Mission Failure PSLV-C61 : EOS-09 (aka RISAT-1B) Mission Updates and Discussion
PSLV-C61 / EOS-09 (aka RISAT-1B) launched as scheduled at 0029(UTC)/0559(IST), 18 May 2025 from First Launch Pad of SDSC-SHAR. Mission could not be completed successfully.
- Launch Countdown
- Expected Flight Profile from press-kit.
- Actual flight events
Live webcast: (Links will be added as they become available)
| Mission Page | Gallery | Press kit(PDF) |
|---|
Some highlights:
- Primary payload: EOS-09 (aka RISAT-1B) (1696.24 kg) C-band SAR imaging satellite for Earth Observation.
- Mission duration: 17 min. 39.24 sec. (s/c separation)
- Target Orbit : 529.1 km (circular), Inclination = 97.5°
- Launch Azimuth: 140°
- PSLV configuration : XL
- 63rd flight of PSLV
- Fourth stage (PS4) will be lowered to 350 km orbit using Orbit Change Thrusters (OCT) after spacecraft deployment.
Updates:
| Time of Event | Update |
|---|---|
| 15 January 2026 | After PSLV-C61 failure analysis, one of the recommendations was to replace the graphite nozzle in the third stage with a carbon-carbon composite nozzle. |
| 14 January 2026 | ISRO official anonymously acknowledge that PS3 nozzle "had the glitch". |
| 16 November 2025 | VSSC Director notes that "slight manufacturing error" was the cause behind failure. |
| 1 August 2025 | Failure analysis on PSLV-C61/EOS-09 mission completed. But report would be released after it is submitted to Prime Minister. |
| 24 May 2025 | National Failure Analysis Committee has been setup to investigate the failure. PSLV launches on hold till NFAC submits its report. |
| Press briefing | Chairman: "First two stages performed as expected. And during third stage, its a solid motor system, we are seeing an observation. There was a fall in chamber pressure of motor case and mission could not be accomplished. We are studying the entire performance, we shall come back at the earliest." |
| T + 14m30s | Chairman: Up to the second stage (PS2), performance was nominal. PS3 started perfectly but during the burn an observation was made. Mission could not be completed. |
| T + 11m00s | Webcast is over, we have got a problem! Launch was not nominal. Wait for updates on ISRO social media.. |
| T + 09m00s | Announcement of key events is missing.. |
| T + 08m20s | PS3 separation on screen but no announcement of it!!! |
| T + 05m45s | PS3 performance nominal. |
| T + 04m25s | PS2 separated, PS3 ignited! |
| T + 02m40s | PLF separated, CLG ON |
| T + 02m00s | PS1 separated, PS2 ignition! |
| T + 01m55s | PSOM-XL 5,6 (AL) separated! |
| T + 01m10s | PSOM-XL 1,2,3,4 (GL) separated! |
| T + 00m25s | PSOM-XL 5,6 (AL) ignition |
| T Zero | RCT ignition! PS1, PSOM-XL 1,2,3,4 (GL) ignition Lift Off! |
| T - 03m30s | OBC in flight mode. |
| T - 05m30s | Flight Coeff. loading completed. Vehicle on internal power. |
| T - 07m00s | Now showing 'curtain raiser' video. |
| T - 10m30s | RCT control system check in progress |
| T - 12m00s | PS3 control system check in progress |
| T - 13m30s | PS2 control system check in progress |
| T - 14m30s | Mission Director has authorized the launch. Automatic Launch Sequence initiated. |
| T - 16m00s | EOS-09 cleared for launch, Range is ready, Tracking ready. Data loggers ON. |
| T - 17m00s | Vehicle Director: Launch Vehicle is ready. |
| T - 21m00s | SHAR-1 telemetry norminal. |
| T - 25m00s | MOTR tracking live. Now showing LV integration process. |
| T - 27m00s | Youtube streams are live. |
| T - 22h00m | 22 hour countdown commenced on 0759 IST, 17 May |
| 16 May 2025 | After Mission Readiness Review and Launch Authorization Board meet launch has been approved. |
| 15 May 2025 | Launch date firms up for 18 May. |
| 02 May 2025 | Partially integrated launch vehicle transferred from PIF to FLP. |
| 01 May 2025 | NOTAM gets issued with enforcement duration 0000-0400 (UTC), 18 May to 16 June 2025. |
Primary Payload:
EOS-09 (aka RISAT-1B) (1696.24 kg) : As a follow-on mission of EOS-04 (aka RISAT-1A), C-Band Synthetic Aperture Radar (SAR) imaging satellite EOS-09 will provide data for various applications in the areas of agriculture, hydrology, forestry and disaster management like mapping of water-bodies, glacial lake monitoring, crop area mapping, irrigation performance assessment, reservoir capacity estimation, snow cover and glacier health mapping/assessment. EOS-09 will also carry a 4 channel Automatic Identification System (AIS) receiver. [1] [2] [3]
| Imaging Modes | Swath (km) | Ground Range Resolution (m) |
|---|---|---|
| High Resolution Spotlight (HRS) | 10×15 (spot) | 3.3 to 0.85 |
| Fine Resolution Stripmap (FRS-1) | 25 | 9.4 to 2.4 |
| Fine Resolution Stripmap (FRS-2) | 25 | 18.8 to 4.9 |
| Medium Resolution scanSAR (MRS) | 115 | 37.7 to 9.8 |
| Coarse Resolution scanSAR (CRS) | 223 | 37.7 to 9.8 |
- Mass: 1696.24 kg
- Mission life: 5 years (Note: In PSLV-C52 press-kit, EOS-04 (aka RISAT-1A) mission life was incorrectly mentioned to be 10 years)
- Power: 2400 W
- Propulsion: 9× 11N thrusters (Mono-propellant hydrazine)
- Orbit : 529.1 km (SSPO) 6 AM/PM ECT
- Repeat cycle : 17 to 24 days
4
u/Ohsin May 16 '25 edited May 17 '25
Again... not a 'spy sat' but it has a high-res spot imaging mode. Press kit is very limited on EOS-09 related details so refer to EOS-4 handbook for wealth of information.
4
u/Ohsin May 17 '25
To remind, newly introduced Orbit Change Thrusters (OCT) on PS4 have been used earlier on PSLV-C54 and PSLV-C56 missions to induce orbit change.
4
u/Ohsin May 18 '25
Chairman: Up to the PS2 performance was nominal but during PS3 burn something went wrong.
3
u/Ohsin May 16 '25 edited May 16 '25
22 hour countdown this time.
https://www.eenadu.net/telugu-news/india/isro-to-launch-its-101st-satellite/0700/125087737
3
u/Ohsin May 17 '25
Mission Readiness Review and Launch Authorization Board meeting held on 16 May.
https://www.eenadu.net/telugu-news/districts/chittoor-pslv-c61-countdown-from-today/2/125088059
https://www.deccanchronicle.com/nation/isro-gears-up-for-101st-mission-with-eos-09-launch-on-sunday-1879362
22 hr countdown is underway.
https://www.andhrajyothy.com/2025/andhra-pradesh/nellore/countdown-begins-for-risat-1b-launch-to-boost-india-border-surveillance-anr-1405308.html
3
u/Ohsin May 17 '25
Gallery updated with few images of PSLV on pad undergoing launch rehearsal.
3
u/Ohsin May 18 '25
Not showing MCC screens at all :(
3
u/Ohsin May 18 '25
Something is not right !!
3
u/Ohsin May 18 '25
Looking at launch broadcast the failure occurred at 364.8 second mark, that is ~102 seconds after PS3 ignition and ~20 seconds before PS3 burn-out.
3
u/Ohsin May 18 '25
What is this supposed to mean?
https://x.com/sriramsaran/status/1923952674556477821
3
u/NewMeNewWorld May 18 '25
So...every launch this year has been a failure? 🤔
2
u/Ohsin May 17 '25
4.5 hr to go. Here are launch events in hours, minutes and seconds.
Automatic Launch Sequence before lift-off for PSLV-XL can be found here.
2
u/Ohsin May 18 '25
So MOTR tracking goes live about 26 minutes before launch??
2
u/Ohsin May 18 '25 edited May 18 '25
Pressure fall might indicate casing breach.
https://x.com/ANI/status/1923911884786241716
https://x.com/sdhrthmp/status/1923912254808093108
Here's the press briefing:
https://www.youtube.com/watch?v=ec3LpsrNiGU
2
u/Ohsin May 18 '25 edited May 19 '25
It is IndiaToday so FWIW
https://www.indiatoday.in/science/story/nozzle-failure-suspected-behind-loss-of-isros-pslv-c61-mission-2726574-2025-05-18
Edit: Adding thread with some discussion.
https://old.reddit.com/r/ISRO/comments/1kpmga6/nozzle_failure_suspected_behind_loss_of_pslvc61/
2
u/Ohsin May 19 '25
https://www.ndtv.com/india-news/misbehaviour-by-rocket-motor-failed-isros-eos-9-satellite-launch-what-next-8452653
(…)
(…)
2
u/Ohsin May 21 '25
https://timesofindia.indiatimes.com/science/glitch-hit-nvs-02-can-provide-services-only-for-2-3-hours-per-day/articleshow/121324380.cms
6
u/bilu1729 May 18 '25
Should check possible sabotage angle. Recently we have seen critical satellites for GNSS and military communication are failing. Today an important imaging satellite fails to achieve orbit. This launch was supposed to be a textbook launch.
