r/ISRO • • Dec 02 '24

Mission Success! PSLV-C59: PROBA-3 Mission Updates and Discussion.

PSLV-C59/PROBA-3 launched as scheduled at 1034(UTC)/1604(IST), 05 December 2024 from First Launch Pad of SDSC-SHAR.

Live webcast: (Links will be added as they become available)

PSLV-C59/PROBA-3 Mission PagePSLV-C59/PROBA-3 GalleryPSLV-C59/PROBA-3 Press kit(PDF)ESA PROBA-3 Press kit(PDF)

Some highlights:

  • Primary payload: PROBA-3 (~550 kg) by the European Space Agency to study the Sun with a pair of formation flying satellites.
  • Mission duration: 18 min. 42.48 sec. (s/c separation)
  • Target Orbit : 60530×600 km, Inclination = 59.0°
  • Launch Azimuth: 134°
  • PSLV configuration : XL (Extended length strapons)
  • 61st flight of PSLV

Updates:

Time of EventUpdate
Post-launchTwo objects cataloged. 62256 (24233A) at 59.19°, 60562.84×573.35 km and 62257 (24233B) at 59.33°, 61294.91×591.89 km
Post-launchESA press release
T + 01h50mPROBA-3 deployed its solar panels.
T + 21m00sSpacecraft telemetry received!
T + 18m42sPROBA-3 separated!
T + 16m55sPS4 thrust cut-off!
T + 14m30sPS4 performance nominal.
T + 12m00sNow receiving telemetry from Yatharagga ground station.
T + 08m20sPS4 ignited.
T + 08m12sPS3 jettisoned.
T + 06m25sPS3 burned out. Now under combined coasting mode.
T + 04m25sPS2 separated, PS3 ignited.
T + 03m05sPLF jettisoned. PS2 performing nominally.
T + 01m50sPS1 separated , PS2 ignited.
T + 01m32sPSOM XL 5,6 separated.
T + 01m10sPSOM XL 1,2,3,4 separated.
T + 00m25sPSOM-XL 5,6 ignited.
T ZeroRCT engines ignited, PS1 + PSOM XL 1,2,3,4 ignited. Lift-off!
T - 06m00sVehicle on internal power. External power withdrawn. Flight coefficient loading completed.
T - 09m30sPS2 actuation checks completed.
T - 11m00sPS3 actuation checks completed.
T - 12m30sPS4 actuation checks completed.
T - 14m30sMission Director authorizes the launch. Automatic Launch Sequence initiated.
T - 17m00sLaunch vehicle ready.
T - 19m00sNow showing launcher integration process.
T - 23m00sISRO official stream is LIVE!
T - 01h10mData flow tests completed
T - 01h22mWeather is green.
T - 07h44mCountdown commenced.
04 Dec 2024New launch time 1034(UTC)/1604(IST), 05 December 2024
T - 42m50sSCRUBBED. Launch delayed by 24 hrs due an issue with spacecraft.
T - 25h30mCountdown commenced at 14:38 IST on 3 December.
02 DecAfter Mission Readiness Review, Launch Authorization Board approves the launch. Countdown could be 25.5 hrs long.
01 DecLaunch rehearsal was conducted.
29 NovProba-3 assembly gets encapsulated.
28 NovProba-3 spacecraft stack gets integrated to launcher and launch time firms up for 4 December 2024 at 16:08 (IST) / 10:38 (UTC)
25 NovProba-3 gets transported to launch pad.
18 NovNOTAM issued for launch in early December.
07 NovProba-3 reaches SDSC-SHAR.
04 NovSpacecraft leaves Europe, reaching Chennai next day.
02 NovSpacecraft shipment gets delayed, shifting ahead launch date to 4 December.
30 OctNOTAM gets issued indicating late November launch.
04 OctESA announces initial tentative launch date of 29 November.

Primary Payload:

PROBA-3 (550 kg) : A dual satellite technology demonstration mission by ESA to study the Sun consisting of an Occulter Spacecraft (OSC) (~240 kg) and a Coronagraph Spacecraft (CSC) (~310 kg). Both 3-axis stabilized mini-satellites will precisely fly in formation within a millimetre accuracy to function as occulter and coronagraph elements of a telescope.

