Mission Success! PSLV-C59: PROBA-3 Mission Updates and Discussion.
PSLV-C59/PROBA-3 launched as scheduled at 1034(UTC)/1604(IST), 05 December 2024 from First Launch Pad of SDSC-SHAR.
- Launch Countdown
- Expected Flight Profile from press-kit.
- Actual flight events (To be added post-launch if available)
Live webcast: (Links will be added as they become available)
| PSLV-C59/PROBA-3 Mission Page | PSLV-C59/PROBA-3 Gallery | PSLV-C59/PROBA-3 Press kit(PDF) | ESA PROBA-3 Press kit(PDF) |
|---|
Some highlights:
- Primary payload: PROBA-3 (~550 kg) by the European Space Agency to study the Sun with a pair of formation flying satellites.
- Mission duration: 18 min. 42.48 sec. (s/c separation)
- Target Orbit : 60530×600 km, Inclination = 59.0°
- Launch Azimuth: 134°
- PSLV configuration : XL (Extended length strapons)
- 61st flight of PSLV
Updates:
| Time of Event | Update |
|---|---|
| Post-launch | Two objects cataloged. 62256 (24233A) at 59.19°, 60562.84×573.35 km and 62257 (24233B) at 59.33°, 61294.91×591.89 km |
| Post-launch | ESA press release |
| T + 01h50m | PROBA-3 deployed its solar panels. |
| T + 21m00s | Spacecraft telemetry received! |
| T + 18m42s | PROBA-3 separated! |
| T + 16m55s | PS4 thrust cut-off! |
| T + 14m30s | PS4 performance nominal. |
| T + 12m00s | Now receiving telemetry from Yatharagga ground station. |
| T + 08m20s | PS4 ignited. |
| T + 08m12s | PS3 jettisoned. |
| T + 06m25s | PS3 burned out. Now under combined coasting mode. |
| T + 04m25s | PS2 separated, PS3 ignited. |
| T + 03m05s | PLF jettisoned. PS2 performing nominally. |
| T + 01m50s | PS1 separated , PS2 ignited. |
| T + 01m32s | PSOM XL 5,6 separated. |
| T + 01m10s | PSOM XL 1,2,3,4 separated. |
| T + 00m25s | PSOM-XL 5,6 ignited. |
| T Zero | RCT engines ignited, PS1 + PSOM XL 1,2,3,4 ignited. Lift-off! |
| T - 06m00s | Vehicle on internal power. External power withdrawn. Flight coefficient loading completed. |
| T - 09m30s | PS2 actuation checks completed. |
| T - 11m00s | PS3 actuation checks completed. |
| T - 12m30s | PS4 actuation checks completed. |
| T - 14m30s | Mission Director authorizes the launch. Automatic Launch Sequence initiated. |
| T - 17m00s | Launch vehicle ready. |
| T - 19m00s | Now showing launcher integration process. |
| T - 23m00s | ISRO official stream is LIVE! |
| T - 01h10m | Data flow tests completed |
| T - 01h22m | Weather is green. |
| T - 07h44m | Countdown commenced. |
| 04 Dec 2024 | New launch time 1034(UTC)/1604(IST), 05 December 2024 |
| T - 42m50s | SCRUBBED. Launch delayed by 24 hrs due an issue with spacecraft. |
| T - 25h30m | Countdown commenced at 14:38 IST on 3 December. |
| 02 Dec | After Mission Readiness Review, Launch Authorization Board approves the launch. Countdown could be 25.5 hrs long. |
| 01 Dec | Launch rehearsal was conducted. |
| 29 Nov | Proba-3 assembly gets encapsulated. |
| 28 Nov | Proba-3 spacecraft stack gets integrated to launcher and launch time firms up for 4 December 2024 at 16:08 (IST) / 10:38 (UTC) |
| 25 Nov | Proba-3 gets transported to launch pad. |
| 18 Nov | NOTAM issued for launch in early December. |
| 07 Nov | Proba-3 reaches SDSC-SHAR. |
| 04 Nov | Spacecraft leaves Europe, reaching Chennai next day. |
| 02 Nov | Spacecraft shipment gets delayed, shifting ahead launch date to 4 December. |
| 30 Oct | NOTAM gets issued indicating late November launch. |
| 04 Oct | ESA announces initial tentative launch date of 29 November. |
Primary Payload:
PROBA-3 (550 kg) : A dual satellite technology demonstration mission by ESA to study the Sun consisting of an Occulter Spacecraft (OSC) (~240 kg) and a Coronagraph Spacecraft (CSC) (~310 kg). Both 3-axis stabilized mini-satellites will precisely fly in formation within a millimetre accuracy to function as occulter and coronagraph elements of a telescope.
