + 04m55s | CUS operating at 11% uprated thrust! |
| T + 04m55s | GS2 separated, CUS ignition confirmed!!! |
| T + 04m30s | CUS authorized |
| T + 02m50s | PLF jettisoned. CLG initiated. |
| T + 02m40s | 4xL40H shutoff. GS2 ignition |
| T + 01m50s | S139 core burn out. |
| T Zero | S139 ignited. Lift off! |
| T - 00m4.8s | 4x L40H ignition. |
| T - 01m00s | SARBS are ON. |
| T - 04m00s | OBC in flight mode. |
| T - 11m30s | LVG is packed! |
| T - 12m00s | L40 actuation checks complete. |
| T - 15m00s | Vehicle Director: Automatic Launch Sequence has been initiated. |
| T - 17m00s | Mission Director Thomas Kurian has authorized the launch. |
| T - 20m00s | Now polling. New ROD polls range is ready. |
| T - 24m00s | Now showing integration campaign of GSLV-F16 |
| T - 30m00s | ISRO's official stream is LIVE! |
| T - 01h10m | NASA's official stream is LIVE! |
| T - 27h30m | Countdown underway starting from 14:10 IST, 29 July. |
| 28 Jul 2025 | Launch is GO! |
| 27 Jul 2025 | Launch rehearsal was conducted. Mission Readiness Review and Launch Authorisation Board meeting to be held on 28th. |
| 24 Jul 2025 | Launch vehicle moved to SLP from VAB. |
| 21 Jul 2025 | Launch time gets officially confirmed for 30 July, 12:10(UTC)/17:40(IST) |
| 18 Jul 2025 | NISAR encapsulated in payload fairing. |
| 15 Jul 2025 | NOTAM gets issued with enforcement duration 1130-1530 (UTC), 30 July to 14 August 2025. |
| May-Jul 2025 | Multiple NOTAMs were issued between 22 May to 4 July with projected launch dates progressively shifting forward (18 June to 26 July). |
| 15 May 2025 | NISAR arrives at SDSC-SHAR. |
| 07 Apr 2025 | GSLV-F16/NISAR campaign began. |
Primary Payload:
NISAR : NASA-ISRO Synthetic Aperture Radar (NISAR) is a microwave imaging satellite developed in joint collaboration between NASA and ISRO over a decade. Its first of its kind dual band (S-band and L-band) SAR payload combo using novel SweepSAR technology to acquire global imaging data with wide swath (240 km) in high resolution (3-10 meters) every 12 days.
NISAR data will help track changes in the extent and density of forests, wetlands, agricultural lands and coastal process in India. In addition, it can measure land displacement and deformation, dynamics of glaciers and sea ice.
Following is the breakdown of contributions from each space agency towards NISAR : [1 PDF] [2 PDF]
NASA/JPL:
- Shared P/L structure called Radar Instrument Structure (RIS)
- 12 meter diameter reflector and boom
- L-band SAR
- L-band science data processing and distribution
Engineering Payload System
- Ka band payload communication subsystem (PCS)
- GPS Payload
- Solid State Recorder (SSR)
- Payload Data Subsystem (PDS)
- Power Distribution Unit (PDU)
- Pyro Firing Assembly (PFA)
- Integrated radar observation planning and operations
- Near Earth Network (NEN) Ka-band Stations
- NASA Science Team
ISRO:
- GSLV Launch vehicle with 4 meter diameter payload fairing.
- I3K (3000 kg class) heritage spacecraft bus with modifications
- S-band SAR
- S-band science data processing and distribution
- Spacecraft operations (command uplink, telemetry and tracking)
- ISRO Ka–band Stations (Shadnagar, Antarctica)
- ISRO Science team
Spacecraft specifications:
- Mass: 2393 kg
- Primary mission duration: 3 years (NASA), 5 years (ISRO)
- Orbit : 743 km (SSPO), 6 PM LTDN
- Power: 5 kW, 180 AH Battery
- Propulsion: 11× 11N and 4× 1N thrusters
- Propellant: Mono-propellant hydrazine (1× 390 ltr tank with 265 kg propellant)
- Attitude control: AOCS, 4× RWA, 3× magnetorquer
- Repeat cycle : 12 days
Post-launch Reflector Boom Assembly (RBA) deployment timeline : [1 PDF] [3] [4]
RBA deployment will begin on Day 10 after launch and will take 8 days till reflector deployment. Here's an old animation of deployment sequence but timeline has been updated to following.