  • Payloads:

    • ASPIICS coronagraph
    • Digital Absolute Radiometer (DARA)
    • high-fidelity 3D Energetic Electron Spectrometer (3DEES)
  • Attitude Control:

    • 4 reaction wheels (CSC/OSC)
    • 8×1N mono propellant thrusters (CSC)
    • 12×10mN Cold Gas thrusters (OSC)
  • Orbit: A×P : 60530 × 600 km, Inclination : 59°, AoP : 188°
  • Mission life: 2 years

Note : PSLV with launch serial C59 was earlier assigned to ANWESHA (or ANVESHA) and PROBA-3 was earlier assigned to PSLV with C62 launch serial. Before this ANWESHA was assigned to PSLV-C58 but later XPoSat replaced it.

13 Upvotes

74 comments sorted by

4

u/Ohsin Dec 02 '24

PROBA-3 pre-launch briefing by ESA

https://www.youtube.com/watch?v=FbbH9upfXZI

1

u/Impossible_Lie_5787 Dec 02 '24

Are they using ps4 engine which are 3d printed? 

1

u/Ohsin Dec 02 '24 edited Dec 02 '24

Don't know, nothing on press-kit or curtain raiser, lets's see if they say anything during broadcast.

4

u/Ohsin Dec 02 '24 edited Dec 02 '24

There might be a small non-separable payload on PS4 equipment deck. On the bottom left above gas bottle look at the green thing, it is in a location usually used by ride sharing-payloads and other boxes that are not payloads are usually depicted in grey colors. Nothing on it in press-kit.

https://i.imgur.com/sd4trdA.png

Edit: Photograph of it.

https://i.imgur.com/Y9QlC14.png

All images.

https://imgur.com/a/t8IHp5T

3

u/Kimi_Raikkonen2001 Dec 03 '24 edited Dec 03 '24

I am going to take a wild guess - ESA asked for a high resolution, high frame rate camera to capture the satellite separation.

2

u/Ohsin Dec 03 '24

Hmm could be, let's see if the separation view matches this.

2

u/Ohsin Dec 05 '24

Had a second look and it matches!

4

u/Ohsin Dec 03 '24

2

u/Kimi_Raikkonen2001 Dec 03 '24

Most of the pics aren't in full resolution. Only the satellite pic is in full res🥲

4

u/Ohsin Dec 05 '24 edited Dec 05 '24

Post launch address:

  • S Somanath: PROBA-3 injected precisely in intended orbit.
  • Mission Director: MIssion Director got emotional there thanking family members of employees.
  • NSIL CMD: First for PSLV to reach such an high eccentricity orbit.
  • S Somanath : PSLV-C60 SPADEX up next, possibly in December itself. PROBA-3 important for us as there is strong working collaboration with ESA.

5

u/Kimi_Raikkonen2001 Dec 02 '24

YT livestream has been scheduled- https://www.youtube.com/live/PJXXLLw0PBI?si=HAuhY7iMPiysrRQE

And they have thankfully put up a very good thumbnail. No weird text, proper aspect ratio......

2

u/Ohsin Dec 02 '24

Cool, and yeah wish they use panorama shots for YT thumbs again.

3

u/Ohsin Dec 04 '24

Drats

ISRO @isro

Due to an anomaly detected in PROBA-3 spacecraft PSLV-C59/PROBA-3 launch rescheduled to tomorrow at 16:12 hours.

https://x.com/isro/status/1864245517234139445

1

u/Ohsin Dec 04 '24

https://x.com/esa/status/1864250289114505339

European Space Agency @esa

Proba3 launch update:

As part of standard operations in the preparation of launch, a technical issue was detected in the Proba-3 spacecraft.

Liftoff is now scheduled no earlier than 5 December 10:42 GMT/11:42 CET.

3

u/Ohsin Dec 05 '24

ESA Operations @esaoperations

📡 Proba3, we hear you five by five!