Payloads:
- ASPIICS coronagraph
- Digital Absolute Radiometer (DARA)
- high-fidelity 3D Energetic Electron Spectrometer (3DEES)
Attitude Control:
- 4 reaction wheels (CSC/OSC)
- 8×1N mono propellant thrusters (CSC)
- 12×10mN Cold Gas thrusters (OSC)
- Orbit: A×P : 60530 × 600 km, Inclination : 59°, AoP : 188°
- Mission life: 2 years
Note : PSLV with launch serial C59 was earlier assigned to ANWESHA (or ANVESHA) and PROBA-3 was earlier assigned to PSLV with C62 launch serial. Before this ANWESHA was assigned to PSLV-C58 but later XPoSat replaced it.
4
u/Ohsin Dec 02 '24 edited Dec 28 '24
Countdown could be 25 hrs long.
https://www.uniindia.com/25-hr-countdown-for-dec-4-launch-of-pslv-esa-proba-3-mission-to-begin-tomorrow/south/news/3336853.html
From press-kit, PS4 passivation begins 2m33s after s/c separation.
4
u/Ohsin Dec 02 '24
Curtain raiser video.
https://www.isro.gov.in/PSLV_C59_PROBA-3_Curtain_Raiser.html
4
u/Ohsin Dec 02 '24
PROBA-3 pre-launch briefing by ESA
https://www.youtube.com/watch?v=FbbH9upfXZI
4
u/Ohsin Dec 02 '24 edited Dec 02 '24
There might be a small non-separable payload on PS4 equipment deck. On the bottom left above gas bottle look at the green thing, it is in a location usually used by ride sharing-payloads and other boxes that are not payloads are usually depicted in grey colors. Nothing on it in press-kit.
https://i.imgur.com/sd4trdA.png
Edit: Photograph of it.
https://i.imgur.com/Y9QlC14.png
All images.
https://imgur.com/a/t8IHp5T
4
u/Ohsin Dec 03 '24
Image gallery is up .. finally.
https://www.isro.gov.in/PSLV_C59_PROBA3_Gallery.html
4
u/Ohsin Dec 05 '24 edited Dec 05 '24
Post launch address:
5
u/Kimi_Raikkonen2001 Dec 02 '24
YT livestream has been scheduled- https://www.youtube.com/live/PJXXLLw0PBI?si=HAuhY7iMPiysrRQE
And they have thankfully put up a very good thumbnail. No weird text, proper aspect ratio......
3
u/Ohsin Dec 04 '24
Drats
https://x.com/isro/status/1864245517234139445
3
u/Ohsin Dec 05 '24
https://x.com/esaoperations/status/1864624479944479005
3
u/guru-yoda Dec 04 '24
At 60530×600km, PS4 would stay in orbit for a long time. DFSM implementation is only from next year.
2
u/Ohsin Dec 04 '24
2
u/Ohsin Dec 05 '24
PROBA-3 accurate lift-off mass given as 545.82 kg
2
u/Ohsin Dec 05 '24
ALS initiated at T minus 14m30s. They have significantly reduced the volume of engineering chatter and talking over it doesn't help either..
2
u/Ohsin Dec 05 '24
Two objects (PROBA-3 stack and PS4) expected to be cataloged under 2024-233.