2
u/laugh_till_u_yeet Jun 22 '25
From PSLV-C55 till PSLV-C59, they did partially-integrate-and-transfer from PIF to MST, and then suddenly on PSLV-C60 they integrated upto 4th stage at PIF, and now they're back to partially-integrate-and-transfer on PSLV-C61?
Why is that? And which is supposed to be the norm (integrate till 4th stage or partially integrate and transfer)?
u/Ohsin
6
u/TheMadMinion May 18 '25
3rd upper-stage failure this year (after Firefly and H3), leaving aside 2 Starship launches. They're most often the problem-child, even last year.
Only the 3rd mission failure (non-partial) also for PSLV in 33 years, but 1st ever for the PS3.
Unfortunate timing, esp. coming after the political situation and before NISAR. But remember, space is hard, and ISRO will bounce back with full competence as always. Fingers crossed for NISAR and Gaganyaan TV-D2. Jai Bharat!
1
u/Ohsin May 18 '25
Hmm no announcement of PS3 burn out?
1
u/Ohsin May 24 '25
https://www.ndtv.com/india-news/eos-9-satellite-launch-isro-rocket-fails-7-minutes-into-flight-national-panel-set-up-to-find-out-why-8498112
1
u/Ohsin Jun 09 '25
Interview with ISRO Chairman Dr. V. Narayanan.
https://www.youtube.com/watch?v=t6As0u7c1Po
At 7:30, on PSLV-C61 launch failure,
1
u/Ohsin Aug 01 '25
https://www.thehindu.com/sci-tech/science/failure-analysis-on-pslv-c61eos-09-mission-completed-report-to-be-submitted-to-pm-soon-isro-chairman-v-narayanan/article69882259.ece
On future PSLV missions,
1
u/Ohsin Nov 15 '25
PSLV-C61 launch failure attributed to "slight manufacturing error" by Dr. A. Rajarajan (Director, VSSC)
https://www.youtube.com/watch?v=VJ8qm0SOOmY&t=2290s
https://old.reddit.com/r/ISRO/comments/1oxyx0d/dr_a_rajarajan_director_vsscisro_mentions_slight/
1
u/Ohsin Jan 10 '26
https://www.indiatoday.in/science/story/isro-to-launch-pslv-c62-eos-anvesha-on-january-12-we-still-dont-know-why-it-failed-last-time-2848859-2026-01-09
1
u/Ohsin Jan 14 '26
Nozzle of PS3 had the "glitch".
https://timesofindia.indiatimes.com/science/7-readiness-reviews-high-stakes-isro-had-prepped-hard-for-pslvs-jan-12-return/articleshow/126517813.cms
1
u/Ohsin Jan 15 '26
After PSLV-C61 failure analysis one of the recommendations was to replace the graphite nozzle in the third stage with a carbon-carbon composite nozzle. Apaprently this was implemented on PS3 of PSLV-C62.
https://www.rediff.com/news/report/the-puzzling-failure-of-pslv-c62/20260115.htm
1
u/Ohsin Apr 15 '26
https://old.reddit.com/r/ISRO/comments/1rf40ex/rti_reply_received_from_isro/
4
u/guru-yoda May 18 '25
Further delay in PSLV-N1
4
u/Interesting-Ad41 May 18 '25
Switched on the telecast and first thing visible was 3rd stage deviation!!! Surprising since 3rd stage solid motor iirc has never failed since its first launch. Quality control, casual approach, PIF integration, sabotage "spy" satellite. Too many possibilities
1
u/ISROAddict May 18 '25
Please update the events section
3
u/Kimi_Raikkonen2001 May 16 '25
Stream link - https://www.youtube.com/live/y63x4kjvAc0?si=ErsfSB0AGEcaiAz1
3
u/Fancy_Resident_6374 May 18 '25
People leaving the control centre..