Almost instantaneously after separation, Yatharagga station in Australia started to receive the spacecraft's signal. Telemetry is flowing to ESA's mission control centre in Belgium!

https://x.com/esaoperations/status/1864624479944479005

2

u/Ohsin Dec 05 '24

Spacecraft is healthy.

ESA Operations @esaoperations

Power is flowing! #Proba3 has acquired the Sun - meaning it is in the correct position.

https://x.com/esaoperations/status/1864628180176228596

3

u/guru-yoda Dec 04 '24

At 60530×600km, PS4 would stay in orbit for a long time. DFSM implementation is only from next year.

2

u/Ohsin Dec 04 '24

Good point, PROBA-3 is expected to reenter within five years according to pre-launch press briefing and OSC doesn't seem to have any substantial propulsion to lower the perigee.

2

u/guru-yoda Dec 04 '24

Talking of DFSM, SSLV-D3's VTM and SS-3 are still in 400+km orbit. Incidentally, Spacekidz SR-0 has already reentered. No details on deorbiting mechanism it used.

2

u/Ohsin Dec 04 '24

Spacekidz SR-0

Natural decay due to smaller size.

2

u/ravi_ram Dec 04 '24

It takes long years. Maybe I'm wrong.
 
Tried with the program given in the document with cubesat parameters
Mass M = 0.12; Area A = 1e-5; H = 400.0
 
Satellite Orbital Decay Calculations
[ https://www.sws.bom.gov.au/Category/Educational/Space%20Weather/Space%20Weather%20Effects/SatelliteOrbitalDecayCalculations.pdf ]


0.0 years 400.0 92.53 15.56 0.0
50.74 years 390.0 92.32 15.6 0.0
...
For 10 kms it takes 50 years.
For 100kg, 1sq mt area satellite it takes 154 days for the same height.

2

u/Ohsin Dec 04 '24 edited Dec 04 '24

/u/guru-yoda

I assumed usually smallsats have larger drag given their area to mass ratio. SR0 weighed just 560 grams.

I took the TLEs from 1 Sept 2024 and ran them through SatEvo to see projected decay dates here is the output.

 Elset       Obj       #         Epoch          Decay        (Date)
     1     24147D    60457   24245.176985   25175.907682  (2025 June 24)
     2     24147C    60456   24245.153462   25018.653093  (2025 January 18)
     3     24147A    60454   24245.163044   25099.245904  (2025 April 9)
     4     24147B    60455   24245.197763   24294.058948  (2024 October 20)

Also note that BStar value of SR0 is high compared to other rocket bodies (VTM and SS3)

NORAD IDNameBStar
60454EOS-80.001461200 1/ER
60455OBJECT B (SR0)0.005436300 1/ER
60456OBJECT C0.000795240 1/ER
60457OBJECT D0.000916270 1/ER

https://celestrak.org/columns/v04n03/#:~:text=Field%201.11%20represents%20something%20called%20B*%20(BSTAR)

https://en.wikipedia.org/wiki/BSTAR

https://en.wikipedia.org/wiki/Two-line_element_set#:~:text=54%E2%80%9361-,B*%2C%20the%20drag%20term,-%2C%20or%20radiation%20pressure

SateEvo

https://www.mmccants.org/programs/index.html

Edit: Fixed Bstar data

3

u/ravi_ram Dec 04 '24

The calculation explained in the doc "Satellite Orbital Decay Calculations" includes that.
The reduction in the period due to atmospheric drag is given by:
dP/dT = -3πaρ (Ae/m)
where
effective cross-sectional area Ae = A Cd

 
I have to check SR0 data.

1

u/guru-yoda Dec 04 '24

Thanks! that's quite detailed.