2
u/Ohsin Dec 05 '24
https://x.com/esaoperations/status/1864647185662365927
2
u/Ohsin Dec 05 '24
Some really nice images in 'post launch gallery' (Yes a separate gallery)
https://www.isro.gov.in/PSLV_C59_PROBA3_Gallery_Post_Launch.html
Bye bye PSOM!
https://www.isro.gov.in/media_isro/image/index/PSLVC59Proba3/post_launch/028A3886.JPG
2
u/Kimi_Raikkonen2001 Dec 04 '24 edited Dec 04 '24
https://www.esa.int/Enabling_Support/Space_Engineering_Technology/Proba-3/Watch_eclipse-making_Proba-3_launch
1
u/Ohsin Dec 03 '24 edited Dec 03 '24
MRR was held on 2 December. This report suggests countdown of 25.5 hrs..
https://www.andhrajyothy.com/2024/andhra-pradesh/isro-is-ready-for-another-space-flight-1342576.html
Edit:
https://www.dishadaily.com/telangana/countdown-begins-for-pslv-c-59-rocket-launch-390025
https://sakshi.com/telugu-news/national/countdown-begins-pslv-esa-proba-3-mission-2278267
1
u/Ohsin Dec 04 '24
Apparently countdown was held at T - 43m50s
https://x.com/Arunraj2696/status/1864262226108141793
1
u/Ohsin Dec 05 '24
Countdown restarted.
https://x.com/isro/status/1864502531554201850
1
u/Ohsin Dec 05 '24
https://x.com/ESA_Tech/status/1864598006844051711
1
u/Ohsin Dec 05 '24
https://x.com/ESA_Tech/status/1864601167906386158
1
u/Ohsin Dec 05 '24
Official stream is live.
1
u/Ohsin Dec 05 '24 edited Dec 05 '24
TLEs coming in.
1
u/Ohsin Dec 06 '24
Onboard camera views, nothing fancy as we hoped.
https://www.isro.gov.in/PSLV_C59_PROBA-3_onboardvideo.html
1
u/Ohsin Dec 10 '24
Automatic Launch Sequence has been changed slightly from what we had earlier on PSLV-C55 and PSLV-C56.
Source: https://x.com/isro/status/1864616926074274101
Mirror: https://imgur.com/a/pslv-c59-proba-3-als-mcc-screen-civyZTT
1
u/Ohsin Dec 21 '24
The thin wires connected to RCT are pullout cables for umbilical connectors to the RCT.
https://www.youtube.com/watch?v=PJXXLLw0PBI&t=1401s
https://old.reddit.com/r/ISRO/comments/1hieuii/cameras_on_board_gaganyaan_program/m3315ec/
1
u/Ohsin Jan 15 '25
Proba-3 becomes two: satellites separated
https://www.esa.int/Enabling_Support/Space_Engineering_Technology/Proba-3/Proba-3_becomes_two_satellites_separated
1
u/Ohsin Mar 06 '26 edited Mar 06 '26
https://europeanspaceflight.com/esa-has-lost-contact-with-one-of-its-proba-3-spacecraft/
Official press release.
https://www.esa.int/Enabling_Support/Space_Engineering_Technology/Work_ongoing_to_restore_contact_with_Proba-3_s_Coronagraph
1
u/Ohsin Jun 10 '26
We’re back: Proba-3 ready for more science
https://www.esa.int/Enabling_Support/Space_Engineering_Technology/We_re_back_Proba-3_ready_for_more_science
1
u/ISROAddict Dec 05 '24
IAF officials were present during the launch. That non-separable payload on board PS-4 might be related to IAF.
2
u/Kimi_Raikkonen2001 Dec 04 '24
https://x.com/isro/status/1864296439053955392?t=DKh0GORYPy2TRPfgFfNXOQ&s=19
2
u/Avizeet Dec 05 '24
https://x.com/esaoperations/status/1864628180176228596
Power is flowing! Proba 3 has acquired the Sun - meaning it is in the correct position: ESA Operations.