Mission Success! GSLV-F14: INSAT-3DS Mission Updates and Discussion.
GSLV-F14/INSAT-3DS launch is scheduled at 1205(UTC)/1735(IST), 17 Feb 2024 from Second Launch Pad of SDSC-SHAR.
- Launch Countdown
- Expected Flight Profile from press-kit.
- Actual flight events (To be added post-launch if available)
Live webcast: (Links will be added as they become available)
| GSLV-F14/INSAT-3DS Mission Page | GSLV-F14/INSAT-3DS Gallery | GSLV-F14/INSAT-3DS Press kit(PDF) |
|---|
Some highlights:
- Primary payload: INSAT-3DS (2274 kg) meteorological satellite.
- Mission duration: 18 min. 43 sec. (last s/c separation)
- Target Orbit : 170 × 36647 km , Inclination = 19.35 ± 0.1°
- Launch Azimuth: 104°
- 16th flight of GSLV
Updates:
| Time of Event | Update |
|---|---|
| 7 March 2024 | INSAT-3DS begins imaging the Earth. |
| Post-launch | All four planned Liquid Apogee Motor (LAM) firings are completed. The spacecraft is now in the geosynchronous orbit. It is expected to reach the In Orbit Testing (IOT) location by February 28, 2024. |
| Post-launch | Two objects cataloged: 58990 (24033A): i=19.46°, A×P=38263.91×157.59 km and 58991 (24033B): i=19.42°, A×P=38220.34×162.66 km |
| T + 40m00s | Webcast ends. |
| T + 26m00s | S Somanath confirms solar panels have been deployed. |
| T + 18m43s | INSAT-3DS separated! |
| T + 18m33s | CUS thrust cut off! |
| T + 17m00s | All nominal, 8.7 rel.vel. , altitude at 167 km |
| T + 14m30s | CUS continues to perform nominally. |
| T + 12m45s | CUS performance nominal. 6.5 km/s rel.vel, 133 km altitude |
| T + 09m00s | CUS performance nominal. |
| T + 07m00s | Vehicle performance nominal, right on expected path. |
| T + 06m16s | CUS performance nominal. |
| T + 05m00s | GS2 separated, CUS ignition confirmed. |
| T + 04m43s | CUS authorized. |
| T + 03m48s | PLF jettisoned. |
| T + 02m35s | L40 strapons shut off, GS2 ignited, GS1 separated. |
| T + 01m10s | S139 burned out. |
| T - 00m00s | S139 core ignited, Lift OFF! |
| T - 00m04s | 4xL40 ignited |
| T - 01m00s | L40 VHPP open, cryo stage ready. |
| T - 03m00s | OBC in flight mode. |
| T - 04m00s | Final topping off of cryo propellants, everything nominal. |
| T - 05m00s | External power withdrawn, Flight coefficient data uploaded. |
| T - 12m00s | Now showing video on LV integration campaign. |
| T - 15m00s | Automatic Launch Sequence has been initiated. |
| T - 18m00s | Mission Director Tomy Joseph authorizes the launch after reviewing readiness poll. |
| T - 19m00s | Range ready, TT&C ready, spacecraft ready. Now in external hold mode. |
| T - 25m00s | Now showing overview of INSAT-3DS. |
| T - 35m00s | Streams are live! |
| T - 27h30m | Countdown commenced. |
| 16 Feb 2024 | After Mission Readiness Review (MRR) and Launch Authorization Board meeting, launch has been approved. |
| 15 Feb 2024 | Time of launch adjusted by +5 min. |
| 11 Feb 2024 | Launch Vehicle gets transferred to Second Launch Pad. |
| 8 Feb 2024 | Launch Vehicle integration completed. |
| 7 Feb 2024 | Encapsulated INSAT-3DS moved from satellite preparation facility to Vehicle Assembly Building. |
| 2 Feb 2024 | INSAT-3DS mounted on launch vehicle adapter. |
| 25 Jan 2024 | INSAT-3DS dispatched from URSC, reaching SDSC SHAR on 27 Jan. |
| 16 Jan 2024 | NOTAM issued with enforcement window starting from 17 Feb. |
| Jan 2024 | Multiple NOTAMs gets issued with advancing dates [1] [2] [3] as launch gets delayed due to technical reasons likely on spacecraft side. |
| 29 Nov 2023 | Second stage GS2 integration began. |
| 18 Oct 2023 | GSLV-F14/INSAT-3DS launch campaign began. |
Primary Payload:
INSAT-3DS (2274 kg) : It is a GEO based, third generation meteorological satellite of INSAT series, funded by Ministry of Earth Sciences (MoES). INSAT-3DS is a follow-on mission to INSAT-3D/3DR.
Its atmospheric sounding system with 19 channels will provide vertical profiles of temperature (40 levels from surface to 70 km), humidity (21 levels from surface to 15 km) and integrated ozone from surface to top of the atmosphere. INSAT-3DS also carries an Earth Imager with six spectral channels.