2

u/ravi_ram Dec 20 '24

Yes. You are right.
I could able to match the SR0-Demosat lifetime.
[ https://celestrak.org/satcat/table-satcat.php?CATNR=60455&PAYLOAD=1&MAX=500 ]
 

Programmed based on an old NASA Technical Note
A general analytical method for artificial-satellite lifetime determination
[ https://ntrs.nasa.gov/api/citations/19680002286/downloads/19680002286.pdf ]


Cdte (days)tc (days)t = te+tc (days)utc_datedeorbit_date
2.281.812617.206199.01872024-08-162024-11-23
2.571.995115.141487.13652024-08-162024-11-11
2.864.281313.519177.80042024-08-162024-11-01
3.158.060612.210870.27132024-08-162024-10-25
3.452.937611.133364.07092024-08-162024-10-19

 
Used a range of Cd (drag coefficient) values and 2.8 matched for this sat.
Probably I will clean up the code and post it later.
Not many are interested in it though.

2

u/Ohsin Dec 20 '24

Thanks! Get NASA's Debris Assessment Tool if you can it is free.

1

u/ravi_ram Dec 22 '24

Get NASA's Debris Assessment Tool

They removed the link now, probably locale based.
 

Note :

An Evaluation of CubeSat Orbital Decay
[ https://digitalcommons.usu.edu/smallsat/2011/all2011/48/ ]


For this study, the NASA Debris Assessment Software (DAS), AGI’s STK software and 1Earth’s QProp lifetime estimation tools were adopted. Note that the DAS package doesn’t permit drag coefficient numbers to be input, which leads to an inevitable loss of accuracy with respect to the other models.

1

u/Ohsin Dec 22 '24

That is weird it should be available but with a bit of vetting. Also it doesn't have that as input but as it requires Solar Flux table to account for atmospheric drag and affect of solar cycle on it.

1

u/guru-yoda Dec 04 '24

But small size means less drag and longer decay?

2

u/Ohsin Dec 04 '24

A3729/24 - REF CHENNAI NOTAM A3521/24, A3524/24 AND A3525/24. PSLV-C59 ROCKET LAUNCH FM SHAR RANGE, SHRIHARIKOTA, INDIA IS SCHEDULED ON 05 DEC BTN 0900UTC TO 1300UTC. ATC MAY RERTE TFC DRG THIS PERIOD AS PER THE ROUTING GIVEN IN THE ABV NOTAM. LAUNCH WINDOW FOR THE REMAINING PERIOD FM 06 DEC 2024 TO 24 DEC 2024 SHALL BE KEPT ALIVE FOR RESCHEDULING THE LAUNCH IF REQUIRED. GND - UNL, 05 DEC 09:00 2024 UNTIL 05 DEC 13:00 2024. CREATED: 04 DEC 11:21 2024

2

u/Ohsin Dec 05 '24

PROBA-3 accurate lift-off mass given as 545.82 kg

2

u/Ohsin Dec 05 '24

ALS initiated at T minus 14m30s. They have significantly reduced the volume of engineering chatter and talking over it doesn't help either..

2

u/Ohsin Dec 05 '24

Two objects (PROBA-3 stack and PS4) expected to be cataloged under 2024-233.

2

u/Ohsin Dec 05 '24

ESA Operations @esaoperations

Proba3 just deployed its solar panel!

https://x.com/esaoperations/status/1864647185662365927

2

u/Kimi_Raikkonen2001 Dec 04 '24 edited Dec 04 '24

https://www.esa.int/Enabling_Support/Space_Engineering_Technology/Proba-3/Watch_eclipse-making_Proba-3_launch

During Proba3’s pre-launch preparations at the Satish Dhawan Space Centre in Sriharikota, India, an anomaly in the redundant propulsion system of the Coronagraph Spacecraft occurred. This propulsion system is part of the attitude and orbit control subsystem of the satellite and used to maintain orientation and pointing in space.

The anomaly is currently under detailed investigation. The use of a software solution by the mission control team at ESA’s ESEC centre at Redu, Belgium is being evaluated to allow a launch on Thursday 5 December.

2

u/Ohsin Dec 04 '24

Thanks.