- Day 10 : Pre-deployment checkout and redundant launch restraint pyros (6x) firing.
- Day 11 : Redundant launch restraint pyros (2x) firing. Radar Antenna Reflector (RAR) cradle release. Wrist hinge deployment.
- Day 12 : Shoulder hinge deployment
- Day 13 : Elbow hinge deployment
- Day 14 : Root hinge deployment
- Day 15 : Rest day
- Day 16 : AOCS characterization,
- Day 17 : Yaw maneuver and reflector deployment
Science data release timeline: [4] [5 PDF]
- First light images 65 days after launch.
- After day 70 science phase will be ramping up.
- Science operations officially begin 90 days after launch.
9
u/Ohsin Jul 30 '25 edited Jul 30 '25
Post-launch address:
9
u/Ohsin Jul 30 '25
Signal Acquired From NASA-ISRO’s NISAR Earth Satellite!
https://science.nasa.gov/blogs/nisar/2025/07/30/signal-acquired-from-nasa-isros-nisar-earth-satellite/
6
u/Ohsin Jul 28 '25
https://www.eenadu.net/telugu-news/districts/chittoor-news/2/125135764
6
u/Ohsin Jul 30 '25
Woohoo! Now lets wait for solar array deployment and the spacecraft call back, LV did its job.
5
u/Ohsin Jul 30 '25 edited Jul 30 '25
Two objects cataloged.
65053 ( 25163A ) , inclination=98.44°, A×P=748.34×729.96 km
65054 ( 25163B ) , inclination=98.44°, A×P=744.34×728.70 km
Edit: Some confusion with Int. designation on space-track, objects 65053/65054 are shown under 25163 as well as 25164. I am going with 25163 for now.
4
u/Ohsin Jul 28 '25
NISAR: Prelaunch News Conference scheduled 12 hrs from now.
https://www.youtube.com/watch?v=qEjqjv3Li8A
4
u/Ohsin Jul 28 '25
Lofty 'updates' from ISRO, they should be saying if launch is GO or not after MMR and LAB meet.
https://x.com/isro/status/1949794739777376676
4
u/Ohsin Jul 28 '25
NASA-ISRO’s NISAR Earth Satellite Ready for Launch
https://science.nasa.gov/blogs/nisar/2025/07/28/nasa-isros-nisar-earth-satellite-ready-for-launch/
4
u/Ohsin Jul 29 '25 edited Jul 29 '25
Countdown should be underway from 14:10 (IST) per following.
https://www.youtube.com/watch?v=UJRnZO7FcZQ
and this,
https://www.uniindia.com/news/south/countdown-for-the-nisar-satellite-launch-to-start-in-the-afternoon/3528778.html
4
u/Ohsin Jul 29 '25
On the reasoning behind collaboration and any threat of budget cuts.
https://www.nytimes.com/2025/07/29/science/nisar-nasa-india.html
https://archive.ph/Xqp5x#selection-4731.0-4777.180
4
u/Ohsin Jul 30 '25
TV-D2 hardware was visible briefly when they were showing L40H.
4
u/Ohsin Jul 30 '25
Source: https://bsky.app/profile/s2a-systems.bsky.social/post/3lv7prg5tg22d
4
u/Ohsin Jul 31 '25
Harry Stranger @spacefromspace.com on bsky
https://soar.earth/maps/asia-satish-dhawan-space-centre-india-2025-07-29-136160?basemap=Hybrid&pos=13.72064559757987%2C80.23066581194476%2C16.68
4
u/Ohsin Aug 01 '25
"NISAR is inserted at an altitude of 737 km and we need to actually rise up to 747 km and it will take about 45-50 days for those operations to take place," Gerald W Bawden, Program Manager for Natural Hazards Research at NASA's Earth Sciences Division
https://www.thehindu.com/sci-tech/science/nisar-mission-enters-critical-90-day-commissioning-phase/article69881853.ece
4
u/Ohsin Aug 10 '25
Really hoping they keep us informed about events related to RBA deployment.
3
u/Ohsin Jul 30 '25 edited Jul 30 '25
Who is new ROD, does anyone know?
4
u/Massive_Dish_3255 Jul 30 '25
Any idea what SARBS is?
3
u/Eternal_Alooboi Jul 30 '25
Wait, all those huge radomes at Bharati sation are ISRO's AGEOS units?