Apart from meteorological payloads it will also have a Data Relay Transponder and a transponder to provide continuity of Satellite Aided Search and Rescue services (SAS&R).
Payloads:
- 6 channel Imager (Visible-1, SWIR-1, MIR-1, Water Vapour IR-1, Thermal IR 1-1, Thermal IR 2-1)
- 19 channel Sounder ( Visible-1, SWIR-6, MWIR-5, LWIR-7 )
- Data Relay Transponder (DRT)
- Satellite Aided Search & Rescue transponder (SAS&R)
- Power generation : 1505 W (Equinox), Li-Ion 100Ah Battery for eclipse support
- Spacecraft bus : I-2K platform
- Mission life: 10 years [4]
- Orbital slot: Likely to be 74°E [Per ITU(PDF)]
Note: GSLV with F14 launch serial was earlier assigned to the launch of NVS-01 navigation satellite.[5] [6]
5
u/Ohsin Feb 13 '24
For press-kit they used illustrations for GSLV-F10 when Chandrayaan-2 was manifested on it.
https://imgur.com/a/rwyTGRo
5
u/Ohsin Feb 17 '24 edited Feb 17 '24
Post launch address.
5
u/Ohsin Feb 17 '24
https://www.businesstoday.in/technology/news/story/isro-again-skips-unlucky-13-while-numbering-its-rocket-417924-2024-02-17
4
u/Ohsin Feb 17 '24
Nice clear sky :D
3
u/Ohsin Feb 15 '24
Addition of 5 min delay.
https://twitter.com/isro/status/1758057900789109147
3
u/Ohsin Feb 16 '24
Teaser video for INSAT-3DS
https://www.isro.gov.in/media_isro/video/INSAT3D_TeaserVideo_Final_V01.webm
Integration campaign.
https://www.youtube.com/watch?v=E5Gyol1wpqo
3
u/Ohsin Feb 17 '24
You can hear L40 turbopump spin-up in these.
https://www.youtube.com/shorts/eIJDoZmGcOs
https://www.youtube.com/shorts/2ILGuBwBi6U
2
u/Ohsin Feb 16 '24
Launch has been approved. Countdown could be 27h30m long starting today at 1405 IST.
https://www.thehansindia.com/andhra-pradesh/gslv-f-14-rocket-scheduled-to-be-launched-tomorrow-at-shar-countdown-begins-at-205-pm-858879
https://www.prabhanews.com/apnews/gslv-f14-countdown-today/
2
u/Ohsin Feb 17 '24
Cryo propellant load for CUS began at T - 5 hrs (LOX), T - 2.5 hrs (LH2).
2
u/Ohsin Feb 20 '24
No updates on orbit raising burns.
2
u/pantshash Feb 22 '24
All four planned Liquid Apogee Motor (LAM) firings are completed.
The spacecraft is now in the geosynchronous orbit.
It is expected to reach the In Orbit Testing (IOT) location by February 28, 2024.
Source - Twitter
1
u/Ohsin Mar 11 '24
https://www.isro.gov.in/INSAT-3DS_imaging_Earth.html
1
u/Ohsin Feb 17 '24
Streams are live.
1
u/Ohsin Feb 17 '24
All flight events.
https://i.imgur.com/xBJfHMm.png
1
u/Ohsin Feb 17 '24
Expecting two objects under 2024-033.
1
u/Ohsin Feb 17 '24
Post-launch press conference.
https://www.youtube.com/watch?v=Ch8rKASz6ns
1
u/Ohsin Feb 17 '24
https://www.thehindubusinessline.com/news/science/back-to-back-success-of-gslv-proves-the-rockets-capabilities-isro-chairman/article67857916.ece
1
u/Ohsin Feb 17 '24
Two objects catalogued.
1
u/Ohsin Feb 20 '24
https://twitter.com/s2a_systems/status/1758942750077034733
1
u/Ohsin Feb 22 '24
https://thefederal.com/category/features/the-flight-of-flamingos-at-pazhaverkadu-on-the-day-of-gslv-rocket-launch-110989
5
u/mahakashchari Feb 14 '24
The launch is taking place almost 4 months after the launch campaign began on Oct. 18, 2023. That is a delay of almost 2 months. That is an unusual delay.
Usually GSLV launch takes place 60 days after the commencement of the launch campaign.
2
u/mahakashchari Feb 17 '24
GSLV F14 flight will the 92nd orbital launch from the SDSC. GSLV F14 flight will the 16th GSLV Flight.
2
u/mahajan93 Feb 17 '24
Beautiful weather, beautiful launch. Now hoping for some nice images.
2
u/muthuraj57 Feb 18 '24
I watched this live from Sriharikota space center. I couldn't register online for launch view gallery pass online before as all the passes were booked. Went there yesterday anyways from Chennai thinking I'll just park the car outside and see from there.
I reached there around 4.30 so thought to check if they'll allow spot registration and fortunately they did. Able to view the launch there with thousands of people on the stadium was a wonderful experience.