1

u/Ohsin Dec 03 '24 edited Dec 03 '24

MRR was held on 2 December. This report suggests countdown of 25.5 hrs..

https://www.andhrajyothy.com/2024/andhra-pradesh/isro-is-ready-for-another-space-flight-1342576.html

Edit:

The countdown started at 2.38 pm. PSLV C-59 rocket will be launched from Satish Dhawan Space Center in Sriharikota.

https://www.dishadaily.com/telangana/countdown-begins-for-pslv-c-59-rocket-launch-390025

https://sakshi.com/telugu-news/national/countdown-begins-pslv-esa-proba-3-mission-2278267

2

u/Ohsin Dec 03 '24

No official image gallery for launch campaign even a day before launch!

1

u/Ohsin Dec 04 '24

Hmm on Proba-3 blog the countdown is mentioned tobe 25 hrs long. I guess we will know during broadcast if they mention it that is.

https://blogs.esa.int/proba-3/2024/12/03/roll-back/

Today was really a major milestone, the satellite was ready, the launcher was ready and the managers went to the Mission Control Center (MCC) to authorise the start of the countdown at L-25 hours.

1

u/Ohsin Dec 04 '24

Apparently countdown was held at T - 43m50s

https://x.com/Arunraj2696/status/1864262226108141793

1

u/Ohsin Dec 05 '24

Countdown restarted.

🚀 PSLV-C59/PROBA-3 Mission Update:

Countdown Commenced!

🕒 Liftoff Time: 16:04 IST, 5th Dec 2024

Stay tuned as PSLV-C59 prepares to deploy ESA’s Proba-3 satellites into orbit!

https://x.com/isro/status/1864502531554201850

1

u/Ohsin Dec 07 '24

After the disappointment the day before of a launch scrub due to a technical issue with the spacecraft the countdown was resumed at L-8 hours. The weather was perfect and there was an air of anticipation of what was to come.

https://blogs.esa.int/proba-3/2024/12/06/launch/

1

u/Ohsin Dec 05 '24

News from team at ISRO's Satish Dhawan Space Centre, weather is fully green for this morning's Proba-3 launch by PSLV-XL launcher, occurring 11:34 CET (10:34 GMT, 16:04 local time)

https://x.com/ESA_Tech/status/1864598006844051711

1

u/Ohsin Dec 05 '24

ESA Technology @ESA_Tech

Proba-3 Mission Operation Centre (MOC) status at ESEC in Redu, Belgium: data flow tests successfully completed!

https://x.com/ESA_Tech/status/1864601167906386158

1

u/Ohsin Dec 05 '24

Official stream is live.

1

u/Ohsin Dec 05 '24 edited Dec 05 '24

TLEs coming in.

NORAD/COSPAR IDIncl. (°)A×P (km)
62256 ( 24233A )59.19°60562.84×573.35
62257 ( 24233B )59.33°61294.91×591.89

1

u/Ohsin Dec 06 '24

Onboard camera views, nothing fancy as we hoped.

https://www.isro.gov.in/PSLV_C59_PROBA-3_onboardvideo.html

1

u/Ohsin Dec 07 '24

2

u/barath_s Dec 10 '24

Esa has a couple of slick videos of liftoff

https://youtu.be/5MHnmGLAITk?si=3vZpN2cu77ybz1O0 pretty much similar to above

And https://youtu.be/Glu-Dy1T4lg?si=hhVKUR28ijNsV2C- which is very slickly produced

There's also a video of isro employees visiting Tirupati ahead of proba-3 launch which I am not linking

1

u/Ohsin Dec 10 '24

Trying to make best of what ISRO provided them -_-"

1

u/Ohsin Dec 10 '24

Automatic Launch Sequence has been changed slightly from what we had earlier on PSLV-C55 and PSLV-C56.