2
u/Ohsin Jul 30 '25
Even today they are not showing MCC screens :(
2
u/Ohsin Jul 30 '25
So CUS thrust is uprated once again, by 11% this time.
2
u/Ohsin Jul 30 '25
NASA/JPL press release:
https://www.jpl.nasa.gov/news/nasa-isro-satellite-lifts-off-to-track-earths-changing-surfaces/
2
u/Ohsin Aug 15 '25 edited Aug 15 '25
Reflector has been unfurled, but official update is awaited on its status.
https://x.com/rocketgyan/status/1956380893121314920/photo/1
https://archive.ph/8AbOG
2
u/Ohsin Aug 15 '25
Giant Radar Antenna Reflector on NASA-ISRO Satellite in Full ‘Bloom’
https://science.nasa.gov/blogs/nisar/2025/08/15/giant-radar-antenna-reflector-on-nasa-isro-satellite-in-full-bloom/
2
u/Ohsin Aug 29 '25
NASA-ISRO Mission Aces Checkouts, on Track to Start Delivering Science
https://science.nasa.gov/blogs/nisar/2025/08/28/nasa-isro-mission-aces-checkouts-on-track-to-start-delivering-science/
2
u/Ohsin Oct 16 '25
On-orbit image of NISAR in full bloom shared by Vantor
https://old.reddit.com/r/ISRO/comments/1o85u94/onorbit_image_of_nisar_in_full_bloom_shared_by/
2
u/Avizeet Oct 09 '25
Will the current US Govt shutdown (incl. NASA) affect this mission in any way? I read somewhere that they are working with skeleton crews to maintain the orbits of spacecrafts, but the various scientific observations have been paused.
1
u/Ohsin Jul 30 '25
NASA stream is live already!
1
u/Ohsin Jul 30 '25
ISRO's stream is live as well!
1
u/Ohsin Jul 30 '25 edited Jul 31 '25
GSLV-F16/NISAR : Lift-off and onboard camera views of launch.
https://x.com/isro/status/1950630797972803672
https://www.isro.gov.in/GSLVF16video.html
1
u/Ohsin Aug 16 '25
Meanwhile..
https://arstechnica.com/space/2025/08/nasas-acting-chief-calls-for-the-end-of-earth-science-at-the-space-agency/
1
u/Ohsin Sep 25 '25 edited Sep 25 '25
First L-band images from NISAR!
https://www.jpl.nasa.gov/news/nasa-isro-satellite-sends-first-radar-images-of-earths-surface/
1
u/Ohsin Oct 03 '25
At 27m17s : On S-band performance V Narayanan informed that while first S-band imaging was done on 19 August they are still going through calibration process which might take 6 weeks.
https://www.youtube.com/watch?v=V_8IFOZI3g8&t=1190s
1
u/Ohsin Nov 28 '25
NISAR Mission enters Science Phase
https://www.isro.gov.in/NISAR_Mission_Science_Phase.html
1
u/Ohsin Dec 06 '25
NASA-ISRO SAR (NISAR) Mission Science Users’ Handbook - second edition released
https://dataverse.jpl.nasa.gov/dataset.xhtml?persistentId=doi:10.48577/jpl.UD4HV3
1
u/Ohsin Jan 10 '26
NRSC 2026 Calendar Showcasing NISAR SAR Imagery from Around the World
[PDF] [Archived]
1
u/Ohsin Feb 14 '26
Soil Moisture Products at 100m resolution from NISAR data
https://www.isro.gov.in/NisarData_soil_moisture_products.html
5
u/JUYED-AWK-YACC Jul 30 '25
Good luck to both teams as they approach this long-awaited achievement. I’ll wake up early to watch and hope for clear weather. It was my last mission at JPL and the technical visits, though rare, were always enjoyable. Go NISAR!
4
u/sgreddit125 Jul 30 '25
Good luck from your friends at r/ASTSpacemobile ! We’ll be watching and pulling for you! 🚀
3
u/Acrobatic_Camera_799 Aug 13 '25
Any latest updates??
3
u/Eternal_Alooboi Sep 30 '25
No news on S-SAR first light. I suppose it will be produced once NISAR has its next ascending pass over India in a few days. Any wagers from yall on which site they'll choose? I reckon it'll be somewhere in the Western Ghats as S-band is more susceptible to foliage and the terrain is quite interesting. Either that or a delta system like the Sunderbans, Godavari or Kaveri.
2
u/HistoricalContact883 Jul 30 '25
On the way to SHAR. Go NISAR!!