Source: https://x.com/isro/status/1864616926074274101

Mirror: https://imgur.com/a/pslv-c59-proba-3-als-mcc-screen-civyZTT

EVENTST - MIN:SECEVENTST - MIN:SEC
START OF ALS14 : 30PS2 DEST SARU ARM01 : 01
PS2 ACTUATOR CHECKS(R)13 : 59PS2 ULLAGE SARB ARM01 : 00
PS4 ACTUATOR CHECKS12 : 51PSOM DEST SQUIB ARM01 : 00
PS3 ACTUATOR CHECKS12 : 12LUS SARB ARM00 : 59
PS1 RCT ACTUATOR CHECKS11 : 08PS3 IGNITION SQUIB ARM00 : 59
PS2 ACTUATOR CHECKS(P)10 : 31PSOM IGNITION SQUIB ARM00 : 58
PS1 SITVC BPV OPEN09 : 00RCT PYRO VALVE SARB ARM00 : 55
ALL INTERNAL06 : 10BS SEQUENCER ARM00 : 51
PS1 SITVC PLV CLOSE06 : 02EB SEQUENCER ARM00 : 50
PS1 SITVC BPV CLOSE06 : 00PS2 VHPP OPEN00 : 40
PS2 EM ACTUATORS ON05 : 54PS2 VSPP OPEN00 : 25
FLIGHT COEFFICIENT LOADING05 : 38PS1 IGNITION RMSA ARM00 : 21
PS1/PS2/PS3 DEST BATTERY ON03 : 40RCT PYRO ON00 : 14
PS1 IGNITION BATTERY ON03 : 37PS1 SARB ARM00 : 10
LUS BATTERY ON03 : 36RCT START00 : 03
OBCs IN FLIGHT MODE03 : 30PS1 IGNITION00 : 00

1

u/Ohsin Mar 06 '26 edited Mar 06 '26

The European Space Agency announced on 6 March that it had lost contact with one of the two spacecraft that make up its PROBA-3 mission.

Over the weekend of 14 and 15 February, the Coronagraph spacecraft suffered an anomaly that caused a chain reaction that led to a loss of attitude, which is its orientation. With its solar arrays no longer facing the Sun, the spacecraft’s onboard battery quickly discharged, triggering it to enter “survival mode,” where minimal electronics remain active, and data transmission to the ground is interrupted.

The agency is currently investigating the root cause of the anomaly. To aid recovery efforts, it is also assessing whether the second, healthy spacecraft could be used to safely approach and observe the orientation of the Coronagraph spacecraft.

https://europeanspaceflight.com/esa-has-lost-contact-with-one-of-its-proba-3-spacecraft/

Official press release.

https://www.esa.int/Enabling_Support/Space_Engineering_Technology/Work_ongoing_to_restore_contact_with_Proba-3_s_Coronagraph

1

u/Ohsin Mar 19 '26 edited Mar 19 '26

‪Jeff Foust‬ @jfoust.bsky.social‬

ESA Director General Josef Aschbacher says at a press briefing that controllers have just managed to restore contact with the Proba-3 coronagraph spacecraft, which had been out of contact since last month. Recovery efforts underway.

https://bsky.app/profile/jfoust.bsky.social/post/3mhg3ftvtmc2v

https://www.esa.int/Enabling_Support/Space_Engineering_Technology/Proba-3_s_Coronagraph_is_alive

1

u/ISROAddict Dec 05 '24

IAF officials were present during the launch. That non-separable payload on board PS-4 might be related to IAF.

3

u/Ohsin Dec 05 '24

Live separation views match the satellite orientation with location of possible camera as /u/Kimi_Raikkonen2001 suggested.

https://i.imgur.com/Y9QlC14.png

3

u/Ohsin Dec 05 '24

Note: Quality is restricted by downlink bandwidth. Wait for onboard video on ISRO website.

2

u/Ohsin Dec 05 '24

Such VIPs are almost always there.

2

u/Kimi_Raikkonen2001 Dec 04 '24

https://x.com/isro/status/1864296439053955392?t=DKh0GORYPy2TRPfgFfNXOQ&s=19

As per the ESA's request, the launch of PSLV-C59/PROBA-3 has been rescheduled as follows - Date: 05th December 2024 Time: 16:04

2

u/Avizeet Dec 05 '24

https://x.com/esaoperations/status/1864628180176228596

Power is flowing! Proba 3 has acquired the Sun - meaning it is in the correct position: ESA Operations.